ML051310268

From kanterella
Jump to navigation Jump to search
Public Meeting Summary D. C. Cook End-of-Cycle Plant Performance Assessment
ML051310268
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/09/2005
From: Lerch R
Division Reactor Projects III
To:
Indiana Michigan Power Co
References
Download: ML051310268 (5)


Text

May 9, 2005 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 21, 2005, PUBLIC MEETING TO DISCUSS THE D.C. COOK END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 21, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III Management and Indiana Michigan Power Company representatives to discuss the NRCs End-of-Cycle Assessment of licensee performance. The meeting notice and NRC presentation can be found in ADAMS as ML050950381 and ML051260391 respectfully. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the Reactor Oversight Process and the Action Matrix in general. This was followed by a discussion of the NRCs End-of-Cycle assessment of D.C. Cooks performance for calendar year 2004, which is documented in the March 2, 2005, End-of-Cycle assessment letter.

The licensees presentation responded to the NRCs assessment documented in the March 2, 2005, End-of-Cycle letter, and specifically addressed their commitment to improve performance and continue to operate Cook Nuclear Plant in a manner that preserves public health and safety. The licensees presentation can be found in ADAMS as ML051260367.

/RA/

Robert M. Lerch, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

As Stated See Attached Distribution

May 9, 2005 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 21, 2005, PUBLIC MEETING TO DISCUSS THE D.C. COOK END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 21, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Lake Charter Township Hall in Bridgman, Michigan. The meeting was between NRC Region III Management and Indiana Michigan Power Company representatives to discuss the NRCs End-of-Cycle Assessment of licensee performance. The meeting notice and NRC presentation can be found in ADAMS as ML050950381 and ML051260391 respectfully. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the Reactor Oversight Process and the Action Matrix in general. This was followed by a discussion of the NRCs End-of-Cycle assessment of D.C. Cooks performance for calendar year 2004, which is documented in the March 2, 2005, End-of-Cycle assessment letter.

The licensees presentation responded to the NRCs assessment documented in the March 2, 2005, End-of-Cycle letter, and specifically addressed their commitment to improve performance and continue to operate Cook Nuclear Plant in a manner that preserves public health and safety. The licensees presentation can be found in ADAMS as ML051260367.

/RA/

Robert M. Lerch, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

As Stated See Attached Distribution DOCUMENT NAME: E:\Filenet\ML051310268.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N RIII NAME R.Ruiz:co R.Lerch DATE 04/09/05 04/09/05 OFFICIAL RECORD COPY

Indiana Michigan Power Company cc w/encl: J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists

Indiana Michigan Power Company ADAMS Distribution:

WDR CFL RidsNrrDipmIipb GEG KGO BJK1 CAA1 DRPIII DRSIII PLB1 JRK1

Enclosure Meeting Participants NRC M. Satorius, Director, Division of Reactor Projects R. Lerch, Chief, Branch 6, Division of Reactor Projects B. Kemker, Senior Resident Inspector, D.C. Cook F. Ramirez, Resident Inspector, D.C. Cook Indiana Michigan Power Company D. Fadel, Vice President of Engineering, D.C. Cook L. Weber, Acting Plant Manager, D.C. Cook J. Zwolinski, Safety Assurance Director, D.C. Cook