ML051330327

From kanterella
Jump to navigation Jump to search
Confirmation for 05/26/2005 Meeting with Firstenergy Nuclear Operating Company Inspection Procedure 95003 Public Exit Meeting
ML051330327
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/13/2005
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To: Richard Anderson
FirstEnergy Nuclear Operating Co
References
Download: ML051330327 (3)


Text

May 13, 2005 Mr. R. Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, A290 10 Center Road Perry, OH 44081

Dear Mr. Anderson:

This letter confirms the discussion between members of our staffs to have a meeting at 2:00 p.m. (EDT) on Thursday, May 26, 2005, at the Renaissance Quail Hollow Resort, located at 11080 Concord-Hambden Road, Painesville, Ohio 44077.

The purpose of the meeting is to discuss the results of the 95003 Inspection at Perry. This was a Supplemental Inspection performed on-site from January 10 through May 6, 2005. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

We appreciate your cooperation in this matter. If you have any questions regarding this meeting, please contact me at 630-829-9619.

Sincerely,

/RA/

Christine Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 See Attached Distribution DOCUMENT NAME: E:\\Filenet\\ML051330327.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME GRoach/trn CLipa DATE 05/13/05 05/13/05 OFFICIAL RECORD COPY

R. Anderson cc:

G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs W. OMalley, Manager, Maintenance Department Manager, Regulatory Compliance J. Messina, Director, Performance Improvement T. Lentz, Director, Nuclear Engineering Department F. von Ahn, Plant Manager, Nuclear Power Plant Department D. Jenkins, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

R. Anderson ADAMS Distribution:

GYS SPS1 RidsNrrDipmIipb GEG KGO RJP DRPIII DRSIII PLB1 JRK1