FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perry Ohio 44081 Richard Anderson Vice President-Nuclear 440-280-5579 Fax: 440-280-8029 April 12, 2005 PY-CEIINRR-2877L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the March 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector me 2114
OPERATING DATA REPORT UNIT:
Perry DATE:
417O5 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period March 2005 Utility
Contact:
T. Phelos Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 8.
9.
10.
11.
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 0.0 0.0 0.0 0.0 Yr-to-Date 653.2 624.4 0.0 670.633.0 Cumulative 121,322.6 118.515.5 0.0 13fA6 026 390 0
. vu.vLv.vvv.w Page 1
UNIT SHUTDOWNS REPORT MONTH - MARCH 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 4/7/05 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I
Hours 2
3 05-02 2/22105 S
912.0 C
4 The plant entered refuel outage #10 on February 22, 2005 @0001
SUMMARY
- The Perry Nuclear Power plant commenced refuel outage #10 on 2/22/05 and continued to perform refuel outage activities through the month of March.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2