6/15/05, Perry - Correction to Safety Evaluation Revisions to Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Pursuant to Commission Order EA-03-086
ML051370196
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/15/2005
From: Suh G
NRC/NRR/DLPM/LPD3
To: Richard Anderson
FirstEnergy Nuclear Operating Co
Macon W, NRR/DLPM,415-3965
References
EA-03-086, TAC MC5378
Download: ML051370196 (5)


Text

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION NOTICE: Enclosure contains Safeguards Information. Upon separation from Enclosure, this letter is DECONTROLLED.

June 15, 2005 Mr. Richard L. Anderson Vice President - Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant, Unit 1 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO SAFETY EVALUATION RE: REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN PURSUANT TO COMMISSION ORDER EA-03-086 (TAC NO. MC5378)

Dear Mr. Anderson:

By letter dated October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative license change to the Perry Nuclear Power Plant, Unit 1, Facility Operating License NPF-58, to incorporate the reference to the recently-revised physical security plan, training and qualification plan, and safeguards contingency plan.

By letter dated December 10, 2004, you identified inconsistencies in the safety evaluation (SE) associated with the October 28, 2004, letter. The NRC staff has reviewed the inconsistencies identified in your letter, and concluded that the inconsistencies required modification of the SE.

For the most part, the inconsistencies you identified were either editorial in nature or clarified the SE with regard to statements made in the revised security plans. The NRC staff also determined that several of the items identified did not warrant changes. The corrections made to the SE did not affect the NRC staffs previous evaluation of the revised security plans.

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION R. L. Anderson The corrected SE pages are enclosed. The revised portions of the SE are denoted with revision bars. The NRC staff regrets any inconvenience the inconsistencies may have caused.

If there are any further questions, please contact the NRC Project Manager, Mr. William Macon at 301-415-3965.

Sincerely,

/RA/

Gene Y. Suh, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Corrected SE pages (SAFEGUARDS INFORMATION) cc w/enclosure: Mr. Ronald Rose, Site Protection Manager cc w/o enclosure: See next page

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION R. L. Anderson June 15, 2005 The corrected SE pages are enclosed. The revised portions of the SE are denoted with revision bars. The NRC staff regrets any inconvenience the inconsistencies may have caused.

If there are any further questions, please contact the NRC Project Manager, Mr. William Macon at 301-415-3965.

Sincerely,

/RA/

Gene Y. Suh, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Corrected SE pages (SAFEGUARDS INFORMATION) cc w/enclosure: Mr. Ronald Rose, Site Protection Manager cc w/o enclosure: See next page DISTRIBUTION (w/o encl):

PUBLIC RidsNrrPMWMacon SMorris GGrant, RIII PDIII-2 R/F RidsNrrLADClarke ARichardson HNieh RidsNrrDlpmDpr RidsNrrDlpmLpdiii2 (GSuh)

PLee Accession Number: ML051370196 Nrr-106 OFFICE PDIII-2/PM PDIII-2/LA NSIR/RSS NSIR/RSS PDIII-2/SC NAME WMacon DClarke ARichardson PLee GSuh DATE 6/15/05 6/10/05 6/13/05 6/13/05 6/15/05 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit 1 cc w/o

Enclosure:

David W. Jenkins FirstEnergy Corporation 76 South Main St.

Akron, OH 44308 Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4531 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager - Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A210 10 Center Road Perry, OH 44081 Director, Site Operations FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-7150 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Zack A. Clayton DERR Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081 Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 Joseph J. Hagan Senior Vice President, Engineering and Services First Energy Nuclear Operating Company 76 South Main Street Akron, OH 44308 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308

Perry Nuclear Power Plant, Unit 1 cc:

Director, Regulatory Affairs FirstEnergy Nuclear Operating Company 395 Ghent Road Akron, OH 44333