ML051270004

From kanterella
Jump to navigation Jump to search
NRC Final Exam Results Ltr. W/O Encl. Dated 4/18/05 (Folder 1)
ML051270004
Person / Time
Site: Beaver Valley
Issue date: 04/18/2005
From: Conte R
NRC/RGN-I/DRS/OSB
To: Hynes C
FirstEnergy Nuclear Operating Co
Conte R
References
Download: ML051270004 (3)


Text

April 18, 2005 Mr. Christopher Hynes Supervisor, Operations Training FirstEnergy Nuclear Operating Company Beaver Valley Power Station Training Center State Route 3016 Shippingport, PA 15077

Dear Mr. Hynes:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on March 7, 2005, and the walkthrough (overall) and/or simulator operating tests administered February 24 to March 4, 2005 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Eleven individuals were administered the examination and ten passed. However, as explained in paragraph D.3.c of Examination Standard (ES) 501 in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, we will not issue two licenses for two of the applicants who passed until you certify in writing that they have acquired all of the training and experience for which they were previously granted a waiver. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Mr. Christopher Hynes Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.: 50-334/50-412 License Nos.: DPR-66/NPF-73

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary (Beaver Valley 1 and Beaver Valley 2)
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

L. W. Pearce, Site Vice President J. H. Lash, Director Site Operations/Plant Manager

Mr. Christopher Hynes Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME:

E:\Filenet\ML051270004.wpd ADAMS PACKAGES ML042440185; ML041330062 SISP Review: STB To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB RI/DRS/OS B

NAME CJBixler CJB SDennis SD STBarr STB RJConte RJC DATE 04/15/05 04/15/05 04/15/05 04/15/05 OFFICIAL RECORD COPY

Mr. Christopher Hynes