ML051190286
Jump to navigation
Jump to search
| ML051190286 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/13/2005 |
| From: | NRC/NRR/DLPM |
| To: | |
| Thadani M, NRR/DLPM, 415-1476 | |
| Shared Package | |
| ML051180530 | List: |
| References | |
| TAC MC0911, TAC MC0912 | |
| Download: ML051190286 (1) | |
Text
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.3.6 Notused SR 3.6.3.7
NOTE----------
This surveillance is not required when the penetration flow path is isolated by a leak tested blank flange.
Perform leakage rate testing for containment purge, 18 months hydrogen purge and containment pressure relief valves with resilient seals.
SR 3.6.3.8 Verify each automatic containment isolation valve that is 18 months not locked, sealed or otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.
SR 3.6.3.9 Not used.
SR 3.6.3.10 Not used.
SR 3.6.3.11 Notused.
(continued)
COMANCHE PEAK - UNITS I AND 2 3.6-14 Amendment No. &4 11