Issue date: 05/16/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-114
Download: ML051440362 (3)


Text

0 F=PL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 May 16,2005 L-2005-114 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, William,4effersi Vice President St. Lucie Plant WJ/KWF Attachment

,`---, 2 an FPL Group company

-'9

.. k..

1 I

,.e L-2005-1 14 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME T:

DATE Uri COMPLETED BY R

TELEPHONE Tr, REPORTING PERIOD:

-335

t. Eu-c e 1

'72J467-7465 April 2005

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 719.00 719.00 0.00 613,660.00 Yr-to-Date 2,879.00 2,879.00 0.00 2,461,536.00 Cumulative 204,007.12 202,108.85 0.00 165,886,778.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason Down 2 Comments

SUMMARY

St. Lucie Unit I operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

..- " i - ,. !  i. 11 L-2005-1 14 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME ST DATE IT, COMPLETED BY T.

TELEPHONE 7V REPORTING PERIOD:

-389

t. Lu-cie 2-

.K. oler-

'72)467-7465 April 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 719.00 719.00 0.00 606,315.00 Yr-to-Date 1,900.70 1,845.07 0.00 1,491,657.00 Cumulative 166,038.92 164,027.94 0.00 135,320,067.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date 5: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)