Harold Chemnoff - Re: Fwd: Point Beach Page 1 1 Harold Chemoff - Re: Fwd: Point Beach Paae 1 From:
Joseph Petrosino P To:
d -Ohernoff, Harold; Heller, James; Hills, David; Holmberg, Melvin; Louden, Patrick Date:
Thu, May 27, 2004 6:55 PM
Subject:
Re: Fwd: Point Beach The Cl is making assertions that the fracture analysis numbers" are arbitrary and "suspiciously small" to J
make the relief envelope the 1.3 operational cycle..
Should the start-up be delayed until the assertions can be discussed in more detail??
>>> James Heller 05/27/04 06:48PM >>>
I
/Joe I read the attached to the DRP branch chief. He stated that this applies to the relief request that NRR verbally granted today and will be provided in writing to the licensee.
The plant is currently shutdown with criticality scheduled for Wednesday. this means the heatup and pressurization to operating temperature and pressure will most likely occur this weekend. Power operation will follow after low power physic testing.
Jim CC:
- '~('