ML051440362
| ML051440362 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/16/2005 |
| From: | Jefferson W Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2005-114 | |
| Download: ML051440362 (3) | |
Text
0 F=PL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 May 16,2005 L-2005-114 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the April 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, William,4effersi Vice President St. Lucie Plant WJ/KWF Attachment
,`---, 2 an FPL Group company
-'9
.. k..
1 I
,.e L-2005-1 14 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME T:
DATE Uri COMPLETED BY R
TELEPHONE Tr, REPORTING PERIOD:
-335
- t. Eu-c e 1
'72J467-7465 April 2005
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 719.00 719.00 0.00 613,660.00 Yr-to-Date 2,879.00 2,879.00 0.00 2,461,536.00 Cumulative 204,007.12 202,108.85 0.00 165,886,778.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason Down 2 Comments
SUMMARY
- St. Lucie Unit I operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
..- " i - ,. ! i. 11 L-2005-1 14 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME ST DATE IT, COMPLETED BY T.
TELEPHONE 7V REPORTING PERIOD:
-389
- t. Lu-cie 2-
.K. oler-
'72)467-7465 April 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 719.00 719.00 0.00 606,315.00 Yr-to-Date 1,900.70 1,845.07 0.00 1,491,657.00 Cumulative 166,038.92 164,027.94 0.00 135,320,067.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date 5: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- St. Lucie Unit 2 operated in Mode I for the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or safety valves during the report period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)