ML051300077
ML051300077 | |
Person / Time | |
---|---|
Issue date: | 06/01/2005 |
From: | Schulten C NRC/NRR/DIPM/IROB |
To: | Schoppman M Nuclear Energy Institute |
Schulten C. S., NRR/IROB/TSS, 415-1192 | |
Shared Package | |
ML051290290 | List: |
References | |
Download: ML051300077 (9) | |
Text
June 1, 2005 Mr. Mike Schoppman Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
Dear Mr. Schoppman:
SUBJECT:
SUMMARY
OF MEETING ON APRIL 25, 2005, WITH THE NUCLEAR ENERGY INSTITUTE (NEI) OPERABILITY DETERMINATION PROCESS TASK FORCE The purpose of this letter is to transmit the summary of the Nuclear Regulatory Commission (NRC) staff meeting with the Operability Determination Process Task Force. The meeting was held at the Excel Services Corporation offices in Rockville, Maryland, on April 25, 2005. At the meeting, the staff and task force members discussed proposed changes to operability guidance for resolution of degraded or nonconforming conditions adverse to safety or quality. The meeting topics considered were primarily issues from the Nuclear Energy Institute high priority items list that were first discussed at the February 17, 2005 meeting. The next meeting is scheduled for May 10-13, 2005, in Rockville, Maryland, to continue discussing open high priority action items.
Sincerely,
/RA/
Carl S. Schulten, Senior Reactor Engineer Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
Enclosures:
- 1. Meeting Summary
- 2. Agenda
- 3. Attendance List
- 4. NRC-NEI_Markup cc w/encls: See attached page
Package: ML051290290, Letter: ML051300077, RIS: ML051300079 OFFICE TSS:IROB:DIPM SC:TSS:IROB:DIPM NAME CSSchulten THBoyce DATE 06/01/2005 06/01/2005 DISTRIBUTION:
ADAMS PUBLIC IROB R/F TSS Staff RidsNrrDipm RidsNrrDssa RidsNrrDlpm RidsNrrDssaSplb RidsNrrDipmlehb RidsOgcRp RidsAcrsAcnwMailCenter SBarber (GSB)
BBurgess (BLB)
BDesai (BBD)
WBJones (WBJ)
DJNelson (DJN)
LWert (LXW1)
SAlexander (SDA)
RBlough (ARB)
SBurton (SXB3)
EMcKenna (EMM)
JTrapp (JMT1)
WReckley HChernoff DGraves (DNG)
cc via e-mail:
Mr. Mike Schoppman Nuclear Energy Institute Ms. Laurie Lahti Nuclear Management Company Mr. Pete LeBlond LeBlond Associates Mr. Jeff Thomas Duke Energy Mr. Jim Kilpatrick Constellation Energy Mr. Getachew Tesfaye Constellation Energy Mr. Donald Hoffman Technical Specifications Task Force Mr. Brian Mann Technical Specifications Task Force
SUMMARY
OF THE APRIL 25, 2005, NUCLEAR REGULATORY COMMISSION MEETING WITH THE NUCLEAR ENERGY INSTITUTE OPERABILITY DETERMINATION PROCESS TASK FORCE On April 25, 2005, the Technical Specifications Section Staff met with the Task Force at the Excel Services Corporation offices in Rockville, Maryland. This meeting was scheduled as a follow-on meeting to the April 19, 2005, meeting where the Staff considered Task Force comments on operability and degraded or nonconforming conditions guidance (Manual Chapter 9900) topics.
A copy of the agenda (Enclosure 1) and a list of participants (Enclosure 3) is attached.
Additionally, a markup of the Task Force guidance incorporating agreements made at the April 19, meeting for redrafting Sections 1.0 through 5.0 is provided in (Enclosure 4).
During the meeting the Staff and the Task Force reviewed Operability Determinations (Section 5.0), Operations Based on Operability Determinations (Section 6.0), Corrective Action (Section 7.0), Appendix A, Surveillances, Appendix B, Maintenance, and Appendix C, Specific Operability Issues guidance and considered changes that used simpler more concise phrases to add clarity to the guidance. The Staff and the Task Force also agreed to the following actions:
- Definitions (Section 3.5, Functionality) - assess the benefit to be gained by adding the functionality concept to other discussions, for example in Section 7.0, Corrective Action and the Appendices.
- Reasonable Expectations (Section 5.1) - this is a defined term for use in Operability determinations that would be more logically located in the Section 3.0, Definitions.
- Operability Determinations (Section 5.0) - declaration of operability is by an SRO, craft appropriate guidance for location and confirmation of an operability declaration.
- Prompt Determination (Section 5.4.2) - prompt operability determinations follow immediate determinations. Clarify the intent for prompt reviews, i.e., when it is necessary and when it is not.
- Presumption of Operability ([old] Section 5.7) - reinstate the guidance which was removed as a Task Force comment following the February 15, 2005 meeting discussions.
- Operations Based on Operability Determinations (Section 6.0) - add new guidance to explain that operations in accordance with 10 CFR 50.54(x), 10 CFR 50.54(y) and beyond design basis events can be pre-approved.
- Compensatory Measures (Section 7.3) - strike the unnecessary citation that NEI 96-07 refers to GL 91-18, for guidance on the temporary use of manual actions in place of automatic actions to compensate for degraded or nonconforming conditions. Keep the citation of Appendix C.5 for guidance on the temporary use of manual actions.
Enclosure 1
- Missed Technical Specification Surveillance (Appendix A.3) - Task Force proposes to remove this section since it represents a digest of how the missed surveillance issue contained in GL 87-09 was incorporated into standard technical specifications and the fact that the current STS SR 3.0.3 contains all related discussions on a missed surveillance.
The Staff and Task Force meeting concluded before Appendix C was reviewed. The agenda for the meetings scheduled for May 10 through 13, 2005, is to develop a master markup of the guidance document with disposition of all Task Force comments.
AGENDA APRIL 25, 2005 PUBLIC MEETING ROCKVILLE, MD NEI OPERABILITY DETERMINATION PROCESS TASK FORCE 8:30 a.m. - 4:30 p.m.
I. Discuss High Priority Topic Followup in the Following Guidance Sections
- Operations Based on Operability Determinations (Section 6.0)
- Corrective Action (Section 7.0)
- Appendix A, Surveillances
- Appendix B, Maintenance
- Appendix C, Specific Operability Issues II. Discuss New Issues III. Identify Action Assignments for May 9 and 10, 2005 meeting Enclosure 2
ATTENDEE LIST APRIL 25, 2005 PUBLIC MEETING ROCKVILLE, MD NEI OPERABILITY DETERMINATION PROCESS TASK FORCE Name Affiliation Carl S. Schulten NRC\NRR\TSS\IROB\DIPM Nancy Salgado NRC\NRR\TSS\IROB\DIPM
- Laurie Lahti Nuclear Management Company laurie.lahti@nmcco.com
- Peter LeBlond Leblond & Associates, LLC LeBlond@prodigy.net
- C. Jeff Thomas Duke Energy - Mcguire cjthomas@duke-energy.com James Kilpatrick Constellation Energy - Calvert Cliffs james.c.kilpatrick@constellation.com
- Ron Gaston DTE Energy - Fermi gastonr@dteenergy.com Mike Schoppman NEI, mas@nei.org Brian Mann TSTF\EXCEL, brianm@excelservices.com Donald R. Hoffman TSTF\EXCEL, donaldh@excelservices.com Thomas Boyce NRC\NRR\TSS\IROB\DIPM
- Getachew Tesfaye Constellation, getachew.tesfaye@constellation.com
- Michael Matheson NPPD, mdmathe@nppd.com
- Harold Chernoff NRC/NRR/DLPM
- Bill Reckley NRC/NRR/DLPM
- Participated via conference telephone line Enclosure 3