ML051190286
Letter Sequence Other | |
---|---|
MONTHYEARML0505404192005-04-13013 April 2005
[Table View]Issuance of License Amendments 116 and 116 to Extend Surveillance Frequency for Containment Purge, Hydrogen Purge, and Containment Pressure Relief Valves Project stage: Approval ML0511902862005-04-13013 April 2005 Tech Spec Page for Amendments 116 and 116 to Extend Surveillance Frequency for Containment Purge, Hydrogen Purge, and Containment Pressure Relief Valves Project stage: Other 2005-04-13 |
ML051190286 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 04/13/2005 |
From: | NRC/NRR/DLPM |
To: | |
Thadani M, NRR/DLPM, 415-1476 | |
Shared Package | |
ML051180530 | List: |
References | |
TAC MC0911, TAC MC0912 | |
Download: ML051190286 (1) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Technical Specifications
MONTHYEARML24023A2962024-02-0909 February 2024
[Table view]Issuance of Amendment Nos. 186 and 186 Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200035, Second Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-01-25025 January 2022 Second Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML20346A0192021-02-0101 February 2021 Issuance of Amendment Nos. 177 and 177 Regarding Revision to Technical Specifications 3.8.1, AC Sources - Operating ML20168A9242020-11-16016 November 2020 Issuance of Amendment Nos. 176 and 176 Regarding Revision to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation ML20223A3492020-08-31031 August 2020 Issuance of Amendment Nos. 175 and 175 Regarding One-Time Revision to Technical Specification 3.7.19, Safety Chilled Water ML20167A3182020-07-0606 July 2020 Issuance of Amendment Nos. 174 and 174 Regarding Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML20108E8782020-04-17017 April 2020 Issuance of Amendment Nos. 173 and 173 Revision to TS 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program (Exigent Circumstances) ML18267A3842018-10-25025 October 2018 Issuance of Amendment Nos. 170 and 170 Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B (Exigent Circumstances) CP-201800659, (Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B2018-09-20020 September 2018 (Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B CP-201600683, Supplement to License Amendment Request 16-001 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5...2016-06-30030 June 2016 Supplement to License Amendment Request 16-001 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5... ML16096A2642016-05-0606 May 2016 Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML15309A0732015-12-30030 December 2015 Issuance of Amendment Nos. 165 and 165, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, to Increase ILRT Test Interval from 10 to 15 Years and Type C Tests from 60 to 75 Mos ML15008A1332015-02-24024 February 2015 Issuance of Amendment Nos. 164 and 164, Revise Technical Specification 3.8.1 for a 14-Day Completion Time for Offsite Circuits ML14160A0352014-07-0101 July 2014 Redacted, Issuance of Amendment No. 162, Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals ML14042A2232014-02-27027 February 2014 Issuance of Amendment Nos. 161 and 161, Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Consolidated Line Item Improvement Process (TAC MF2651-MF2652) ML14052A2612014-02-19019 February 2014 Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using.. CP-201300738, License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item..2013-07-10010 July 2013 License Amendment Request 13-002, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item.. CP-201300257, License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals.2013-03-28028 March 2013 License Amendment Request (LAR) 13-01, Revision to Technical Specifications 3.7.16, Fuel Storage Pool Boron Concentration, 3.7.17, Spent Fuel Assembly Storage, 4.3, Fuel Storage, and 5.5 Programs & Manuals. CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent ....2012-03-28028 March 2012 (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .... CP-201101663, License Amendment Request (LAR)11-003 for Adopting of TSTF-491, Rev. 2, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Tech Specs Using Consolidated Line Item Improvement Process.2011-12-13013 December 2011 License Amendment Request (LAR)11-003 for Adopting of TSTF-491, Rev. 2, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Tech Specs Using Consolidated Line Item Improvement Process. CP-201101038, License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled2011-08-0101 August 2011 License Amendment Request (LAR) 11-001, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ML1011703672010-02-15015 February 2010 Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2 CP-201000212, Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 22010-02-15015 February 2010 Technical Specifications Bases for Comanche Peak Steam Electric Station, Units 1 and 2 CP-201000144, Revision to License Amendment Request 09-001, Administrative Revision to Operating Licenses and Technical Specifications2010-02-0101 February 2010 Revision to License Amendment Request 09-001, Administrative Revision to Operating Licenses and Technical Specifications CP-200901569, License Amendment Request (LAR) 09-010, for Approval of the Cyber Security Plan2009-11-19019 November 2009 License Amendment Request (LAR) 09-010, for Approval of the Cyber Security Plan ML0927400762009-10-0909 October 2009 Issuance of Amendment Nos. 149 and 149, Modify Technical Specifications to Establish Alternate Repair Criteria (ARC) and Include Reporting Requirements Specific to ARC for Steam Generator Program CP-200901308, Revision to License Amendment Request 09-007 Model D5 Steam Generator Alternate Repair Criteria2009-09-14014 September 2009 Revision to License Amendment Request 09-007 Model D5 Steam Generator Alternate Repair Criteria CP-200901042, Response to Request for Additional Information Regarding License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria2009-08-20020 August 2009 Response to Request for Additional Information Regarding License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria CP-200900383, License Amendment Request (LAR) 09-006, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-04-0101 April 2009 License Amendment Request (LAR) 09-006, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. CP-200900283, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request2009-02-17017 February 2009 Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request ML0818400022008-09-12012 September 2008 License and Technical Specifications Pages, Amendment Nos. 147 and 147, Revise Technical Specification 3.6.7, Spray Additive System to Comply with GL-2004-02 ML0815101752008-06-27027 June 2008 License, Appendix B, and Technical Specification Pages, Amendment Nos. 146 and 146, Stretch Power Uprate, Revision to TS 1.0, Use and Application, to Revise Rated Thermal Power from 3458 to 3612 Mwt ML0805800052008-04-0303 April 2008 Tech Spec Pages for Amendment Nos. 145 and 145 Revise TSs 3.1.4, 3.4.10, and 3.7.1 to Reflect Cycle-Specific Safety Analysis Assumptions Re Adoption of Westinghouse Methodologies ML0805100832008-04-0202 April 2008 License and Technical Specifications, Amendment 144 and 144, Changes to TS to Allow Use of Westinghouse-developed/NRC-approved Analytical Methods Used to Establish COLs CP-200800411, Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to Review Associated with Large and Small Break LOCA Analyses2008-03-13013 March 2008 Supplement to License Amendment Request (LAR) 07-003 Response to Request for Additional Information Related to Review Associated with Large and Small Break LOCA Analyses CPSES-200701076, Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt2007-08-28028 August 2007 Revision to the Operating License and Technical Specifications 1.0, Use and Application and 3.7.17, Spent Fuel Assembly Storage to Revise Rated Thermal Power from 3458 Mwt to 3612 Mwt CPSES-200701323, License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System..2007-08-16016 August 2007 License Amendment Request 07-006, Revision to Technical Specification 3.1.4, Rod Group Alignment Limits, Table 3.3.1-1, Reactor Trip System Instrumentation, Table 3.3.2-1, Engineered Safety Feature Actuation System.. ML0708201932007-04-27027 April 2007 Technical Specifications, Issuance of Amendment Nos. 138 and 138 Revision to Technical Specification 3.8.1, AC Sources - Operating (TAC MD0932 & MD0933) ML0704304542007-03-29029 March 2007 Technical Specifications, Issuance of Amendment Nos. 137 and 137 Reactor Coolant System Specific Activity ML0707700102007-03-26026 March 2007 Technical Specifications, Issuance of Amendment Nos. 135 and 135 Revise Listing of LOCA and Non-LOCA Methodologies ML0707300432007-03-26026 March 2007 Technical Specification, Modify TS Requirements Related to Control Room Envelope Habitability in TS 3.7.10, Control Room Emergency Filtration/Pressurization System (Crefs), and TS Section 5.5, Administrative Controls.... ML0704403712007-02-26026 February 2007 Technical Specifications, Issuance of Amendment Nos. 133 & 133 Revision to TS 3.3.1.2 and 3.3.1.3, Reactor Trip System Instrumentation (TAC Nos. MC9492 & MC9493) ML0703104902007-02-20020 February 2007 Technical Specifications, Issuance of Amendment Nos. 130 & 130 New Methods & Assumptions for Radiological Consequences Calculations (TAC Nos. MC8163 & MC8164) ML0703500472007-02-20020 February 2007 Technical Specifications, Issuance of Amendment Nos. 131 & 131 Technical Specification Changes Related to Unit 1 Steam Generator Replacement Project (TAC Nos. MD0187 & MD0188) CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators2007-01-18018 January 2007 License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators ML0628401022006-10-0505 October 2006 Technical Specification, Revisions to TS 3.3.2, ESFAS Instrumentation; and TS 3.5.2, ECCS - Operating ML0625801172006-09-12012 September 2006 Technical Specifications, Issuance of Amendments Steam Generator Tube Surveillance Program, MC9498 and MC9499 2024-02-09 |
Text
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.3.6 Notused SR 3.6.3.7 --------------------NOTE----------
This surveillance is not required when the penetration flow path is isolated by a leak tested blank flange.
Perform leakage rate testing for containment purge, 18 months hydrogen purge and containment pressure relief valves with resilient seals.
SR 3.6.3.8 Verify each automatic containment isolation valve that is 18 months not locked, sealed or otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.
SR 3.6.3.9 Not used.
SR 3.6.3.10 Not used.
SR 3.6.3.11 Notused.
(continued)
COMANCHE PEAK - UNITS I AND 2 3.6-14 Amendment No. &4 11