NRC Final Exam Results Ltr. W/O Encl. Dtd 4/22/05
ML051270008
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/22/2005
From: Conte R
NRC/RGN-I/DRS/OSB
To: Wilson M
Dominion Nuclear Connecticut
Conte R
References
Download: ML051270008 (3)


Text

April 22, 2005 Mr. Michael J. Wilson Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Power Station, Units2 Rope Ferry Road, Route 156 Waterford, CT 06385

Dear Mr. Wilson:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on March 18, 2005, and the walkthrough (overall) and/or simulator operating tests administered March 21-24, 2005 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Nine individuals were administered the examination and eight passed. However, we will not be issuing licenses for seven of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written exam with a passing grade of 81 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Also, as explained in our correspondence dated March 17, 2005, we will not issue their licenses until you certify in writing that they have passed a Generic Fundamentals Examination (GFE). This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the license.

Mr. Michael J. Wilson Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

J. A. Price, Site Vice President

Mr. Michael J. Wilson Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME:

E:\Filenet\ML051270008.wpd ADAMS PACKAGE: ML042440181 SISP Review: RJC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler CJB JMDAntonio JMD RJConte RJC DATE 04/21/05 04/21/05 04/22/05 OFFICIAL RECORD COPY