FENOC Perry Nuclear Power Plant I _ t 10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 May 12, 2005 PY-CEI/NRR-2885L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the April 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector 629ef
OPERATING DATA REPORT UNIT:
Perry DATE:
5/7/05 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period April 2005 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 8.
9.
10.
11.
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 0.0 0.0 0.0 0.0 Yr-to-Date 653.2 624.4 0.0 6A AAA A Cumulative 121.322.6 118,515.5 0.0 130 390 0A A
v-v.v__.v wvvvLv._vv.v Page 1
c UNIT SHUTDOWNS REPORT MONTH - APRIL 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 517/05 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Acton to Prevent Recurrence I
Hours 2
3 05-02 2/22/05 S
1,631.0 C
4 The plant entered refuel outage #10 on February 22, 2005 @0001
SUMMARY
- The Perry Nuclear Power plant commenced refuel outage #10 on 2/22/05 and continues to perform refuel outage activities through the month of April.
,~ is,
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continuation 5 - Other Page 2