NRC CY2004 Annual Assessment Meeting TURKEY POINT Homestead, Florida Homestead, Florida May 18, 2005 May 18, 2005
Purpose of Todays Meeting
- A public forum for discussion of Turkey Point A public forum for discussion of Turkey Point performance performance
- NRC will address Turkey Point performance issues NRC will address Turkey Point performance issues identified in the annual assessment letter identified in the annual assessment letter
- Turkey Point management will be given the opportunity Turkey Point management will be given the opportunity to respond to the information in the letter and inform the to respond to the information in the letter and inform the NRC of new or existing programs to maintain or NRC of new or existing programs to maintain or improve their performance improve their performance
Agenda
- Introduction
- Organization and purpose
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Turkey Point Plant Performance Assessment Results
- Turkey Point Management Response and Remarks
- NRC Closing Remarks
- Break
- NRC Available to Address Public Questions
NRC Performance Goals Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials PRIMARY GOALS OTHER GOALS
- Ensure openness in NRC regulatory process
- Ensure that NRC actions are effective, efficient, realistic, and timely
- Ensure excellence in NRC management to carry out the NRCs strategic objective
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
Examples of Baseline Inspections z Equipment Alignment
~92 hrs/yr z Triennial Fire Protection
~200 hrs every 3 yrs z Operator Response
~125 hrs/yr z Emergency Preparedness
~80 hrs/yr z Rad Release Controls
~100 hrs every 2 yrs z Worker Radiation Protection ~100 hrs/yr z Corrective Action Program
~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Performance Thresholds Safety Significance Green:
Very low safety issue White:
Low-to-moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue NRC Inspection Efforts Green:
Only Baseline Inspections White:
May increase NRC oversight Yellow:
Increased NRC oversight Red:
Increased NRC oversight and other NRC actions
Action Matrix Concept Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
Total 102*
- Davis-Besse under a special inspection process
Turkey Point CY2004 Inspection Activities
- 5083 hours0.0588 days <br />1.412 hours <br />0.0084 weeks <br />0.00193 months <br /> of inspection related activities
- Licensed operator requalification program inspection
- Engineering modifications inspection
- Radiation protection inspections
- Maintenance inspections
- Fire protection inspection
- Emergency preparedness inspection
- Safety system design and performance capability inspection
- Problem identification and resolution inspection
- Reactor head replacement and containment repair inspections
Turkey Point CY2004 Assessment Results
- Both units performance were within the Licensee Response Column of the NRCs Action Matrix
- All inspection findings were classified as very low safety significance (Green)
- All performance indicators (PI) were Green
Turkey Point Annual Assessment Summary
- Florida Power and Light Company operated Turkey Point in a manner that preserved public health and safety
- All cornerstone objectives were met
- NRC plans baseline inspections at Turkey Point for the remainder of CY 2005
Turkey Point CY2005 Inspection Activities
- Resident inspector daily inspections
- Radiation protection inspections
- Maintenance inspections
- Engineering modifications inspection
- Emergency preparedness inspection
- Reactor operator initial exam
- Reactor head replacement and containment repair inspections
NRC CY2004 NRC CY2004 Annual Assessment Meeting Annual Assessment Meeting TURKEY POINT Homestead, Florida May 18, 2005
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)