YANKEE ATOMIC ELECTRIC COMPANY Telephone (413) 424-5261
.NKEE 49 Yankee Road, Rowe, Massachusetts 01367 April 14, 2005 BYR 2005-035 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
References:
Subject:
- 1. License No. DPR-3 (Docket No. 50-29)
- 2. YAEC Letter to USNRC, "Hydrogeologic Report of 2003 Supplemental Investigation" (YA-REPT-00-004-04), dated March 16, 2004, BYR 2004-023.
- 3. YAEC Letter to USNRC, "Interim Groundwater Monitoring Report -
September 2004" (YA-REPT-00-013-04), dated September 27, 2004, BYR 2004-107.
Report of Continuing Hydrogeologic Investigations in 2004 (YA-REPT-00-010-05)
Yankee Atomic Electric Company (YAEC) herewith submits the (enclosed) subject report which discusses the results of ground water investigations conducted during 2004 at the Yankee Nuclear Power Station (YNPS). This investigative phase follows that of the previous year which was reported in Reference 2, and incorporates information earlier reported in Reference 3.
Hydrogeologic investigations addressed in the report encompassed the collection and analysis of four quarters of ground water samples, installation of ten additional monitoring wells in three locations (to further characterize the stratigraphy and hydrogeology at the site), and permanent abandonment of twenty-two older wells. Eight additional wells were temporarily abandoned as a protective measure due to their location in the vicinity of ongoing demolition activities. Twenty data-logging pressure transducers were installed in selected wells to continuously monitor ground water levels, and a data-logging rain gauge was installed to record precipitation.
The report concludes with recommendations to: a) install multi-level clusters of monitoring wells at two locations, b) continue with ground water sampling with the addition of any new wells that may be drilled, c) postpone quarterly sampling until the fourth quarter of 2005 to allow for completion of demolition activities and site restoration, d) continue monitoring of ground water levels and precipitation with data-logging pressure transducers and a data-logging rain gauge, and e) consider discontinuing with monitoring for gamma-emitting and hard-to-detect radionuclides in selected wells.
A OmSbSs
U.S. Nuclear Regulatory Commission BYR 2005-035, Page 2/2 Should you have any questions regarding information provided in the enclosed report, please contact Mr. Greg Babineau, Radiation Protection Manager, at (413) 424-2202.
Sincerely, YANKEE ATOMIC ELECTRIC COMPANY ack D. Rollins Regulatory Affairs Manager Enclosure cc:
J. Hickman, NRC, Project Manager, NMSS S. Collins, NRC, Region I Administrator J. Kottan, Inspector, NRC Region I (w/o enclosure)
M. Whalen, MA DPH D. Howland, MA DEP M. Rosenstein, EPA, Region 1 W. Perlman, Executive Committee Chair, FRCOG T. W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Director of Planning & Development, FRCOG D. Katz, CAN J. Block, Esq.