April 2005 Monthly Operating Report for Perry, Unit 1
ML051390232
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/12/2005
From: Richard Anderson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2885L
Download: ML051390232 (3)


Text

FENOC I _t Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 May 12, 2005 PY-CEI/NRR-2885L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the April 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector 629ef

OPERATING DATA REPORT UNIT: Perry DATE: 5/7/05

1. Docket: 50-440
2. Unit Name: Perry Nuclear Power Plant
3. Reporting Period April 2005
4. Utility

Contact:

T. Phelps

5. Telephone: 440-280-7660
6. Design Electrical Rating (Net MWe): 1260
7. Maximum Dependable Capacity (Net MWe): 1235 This Month Yr-to-Date Cumulative
8. Hours Reactor was Critical 0.0 653.2 121 .322.6
9. Hours Generator On-Line 0.0 624.4 118,515.5
10. Unit Reserve Shutdown Hours 0.0 0.0 0.0
11. Net Electrical Energy (MWeH) 0.0 6A AAA A v- v.v__.v 130 wvvvLv._vv.v 390 0A A

Page 1

c UNIT SHUTDOWNS REPORT MONTH - APRIL 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 517/05 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No. Date Type Duration Reason Method Cause and Corrective Acton to Prevent Recurrence I Hours 2 3 05-02 2/22/05 S 1,631.0 C 4 The plant entered refuel outage #10 on February 22, 2005 @0001 .

SUMMARY

The Perry Nuclear Power plant commenced refuel outage #10 on 2/22/05 and continues to perform refuel outage activities through the month of April. *-- -. ,~is,
1. TYPE: 2. REASON: 3. METHOD:

F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4- Continuation E - Operating Training & 5 - Other License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

Page 2