ML051250328

From kanterella
Jump to navigation Jump to search

Answer to NRC Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190)
ML051250328
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/25/2005
From: Sheppard J
South Texas
To: Dyer J
Office of Nuclear Reactor Regulation
References
EA-04-190, NOC-AE-05001872, TAC MC5346, TAC MC5347
Download: ML051250328 (3)


Text

Nuclear Operating Company N E V SouLth Thczs I'v/cc Ekdrlc Gcnem Sfaon

00. &2'289 JdVnrt89 7

t74a3.

April 25, 2005 NOC-AE-05001872 10 CFR 2.202 James E. Dyer Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 South Texas Project Units-1 & 2 Docket Nos. STN 50-498, STN 50-499 Answer to NRC Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190) TAC Nos. MC5346 and MC5347

Reference:

1.

Letter, J. E. Dyer to Holders of Licenses for Power Reactors, "Issuance of Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190)," 11/05/04 (AE-NOC-04001296)

2.

Letter, J. J. Sheppard to J. E. Dyer, "Request for Extension to Respond to the NRC Order Imposing Requirements for Protecting Certain Safeguards Information (EA-04-190)," 11/23/04 (NOC-AE-04001821)

3.

Letter, J. E. Dyer to J. J. Sheppard, "Request for Extension of Time to Reply to November 5, 2004, Order Imposing Requirements for Protecting Certain Safeguards Information," 04/11/05 (AE-NOC-04001361)

STP Nuclear Operating Company (STPNOC) has received the NRC Order Imposing Requirements for Protecting Certain Safeguards Information (Reference 1) and the subsequent extension granted to STPNOC (Reference 3). Pursuant to 10 CFR 2.202, STPNOC files this answer consenting to the Order and indicating its decision not to request a hearing.

There are no commitments in this letter.

If there are any questions regarding this letter, please contact Robyn Savage at (361) 972-7438 or me at (361) 972-8757.

J. J. Sheppard President & Chief Executive Officer STI I II174Sj

NOC-AE-05001872 Page 2 of 2 cc:

(paper copy)

(* electronic copy)

Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Director Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555 Assistant General Counsel for Materials Litigation and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189 A. H. Gutterman, Esquire

  • U. S. Nuclear Regulatory Commission Jack A. Fusco
  • Michael A. Reed
  • AEP Texas Central Company C. Kirksey
  • City of Austin Jon C. Wood
  • Cox Smith Matthews R. K. Temple
  • J. J. Nesrsta
  • E. Alarcon
  • City Public Service Secretary of the Commission
  • U. S. Nuclear Regulatory Commission Office of the General Counsel
  • U. S. Nuclear Regulatory Commission Jeffrey Cruz U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555

Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, Texas 77483 Return Postage Guaranteed Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001