Text
A I
Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 I
Constellation Energy May 12,2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 April 2005 Monthly Operating Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have questions regarding this matter, please contact Mr. L. S. Larragoite at (410) 495-4922.
Very truly yours, David A. Holm Plant General Manager DAH/CAN/bjd
Attachment:
April 2005 Monthly Operating Reports cc:
R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. I. McLean, DNR S. Mainieri, INPO K. N. Larson, ANI
-x-11
I ATTACHMENT APRIL 2005 MONTHLY OPERATING REPORTS Calvert Cliffs Nuclear Power Plant, Inc.
May 12, 2005
MONTHLY OPERATING REPORT Docket No. 50-317 Calvert Cliffs Unit I May 5, 2005 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
APRIL 2005 845 870 Year-Cumulative
- This month to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,855.3 202,979.6
- 2. HOURS GENERATOR ON LINE 719.0 2,845.4 199,766.2
- 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 4. NET ELECTRICAL ENERGY GENERATED (MWH) 633,732 2,534,484 164,208,181
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - UI May 5. 2005 Herman 0. Olsen (410) 495-6734 REPORTING MONTH April 2005 TYPE DURATION I
METHOD OF CAUSE/CORRECTIVE ACTIONS NO.
DATE F:
FORCED DHURATIO REASON' SHUTITING S:
SCHEDULED (H
)
DOWN2 COMMENTS There were no shutdowns this month.
1 Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
1 - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I May 5, 2005
SUMMARY
OF OPERATING EXPERIENCE April 2005 The unit began the month at 100% reactor power.
On 04/20/2005 at 0200 reactor power was reduced to -97% for eddy current testing of 13B waterbox.
Power was further reduced to -95% due to a high condenser differential temperature on 13B waterbox.
The waterbox was cleaned and eddy current testing was performed and completed on 04/22/2005 at 1500.
Power was returned to 100% at 1715.
The unit continued to operate at 100% power for the remainder of the month.
MONTHLY OPERATING REPORT Docket No. 50-318 Calvert Cliffs Unit 2 May 5, 2005 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
APRIL 2005 845 858 Year-Cumulative
- This month to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,404.9 195,866.1
- 2. HOURS GENERATOR ON LINE 719.0 2,368.8 193,936.6
- 3. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 4. NET ELECTRICAL ENERGY GENERATED (MWH) 636,448 2,061,416 160,356,904
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-3 18 Calvert Cliffs-U2 May 5. 2005 Herman 0. Olsen (410) 495-6734 REPORT MONTH April 2005 TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS NO.
DATE F:
FORCED DURATION REASON SHUTTING S:
SCHEDULED (HOURS)
DOWN 2 COMMENTS There were no shutdowns this month.
1 Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 May 5, 2005
SUMMARY
OF OPERATING EXPERIENCE April 2005 The unit operated at 100% for the entire month.