MONTHYEARML24262A2232024-09-18018 September 2024 Part Event Notification 57330. Part 21 - Control Relay Defect ML24256A1402024-09-0505 September 2024 Preliminary Data Needs and Agenda to Support the Supplemental Environmental Audit for Point Beach, Units 1 and 2 - File Copy ML24226A6842024-08-13013 August 2024 NRR E-mail Capture - Point Beach, Units 1 and 2 - Acceptance of License Amendment Request to Adopt TSTF-577 ML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24199A2142024-07-17017 July 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Modify Containment Average Air Temperature Requirements ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24108A1022024-04-17017 April 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Revision to Reactor Vessel Surveillance ML24053A0112024-02-21021 February 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Request CISI-03-01 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements 3 ML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22291A3692022-10-18018 October 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System ML22249A0052022-09-0202 September 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 ML22229A1052022-08-17017 August 2022 Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment ML22229A1022022-07-18018 July 2022 Original Request - Questions Regarding Point Beach Nuclear Power Plant ML22196A0062022-07-15015 July 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b ML22094A0802022-04-0404 April 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-366 ML22006A1952022-01-0606 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A2012022-01-0606 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22006A2762022-01-0606 January 2022 SLR - FW: Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML22004A1672022-01-0404 January 2022 SLR - Ref: Point Beach ML22004A3212022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A0012022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A3202022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A1942022-01-0404 January 2022 SLR - (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, Docke ML22004A3192022-01-0404 January 2022 SLR - FW: Point Beach ML22004A3182022-01-0404 January 2022 SLR - FW: EPA Comment Letter - Point Beach SEIS ML22004A1732022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A1992022-01-0303 January 2022 SLR - (External_Sender) Comments of Michael J Keegan on Dseis Point Beach ML22004A3172021-12-21021 December 2021 SLR - (External_Sender) EPA Comment Letter - Point Beach SEIS ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML22006A2752021-12-0202 December 2021 SLR - (External_Sender) Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML21341A6102021-11-16016 November 2021 SLRA Safety RAI Set 12 Final Email ML21314A4212021-11-10010 November 2021 Fws to NRC, Concurrence with ESA Determination for Point Beach Subsequent License Renewal ML21307A1522021-11-0909 November 2021 NRC to Fws, Request for Concurrence with Endangered Species Act Determinations for Point Beach Subsequent License Renewal ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21279A1202021-10-0505 October 2021 Email: Wi Shpo Review Point Beach Nuclear Plant SLR ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21273A0232021-09-0202 September 2021 SLRA Safety RAI Set 9 Final Email ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2462021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 2024-09-05
[Table view] |
Text
. . .. . - 7 . .- - -- . . I , . 'I Harod Chernoff -^ Fwd:
. A_ Point Beach
. . ... AFW Recirc Valve Pne
__,.................................... tiCapacity _J~agej1 From: Patrick Louden b To:
Date:
Subject:
Harold Chernoff ItAvr-'
Tue, Jun 29, 2004 9:13 AM Fwd: Point Beach AFW Recirc Valve Pneumatic Capacity
/1"
/-/
I Haroild Cherno'ff - Point Beach AFW Recirc Valve Pneumatic Capacity Page I I Harold Chernoff - Point Beach AFW Recirc Valve Pneumatic Capacity Page 1 From: Paul Krohn \ Ad To: Burgess, Sonia; Louden, Patrick 2 I I l Date: Mon, Jun 28, 2004 6:55 PM
Subject:
Point Beach AFW Recirc Valve Pneumatic Capacity Pat and Sonia, The Site Director of Operations (McCarthy) brought to my attention an issue that a PB engineer had discovered during preparation of a revision to a calculation for the nitrogen backup system for the MDAFWPs. It was discovered that eh AFW recirculation AOVs are not set up in conformance with the calculation of record. This issue applies to both the TDAFWP and the MDAFWP.
Both calculations require that the AOVs be set such that there is a 1/4" gap between the actuator frame and the diaphragm housing. this sets the dead volume of the actuator, a value that is an input to the calculation which determined the required capacity of the accumulators to provide 10 strokes/hour of the recirculation valves for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
Actual walkdown of the installed configuration in the field has revealed gaps ranging between 7/8" to 1 and 7/8."
Using the worst case stoke volumes (600 cubic inches of air) the following results are obtained;
- 1) the TDAFWP would required a 211 gallon accumulator to provide 10 strokes/hour for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The actual accumulator has a volume of 150 gallons.
- 2) the MDAFWP would require nitrogen bottles to be changed out at 1927 psig. The current log spec requires change out at 1850 psig.
I have talked to the shift manager and the AFW system has been called operable-but-nonconforming since the pneumatic backup system can still function but not to the number of valve stokes assumed in the calculation. Operations has required engineering to perform a 24-hour operability determination. This operability determination is due tomorrow at 3:00 pm.
I will continue to collect information on this matter. The SSDI team Lead (Sonia Burgess) has also been made aware of this issue. For the moment, it appears that the original capacity calculation for the accumulators and backup bottles had an erroneous design input (1/4" gap) that did not match the as-built configuration in the field.
I don't believe this is an immediate operability concern but do think it reflects on the rigor of the design modification and work package that installed the backup air supply to the recirculation AOVs and past licensee AFW corrective actions. More to follow.
Paul Krohn, SRI Point Beach CC: Cameron, Jamnes; Kunowski, Michael; Morris, R. Michael; Stone, Ann Marie
lHarqid Che-moff - U2 TDAFWP RecircV g;Pg1-I
lHarold Cher~noff - Gap Dea0pg - ag-e- 1 Harold Cenf PB U2 Air-Accjpg - Page 1
[IHarold Chernoff - B MDAFWP Reciro2 Vlv.jpg Page 1 Fewmove s