ML051250186
| ML051250186 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/29/2005 |
| From: | Sands S NRC/NRR/DLPM/LPD3 |
| To: | Crane C Exelon Generation Co |
| Sands S, NRR/DLPM/415-3154 | |
| Shared Package | |
| ML050970040 | List: |
| References | |
| TAC MC4942, TAC MC4943 | |
| Download: ML051250186 (2) | |
Text
Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.
5.6.1 5.6.2 (Deleted)
Annual Radioloaical Environmental Operatina Report
NOTE-------------------------------
A single submittal may be made for a multiple unit station.
The submittal should combine sections common to-all units at the station.
The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year.
The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring program for the reporting period.
The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (continued)
LaSalle 1 and 2 5.6-1I Amendment No. 173,159
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.2 Annual Radiological Environmental Operating Report (continued)
(ODCM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.
Radioactive Effluent Release Report 5.6.3
NOTE------------
A single submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station.
The Radioactive Effluent Release Report covering the operation of the unit shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit.
The material provided shall be consistent with the objectives outlined in the ODCM and the Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.
5.6.4 5.6.5 (Deleted)
CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1. The APLHGR for Specification 3.2.1.
- 2. The MCPR for Specification 3.2.2.
- 3. The LHGR for Specification 3.2.3.
(continued)
LaSalle 1 and 2 5.6 -2 Amendment No. 173,159