Category:Note to File incl Telcon Record
MONTHYEARML0931406252009-11-17017 November 2009 Summary of Teleconference Verbal Authorization for Relief Request RR-89-67 ML0513802722005-05-17017 May 2005 Summary of Telephone Conference Millstone Power Station, Units 1 and 2, Draft Supplemental Environmental Impact Statement Conducted on April 5, 2005 with Environmental Protection Agency, Region 1... ML0514505242005-04-17017 April 2005 Handwritten Notes Re Millstone Unit 3 ML0515802652002-10-11011 October 2002 Summary of Conference Calls with Northeast Utilities Regarding the 2002 Steam Generator Inspection Results at Millstone Unit 3 2009-11-17
[Table view] Category:Verbal Comm
MONTHYEARML0931406252009-11-17017 November 2009 Summary of Teleconference Verbal Authorization for Relief Request RR-89-67 ML0513802722005-05-17017 May 2005 Summary of Telephone Conference Millstone Power Station, Units 1 and 2, Draft Supplemental Environmental Impact Statement Conducted on April 5, 2005 with Environmental Protection Agency, Region 1... ML0514505242005-04-17017 April 2005 Handwritten Notes Re Millstone Unit 3 ML0515802652002-10-11011 October 2002 Summary of Conference Calls with Northeast Utilities Regarding the 2002 Steam Generator Inspection Results at Millstone Unit 3 2009-11-17
[Table view] Category:Report
MONTHYEARML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification ML24086A4802024-03-22022 March 2024 Alternative Request IR-4-14, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examination for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22193A1432022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Technical Requirements Manual Current Through Change No. 207 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21113A1352021-04-27027 April 2021 Review of the Spring 2017 Steam Generator Tube Inspection Report ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20352A3342020-12-17017 December 2020 Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping ML20345A3682020-12-16016 December 2020 Review of the Fall 2017 and Spring 2019 Steam Generator Tube Inspection Reports ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20171A5342020-08-13013 August 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20105A0782020-04-14014 April 2020 Supplement to License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Components ML19352B8982019-12-17017 December 2019 Proposed Alternative Request RR-05-05, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML19246A1162019-10-0707 October 2019 Supplement to Staff Assessment of Response to 10 CFR 50.54(F) Information Request - Flood Causing Mechanism Reevaluation(Epid Nos. 000495\05000336\L- 2015-JLD-0011 and 000495\05000423\L-2015-JLD-0012 - (2019Aug21) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19211B1682019-07-24024 July 2019 Day Special Report for One Train of Reactor Vessel Level Monitor Inoperable ML19070A2172019-04-0303 April 2019 Supplement to Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood - Causing Mechanism Reevaluation ML19064A5902019-02-28028 February 2019 Proposed Alternative Request IR-3-39, Alternative to ASME Code, Section XI, IWA-4221(C), to Permit Two Fillet Welds Not in Compliance with the Construction Code to Remain in Service ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML18256A2002018-10-0303 October 2018 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (EPID L00495\05000336 L-2015-JLD-0011 and 00495\05000423\L-2015-JLD-0012) ML18247A2752018-06-18018 June 2018 Technical Requirements Manual ML17187A1692017-06-28028 June 2017 Mitigating Strategies Assessment (MSA) Report) ML17108A3272017-04-0606 April 2017 Reactor Vessel Standby Surveillance Capsule Z Dosimetry Analysis and Storage Confirmation ML17051A0012017-02-27027 February 2017 Summary of the NRC Staff'S Review of the Spring 2015 Steam Generator Tube Inservice Inspections ML16193A6702016-06-30030 June 2016 ISFSI - 10 CFR 50.59, 10 CFR 72.48 Change Report for 2014 and 2015, and Commitment Change Report for 2015 ML15328A2682015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML15275A2882015-10-19019 October 2015 Summary of the NRC Staff'S Review of the Fall 2014 Steam Generator Tube Inservice Inspections ML15253A2062015-09-0101 September 2015 ANP-3315NP, Revision 0, Millstone Unit 2 M5 Upgrade, Small Break LOCA Analysis Licensing Report. ML15194A0572015-06-30030 June 2015 ISFSI - NRC Commitment Change Report for 2014 ML15078A2062015-03-12012 March 2015 to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 2-58 Through 2-125 ML15078A2082015-03-12012 March 2015 to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 2-172 Through the End ML15078A2072015-03-12012 March 2015 to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 2-126 Through 2-171 ML15078A2052015-03-12012 March 2015 to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 1 Through 2-57 ML14220A0172014-07-30030 July 2014 Startup Test Report for Cycle 23 ML13338A4332014-01-31031 January 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14013A2712014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13357A3982014-01-24024 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Milestone Power Station, Unit 2, TAC No.: MF0858 ML14006A1592014-01-0808 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Millstone Power Station, Unit 3, TAC No.: MF0859 2024-06-10
[Table view] Category:Miscellaneous
MONTHYEARML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML21113A1352021-04-27027 April 2021 Review of the Spring 2017 Steam Generator Tube Inspection Report ML20345A3682020-12-16016 December 2020 Review of the Fall 2017 and Spring 2019 Steam Generator Tube Inspection Reports ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20171A5342020-08-13013 August 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML20105A0782020-04-14014 April 2020 Supplement to License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Components ML19211B1682019-07-24024 July 2019 Day Special Report for One Train of Reactor Vessel Level Monitor Inoperable ML17187A1692017-06-28028 June 2017 Mitigating Strategies Assessment (MSA) Report) ML17108A3272017-04-0606 April 2017 Reactor Vessel Standby Surveillance Capsule Z Dosimetry Analysis and Storage Confirmation ML17051A0012017-02-27027 February 2017 Summary of the NRC Staff'S Review of the Spring 2015 Steam Generator Tube Inservice Inspections ML16193A6702016-06-30030 June 2016 ISFSI - 10 CFR 50.59, 10 CFR 72.48 Change Report for 2014 and 2015, and Commitment Change Report for 2015 ML15328A2682015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML15275A2882015-10-19019 October 2015 Summary of the NRC Staff'S Review of the Fall 2014 Steam Generator Tube Inservice Inspections ML15194A0572015-06-30030 June 2015 ISFSI - NRC Commitment Change Report for 2014 ML14220A0172014-07-30030 July 2014 Startup Test Report for Cycle 23 ML14013A2712014-01-30030 January 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13303B9072013-10-17017 October 2013 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure ML13192A1022013-07-18018 July 2013 Closure Evaluation for 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML12362A3922012-11-30030 November 2012 Spent Fuel Pool Criticality Analysis with No Credit for Boraflex. ML12353A2422012-11-27027 November 2012 Report in Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.3 ML12187A1752012-06-25025 June 2012 ISFSI - 10 CFR 50.59, 10 CFR 72.48 Change Report for 2010 and 2011, and Commitment Change Report for 2010 and 2011 ML12151A3592012-06-0707 June 2012 End of Cycle 20 Steam Generator Tube Inservice Inspection Report Review ML12046A8362012-01-31031 January 2012 Inservice Inspection Program - Owner'S Activity Report ML12031A1472012-01-25025 January 2012 Day Report for Emergency Core Cooling System Model Changes of 10 CFR 50.46 ML1116002202011-06-13013 June 2011 Exhibit D (Part 3): Millstone 2001 Safstor Cost Analysis (Normal Dollars) ML1028504382010-09-30030 September 2010 Attachments 2, 3, 5, 7, 8 & 9, to 10-579A, Westinghouse Electric Co. LLC, WCAP-17071-NP, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Revision 2, Dated Sep ML1019403352010-06-30030 June 2010 Units, 1, 2, 3, & ISFSI, 10 CFR 50.59, 10 CFR 72.48 Change Report for 2008 and 2009, and the Commitment Change Report for 2009 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1009702062010-03-29029 March 2010 Chemistry Procedure, Liquid Waste Sample Sink, Rev. 003-00 ML0931701762009-11-12012 November 2009 Part 3 of 4--Weld Overlay Examination Report 2R19 ML0931701732009-11-12012 November 2009 Part 2 of 4--Weld Overlay Examination Report 2R19 ML0931701662009-11-12012 November 2009 Part 1 of 4--Weld Overlay Examination Report 2R19 ML0931701852009-09-23023 September 2009 Part 4 of 4--Weld Overlay Examination Report 2R19 ML0921908942009-08-0404 August 2009 Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A ML0913204602009-04-28028 April 2009 2008 Occupational Radiation Exposure Information ML0901303822008-12-26026 December 2008 Revision 002 to CP 3804L Procedure Action Request, Pass Containment Air Sample, Dated 12/26/2008 ML0830903962008-10-24024 October 2008 End of Cycle 18 Steam Generator Tube Inspection Report ML0827701132008-09-30030 September 2008 Response to Request for Additional Information Regarding Spent Fuel Pool Storage License Amendment Request ML0819800752008-07-0707 July 2008 Revision to Control Room and OSC Assembly Area Building 475 1st Floor, and SAP Locker ML0818406072008-07-0101 July 2008 Final Evaluation of Weld Overlay Examinations in Refueling Outage 18 ML0727504022007-09-27027 September 2007 Alternative Request RR-89-64 for Use of a Limited One-Sided Ultrasonic Examination Technique LBDCR 07-MP2-034 ML0720003902007-07-13013 July 2007 Attachment 1, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Descriptions, Technical Analysis and Regulatory Analysis for the Proposed Operating License and Technical Specifications Changes ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0713501882007-05-17017 May 2007 Review of Steam Generator Tube Inservice Inspection Report for the 2005 Refueling Outage at Millstone Power Station, Unit No. 2 ML0713502492007-05-0808 May 2007 Steam Generator Tube Plugging Report ML0708805652007-03-28028 March 2007 Response to Request for Additional Information Regarding an Alternative for the Weld Overlay of Pressurizer Nozzle Welds ML0705903272007-02-27027 February 2007 Fitness-For-Duty Program Semi-Annual Performance Data Report 2023-07-26
[Table view] |
Text
(a)
K~tA 3 - M193 4V.
IIyo Ci4 ea -nA a, ~- -.
-9 V.7 L v? L v~7L IV f%
_ _ _ _~ A ~ U Jr . - 4
- 4. ~~i e 1
. 4 /&-L 13 3 -
- >A AY -
eq&a f0 dotg AZW.1 AYV Page 2
,,. _ *&43 cT- NY/C--
i30 E tA - S4f.; A t1 9 StVr CY-& 9M.
_7 ZAo uC2, z4 3 0 - o42W
~J e}6ucL ~ gOCs ctLr /~( 1rX*
Sto1M)~4 I
I/_ J-aye4,( P,(4 - 4&L
- 54d*44 3 t 4tt A- &--C 4 h6Z d4zlt-d-4 &5 3LA -
(V7, f A*
If *? - otJ~t~~A A Af&L 2 ? IL Co) 4 A A14*45 C>Z3so') - ,I tA
_o tc AS: at ;,'-,
Z Sg. P z . * -
i 6 /a -33 7 -6(,;7 RI CFA nec, N-966->8 Ir -
-9F SGfr > cztf°k7~
S ef AeA, SC PA Q ~42 A eQ ? qe,,- 1 P K-919 - 666 - -7295 "C4. -F/, & /",
ISE/SooC pH ~~I-
' oo
S. :s I TELEPHONED I
I I
PLEASE CALL CALLEDTO SEEYOU I RETURNED CALL WILLCALLAGAIN I URGENT DATE -- TIME PHONE CALLS MESSAGE
. - tI* I1n WHILE OUTv RECORD (jt ( I} y AI I M. _r Ca'&A4-' ) I~ 'I "S'o-4 OF_
jVini t-1 'T 4/tP a
'-y>-.
I..-
- .'. III e 't.( ..
PHONE %L~-
. l-..^ TAKEN AY-nu--
I tTu
.. ,. ,^o,
,\
\ k,
,) . .
-(/IV- r kp Pa 6.. D TELEPHONED I PLEASE CALL _
TO DATE TITIME 96 1 CALLED TO SEE YOU LLCALLAGAIN _p I RETURNED CALL URGENT I I PHONE CALLS ESSAGE 1'
IWHILE OUr RECORD TAKEN BY:
z: -r' .
2rl 2~l \ ck A I,
(g) 0829 Mill-3 Rx and SI Trip because of low steam pressure on 'B1 steam line. MSIVs closed. Several main steam safety valve lifted. Primary safety lifted and then reseated. Entered E-0.
0842 Millstone 3 declared an Alert CIdue to main steam safety relief valve lift on "B" steam generator (20 Main steam safety valves total at Millstone-3). Reactor trip occurred. SI occurred.
0953 NRC entered Monitoring Mode NRC Requested ERDS to be initiated - Dominion having some difficulty in establishing ERDS 1005 First responder arrived in Region I IRC 1010 NRC Requested ERDS to be initiated - Dominion having some difficulty in establishing ERDS 1040 NYS contacts NRC Ops Center to request event briefing.
1045 R. Bores contacted RI IRC. CT notified and NYS (A. Feeney) will be notified.
Bores ETA @ IRC - 11:30.
1054 Status update - Terry turbine started and then tripped restarted currently feeding with three aux feed pumps.
1058 SRI in the Millstone control room. MSI\Vs are closed, ADVs are being used for pressure, three AFW pumps in service 1105 Status update from Dominion - Cause for trip is not determined. Dominion has considered tampering and has no reason to believe that tampering is an issue.
After SI pressurizerwent solid. Met SI termination criteria. Established normal charging currently pressurizer level 64% and pressurizer pressure 2002 psig.
Dominion has send some individuals to the armory but state personnel are not present. Dominion has some personnel in its corporate EOF. Radiation levels are normal. No evidence of a primary/secondary leak. Dominion is developing criteria for terminating from the Alert. An increase of level in the PRT indicates evidence of some primary system leakage.
1113 ERDS has not yet been established 1130 W. Lanning requested SRI to provide briefing on the event.
1132 W. Lanning I Max Schnieder updating Ellis - PRL 64% PRT 82% increasing slowly 2200 RX pressure. Dominion developing termination criteria. No evidence of tampering but still being purused. ADVs controlling pressure. During the week replaced power supply on pressure instruments for the uB' steam line.
Page 1
i Robert Bores - Millstone IR 1 update.doc -Page 1i FEMA, Region One 99 High Street Boston, MA 02110 617-956-7501 INCIDENT REPORT
- 1. INCIDENT REPORT: #1 (Update)
- 2. TYPE OF INCIDENT: CT-Alert Millstone-04I17/05
- 3. INCIDENTOCCURANCE 04/17/05,0843
- 4. INCIDENT REPORT: 04/17/2005,1225 S. DESCRIPTION: An Alert, Charlie One, Classification of an event at the Millstone Nuclear Power Station, Unit 3, occurred on the morning of 4/17/05 at 0843. There was an un-isolatablc steam break in the secondary unit which did not involve a release of radiation. Since then the valve has been closed manually. The plant status is stable and there has been NO RELEASE OF RADIATION. Tere is no risk to off-site personnel.
Unit 2 is off-line for refueling at this time and there awe 600 working on-site for this refueling. There have been no injuries and no evacuations on-site or off-site. The Utility EOF is fully staffed and the State EOC staff is either there or on their way. CT DEP Radiation Control Unit Staff and Dominion personnel are at the State EOC.
Unit 3 will go into a cold shutdown until it is determined what caused the valves to tip.
This could take some time due to the need to cool down at a rate of 100 degrees per hour.
A News Release has been issued by Dominion and the State EOC is getting that out to the locals and contiguous states.
The DEP Radiological Unit has sent an individual to the State EOC. Dr. Wildes, the Direcotr of the Radiation Program for CT concurs with the Licensee's control room and EOF staff that there has been NO Radiological release and there is NO radiological contamination on site because this incident occurred on the secondary side of the unit where there is no radiation.
This is considered to be a minor event and will hopefully be closed out today.
- 6. LOCATION: Millstone Nuclear Power Station, Unit 3,Waterford, Connecticut
i Robert Bores - Millstone IR 1 update.doc . Page2
- 7. SOURCE OF INFORMATION: State of Connecticut lead Radiological Planner; State of Connecticut Operations Officer.
- 8. STATE AND LOCAL RESPONSE: State EOC is staffed with Emergency personnel, Department of Environmental Protection staff and licensee Liaisons
- 9. FEDERAL ASSISTANCE: FEMA Region I's State Liaison Officers to the State of Connecticut have been placed on standby. At this time the State does not expect to request their deployment.
- 10. ADDITIONAL INFORMATION and CONTACT: There will be another conference call at 1330. The Region will participate and be in communication with Connecticut and the Nuclear Regulatory Commission until the incident closes.
CONTACT: Deborad S. Bell, Technical Services Branch Chief and RAC Chair Home telephone: 207-938-2378 Cellulw. 617447-0484 EmailhDeborab.bell@dhs.gov