ML051110274

From kanterella
Jump to navigation Jump to search
E-mail Transmitting NRC Comments on NEI 04-02 and Draft NFPA 805 Reg Guide to NEI
ML051110274
Person / Time
Issue date: 04/20/2005
From: Radlinski R
Plant Systems Branch
To: Marion A
Nuclear Energy Institute
rfr1
References
Download: ML051110274 (2)


Text

From: Robert Radlinski To: Alex MARION Date: 4/20/05 4:08PM

Subject:

Preliminary Comments on NEI 04-02 Rev G3 and Draft Reg Guide

Alex, Per our discussion today, attached are our preliminary comments on NEI's working draft of NEI 04-02 as well as the current version of the working draft of the NFPA 805 reg guide. I am forwarding these documents to you to facilitate the completion of the final versions of both documents and to assist in coordinating the content so that unnecessary duplication does not occur.

Note that the comments on NEI 04-02 are, at this stage, the personal opinions of the reviewers and not necessarily the final NRC position. Likewise, the text of the draft final reg guide is preliminary and has not been reviewed or approved by NRC management. Please use the documents accordingly and do not distribute them to anyone who is not involved in the development of NEI 04-02.

The transmittal of these documents to NEI was discussed with and approved by Sunil Weerakkody and Chandu Patel. As I noted in our phone call, both documents will be entered into the NRC PDR (for record purposes only) as they appear in the attachments.

I will arrange for a telecon early next week to discuss any clarifications you may need on our comments.

Bob Radlinski, PE Fire Protection Engineer NRR/DSSA/SPLB 301-415-3174 OWFN 11H14 CC: Chandu Patel; Paul Lain; Sunil Weerakkody Mail Envelope Properties (4266B6D5.6F4 : 17 : 17288)

Subject:

Preliminary Comments on NEI 04-02 Rev G3 and Draft Reg Guide Creation Date: Wednesday, April 20, 2005 4:08:53 PM From: Robert Radlinski Created By: RFR1@nrc.gov Recipients nei.org am (Alex MARION) nrc.gov owf2_po.OWFN_DO SDW1 CC (Sunil Weerakkody) nrc.gov owf4_po.OWFN_DO

CPP CC (Chandu Patel)

PWL CC (Paul Lain)

Post Office Route nei.org owf2_po.OWFN_DO nrc.gov owf4_po.OWFN_DO nrc.gov Files Size Date & Time MESSAGE 2096 Wednesday, April 20, 2005 4:08:53 PM NEI 04-02 Preliminary Draft Final 01.DOC 2731520 Wednesday, April 20, 2005 3:25:52 PM NFPA 805 Reg Guide-Draft Final.wpd 225368 Wednesday, April 20, 2005 3:49:22 PM Options Expiration Date: None Priority: High Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard