April 2005 Monthly Operating Report for Millstone Power Station Units 2 & 3
ML051390181
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/11/2005
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
05-291
Download: ML051390181 (8)


Text

c Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road WaterFord, CT' 06385 Dominion-MAY I I 200 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

MPS Lic/BAK Docket Nos.05-291 RO 50-336 50-423 DPR-65 NPF-49 License Nos.

DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNITS 2 AND 3 APRIL 2005 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for the Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for the Millstone Power Station Unit 3 (MPS3), attached are the Monthly Operating Reports for the month of April 2005. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.

If you have any questions or require additional information, Mr. David W. Dodson at (860) 447-1791, extension 2346.

please contact Very truly yours, Stelhen P. Sarver, Director Nuclear Station Operations and Maintenance

--r 4-

Serial No.05-291 April 2005 Monthly Operating Report Page 2 of 2 Attachments:

2 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. G. F. Wunder Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08-B-1A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

Serial No.05-291 April 2005 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)

Millstone Power Station Unit 2 Dominion Nuclear Connecticut, Inc. (DNC)

Serial No.05-291 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 05/02/2005 S. Claffev (860) 447-1791 2456 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 2

2. Reporting Period:

April 2005

3. Licensed Thermal Power (MWt):

2700.0

4. Design Electrical Rating (Net MWe):

883.5

5. Maximum Dependable Capacity (Net MWe):

877.7

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7. Number of Hours Reactor Was Critical 191.4 2351.4 169086.2
8. Hours Generator On-Line 191.3 2351.3 163265.0
9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
10.

Net Electrical Energy Generated (MWH) 160537.6 2068241.0 134541853.7 OPERATING

SUMMARY

The unit operated at or near 100% power for the month of April except for a downpower to 85% on April 7h to perform Simmer Testing of Main Steam Safety Valves prior to shutting down the unit on April 9"h for Refueling Outage 16.

Serial No.05-291 UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 05/02/2005 S. Claffey (860) 447-1791 2456 REPORTING MONTH: APRIL 2005 (PRIVAT DATE TYPE DURATION REASON2 METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS E INO.

(HOURS)

DOWN REACTOR 3 COMMENTS 05-01 04/09/2005 S

527.7 C

I Shutdown for Refueling Outage 16.

l 2

3 R:

Forced Reason:

Method:

S:

Scheduled A -Equipment Failure (Explain)

I - Manual 1 - Maintenance or Test 2 - Manual Trip C-Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F-Administrative G - Operational Error (Explain) 11-Other (Explain)

Serial No.05-291 April 2005 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)

Millstone Power Station Unit 3 Dominion Nuclear Connecticut, Inc. (DNC)

Serial No.05-291 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 05/01/05 K. Cook (860) 447-1791 6572 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 3

2. Reporting Period:

April 2005

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1156.5

5. Maximum Dependable Capacity (Net MWe):

1148.0

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 411.9 2571.9 121657.5

8. Hours Generator On-Line 402.3 2562.3 119843.0
9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 10.INet Electrical Energy Generated (MWH) 456236.3 2961522.6 131792424.5 OPERATING

SUMMARY

Millstone Unit 3 operated at or near 100% power until 0829 hours0.00959 days <br />0.23 hours <br />0.00137 weeks <br />3.154345e-4 months <br /> on April 17, 2005 when an automatic reactor trip occurred due to a failed logic card on the solid state protection system. The reactor was taken critical at 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br /> and the generator was phased to the grid at 1313 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />4.995965e-4 months <br /> on April 30, 2005.

W Serial No.05-291 UNIT SHUTDOWNS J.r-DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 05/01/05 K. Cook (860) 447-1791 6572 REPORTING MONTH: APRIL 2005 (PRIVAT DATE TYPE' DURATION REASON 2 METIHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS E )NO.

(IOURS)

DOWN REACTOR 3 CO1%ZIENTS 05-01 4/17/05 F

316.7 A

3 The plant had an automatic reactor trip due to a failed logic card in the SSPS system. The faulty card was replaced and other components were checked for similar conditions.

l 2

3 F.:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative

  • - Operational Error (Explain)

H - Other (Explain)