April 27, 2005 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT
Dear Mr. Stall:
In a telephone conversation on April 20, 2005, Mr. Ronald F. Aiello, Senior Operations Examiner, and Mr. Ed Roberts, Continuing Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the St. Lucie Nuclear Plant.
The inspection is planned for the week of July 18, 2005, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination.
In accordance with 10 CFR 55.59, the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in the enclosure, in order to support the NRC's inspection program needs. Mr. Roberts has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's
FP&L 2
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's Web public Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Ronald F. Aiello at (404) 562-4641 or me at (404) 562-4647.
Sincerely,
/RA/
James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
Materials Request List cc w/encl: (See next page)
FP&L 3
cc w/encl:
William Jefferson, Jr.
Site Vice President St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail Distribution G. L. Johnston Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution David Moore, Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Lisa Edwards Training Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957
OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE
/RA/
/RA/
/RA/
NAME RAiello:pmd JMoorman JMunday DATE 04/ 26 /05 04/ 27 /05 04/27/05 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
2 The items listed below were requested per telephone conversation on April 20, 2005, to support the upcoming Licensed Operator Requalification Inspection (Attachment 71111.11) in July 2005 at the St. Lucie Nuclear Plant. Items in paragraph "A" are to be sent prior to the inspection.
They must be received in our office by July 5, 2005. Please have the items listed in paragraph "B" ready for our review upon arrival on July 18, 2005.
A.
In-office inspection material:
1.
Exam results since last requalification inspection, copies of exams that had pass/failure rates significantly outside the average.
2.
A copy of the last biennial requalification written examination (2RO/SRO exams) and all biennial re-takes.
3.
List of personnel scheduled for requalification testing the week of 07/18/05.
4.
Copies of simulator scenarios for this exam (when available).
5.
Program evaluation for the previous 2 years training cycle.
6.
A list of all personnel that reactivated their licenses since the last requalification inspection.
7.
Simulator:
List of all open simulator discrepancy reports (DRs).
Copy of the simulator management and configuration procedures.
List of all closed simulator discrepancy reports for last 12 months.
List of simulator performance tests.
B.
On-site inspection material:
3.
Condition Reports and LERs resulting from Operations Department human performance errors since the last requalification inspection.
2.
All training feedback forms since the last requalification inspection.
3.
All remedial training packages since the last requalification inspection.
4.
Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requalification inspection.
5.
Copies of the reference list for all administrative procedures which direct the training
3 process, including development of training and test materials, remedial training, modifications, plant and industry experience.
6.
Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requalification inspection.
7.
All medical exam records with a copy of the individuals license attached (This can be pre-staged in medical).
- 8.
Simulator JPMs and in-plant JPMs that have been administered for this requalification exam.
9.
Copy of an organizational chart for the training department including the simulator group.
10.
Complete list of all licensed individuals complete with license restrictions.
11.
Security procedures for the simulator.