Management Readiness Review Prior to U2 Reactor Startup
ML051450504
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/17/2004
From: Wessling V
Dominion
To: Scace S
Dominion, Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0208
Download: ML051450504 (3)


Text

6Oa 4f4~ CS5o4; oIo--

`4Dominion- Memorandum March 17,2004 To: Steven Scace Director Nuclear Safety & Licensing, Millstone Station From: Vince Wessling I Bob Barron Acting U2 Mode Change Coordinator Management Readiness Review Prior to U2 Reactor Startup A SORC meeting is necessary to assess whether the station is ready to restart the reactor following the forced outage. To establish the readiness for restart, the management team must evaluate many areas and receive concurrence I feedback from the required departments prior to Senior Management providing the approval for Reactor Startup.

The meeting attendees shall establish whether the station is ready to restart by evaluating the following:

a. Discussion of planned and emergent work during the forced outage.

UB" SGFP troubleshooting (M2-04-02476) _ pclfe$S. W'c WI'.

r "A" AFW failure to auto-start (Determined to have operated as designed) 2-MS-SV-252, 242 boot repairs & EBSP integrity (M2-04-02474, 02475, 24hr LCO. Boots are being repaired. ('kw 6ooe 're Ac s q%

94. Performed Enclosure Building pull down tests of both facilities of EBFS with

/, the boots removed from the safeties, out of LCO Aiht A e5' &BASS, /

4 #4 Rectifier cooling leak (repaired under M2-04-02477, evaluating extent of 2 condition) ( ,4#/

-6. RBCCW Rad Monitor spike (I&C troubleshooting per M2-04-02485) VAI sl< "A" SGFP speed oscillations (operated as designed, need procedure Change as J long term resolution)

Stack WR monitor has been reset. Open item to resolve why VR-i l did not make-before-break (assuming that is the new design).

14. 'A" SGFP mini-flow controller found in manual. (found to have occurred as

/ result of VR-1 I transfer

10. Main Turbine turning gear indication, failure to go to fast (M2-04-02478)

Al. MS-2AfB did not auto close. (per S. Baker issues with pressure switch reliability, replacement switch installation per M2-04-02479)

MS-252 S/G safety lifted below set point, issue resolved

3. Repairs toHD-104 C_

(.. 'l/(o u / ICz 1o

a. Status of all open AWO's andAR's. 5 c/4/ / aJ 3
b. On fe iad eus rt
b. Overall material condition of the Unit and rediesorccnInOUs operain
c. Departmental Readiness reviews on the work that was performed, activities still in progress and estimated completion, and any unresolved items that would or could Page I of 2 Assessment memo2.doc

/

challenge continuous plant operation. Additional departmental interfaces and manpower needs required for startup.

d. Operations Department review of Post Maintenance Testing for Reactor Startup Reviewed all new CR's written today Cc: SORC Members Shift Manager.

¢ 16 fsa p7 s(F Page 2 of 2 Assessment memo2.doc

'104e reet &ado' pa2 i6,A-lvJ- +/-4t 96L4 X&uka4" fr rev

- Orit .SVCAf / S5aY.

'aINYC~es, de- sc 6;, b..~J.w£4)

I5/s et TIC