ML051240340
| ML051240340 | |
| Person / Time | |
|---|---|
| Site: | Millstone (NPF-049) |
| Issue date: | 05/04/2005 |
| From: | Paul Krohn NRC/RGN-I/DRP/PB6 |
| To: | |
| Krohn P, RI/DRP/PB6/610-337-5120 | |
| Shared Package | |
| ML051240334 | List: |
| References | |
| 05-025 | |
| Download: ML051240340 (4) | |
Text
No.05-025 U.S. NUCLEAR REGULATORY COMMISSION REGION I ANNOUNCEMENT OF PUBLIC MEETING May 4, 2005
Subject:
NRC Public Presentation to the Nuclear Energy Advisory Council (NEAC)
Concerning the Millstone Unit 3 Event of April 17, 2005 Date/Time:
May 18, 2005, beginning at 6:00 p.m.
Location:
Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385
Purpose:
At the invitation of the NEAC, the NRC will discuss the results of the recent Special Inspection Team which evaluated the circumstances associated with the Millstone Unit 3 event of April 17, 2005.
Attendees:
NRC:
B. Holian, Director (Acting), Division of Reactor Projects, Region I P. Krohn, Chief, Project Branch 6, Division of Reactor Projects M. Sykes, Manager, Special Inspection Team G. Barber, Leader, Special Inspection Team S. Schneider, Senior Resident Inspector, Millstone S. Kennedy, Resident Inspector, Millstone Other Special Inspection Team Members NEAC:
E. Woollacott, Co-Chair J. Markowicz, Co-Chair Other NEAC members Public Participation:
The public is invited to observe the NRC presentation to NEAC. Before the meeting is adjourned the public will have an opportunity to communicate with the NRC and NEAC regarding Dominion Nuclear Connecticuts performance during the event and the results of the Special Inspection Team.
The NRCs most recent assessment of Millstone is documented in a letter dated March 2, 2005, and can be found in ADAMS with an accession number of ML050610512. This meeting announcement can be located in ADAMS with an accession number of ML051240340. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRCs Annual Assessment process and the safety performance of Millstone Station can be found on the NRC Web Site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
2 Meeting
Contact:
Paul Krohn, Chief - Projects Branch 6 (610) 337-5120 E-mail: pgk1@nrc.gov Please feel free to contact me in advance if there are any particular topics of interest related to the events of April 17, 2005, that you would like to discuss following the meeting.
Approved by: _____/RA/_________
Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects
3 Distribution:
D. A. Christian, Senior Vice President and Chief Nuclear Officer J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford R. Rubinstein, Waterford Library J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)
4 Distribution w/encl: (VIA E-MAIL)
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, RA J. Wiggins, DRA P. Krohn, DRP G. Barber, DRP G. Sykes, RI S. Lee, RI OEDO D. Roberts, NRR V. Nerses, NRR G. Wunder, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA T. Madden, OCA D. Screnci, PAO N. Sheehan, PAO R. Bores, SLO G. Matakas, ORA PMNS Region I Docket Room (with concurrences)
ML051240340 Document Name: E:\\Filenet\\ML051240340.wpd SISP Review Complete:___PGK_____ (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/ORA RI/DRS RI/DRS NAME NSheehan/NAS MSykes/PGK for PKrohn/PGK DATE 05/04/05 05/04/05 05/04/05 OFFICIAL RECORD COPY