Notice of Public EOC Meeting with South Texas Project Nuclear Operating Company Regarding Performance Results of the South Texas Project Electric Generating Station for the Period of January 1 Through December 31, 2004ML051040554 |
Person / Time |
---|
Site: |
South Texas ![STP Nuclear Operating Company icon.png](/w/images/9/9c/STP_Nuclear_Operating_Company_icon.png) |
---|
Issue date: |
04/14/2005 |
---|
From: |
Johnson W NRC Region 4 |
---|
To: |
|
---|
References |
---|
Download: ML051040554 (4) |
|
|
---|
Category:Meeting Notice
MONTHYEARPMNS20230826, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 22023-07-11011 July 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 2 ML22229A4872022-08-17017 August 2022 Presubmittal Teleconference with STP Nuclear Operating Company Regarding Proposed License Amendment Request to Revise the Dose Consequence Analysis for MSLB and LRA Events for South Texas Project, Units 1 and 2 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220262, Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation2022-03-21021 March 2022 Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation (Isf PMNS20220173, Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements2022-02-25025 February 2022 Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements ML21196A4132021-07-15015 July 2021 Teleconference and Webinar with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML16113A1992016-04-22022 April 2016 Public Meeting - Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML15271A3042015-09-28028 September 2015 Public Phone Call Meeting Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 ML14008A2252014-01-0808 January 2014 Notice of Category I Public Meeting Concurrence by NRO, to Discuss Resolution of Open Items and Outstanding Requests for Additional Information (RAI) Responses to Support the Safety Review of the South Texas Project (STP) Units 3... ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 ML13119A0802013-04-30030 April 2013 Notice Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13101A3142013-04-12012 April 2013 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13046A0652013-02-22022 February 2013 3/5/13 Notice of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML12331A2922012-11-27027 November 2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML12321A1222012-11-20020 November 2012 12/3/12 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML12243A4042012-09-25025 September 2012 Notice of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach ML12227A5902012-08-23023 August 2012 9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni ML12226A4552012-08-15015 August 2012 Forthcoming Meeting with STP Nuclear Operating Company Regarding License Renewal for the South Texas Project, Units 1 and 2 ML12195A3632012-07-13013 July 2012 08/1/2012 Notice of Open House Meeting with the Public to Discuss Results of South Texas Project License Renewal Inspection ML12146A0202012-05-31031 May 2012 Notice of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML1207400312012-03-15015 March 2012 3/29/12 Notice of Meeting Viaconference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for Units 1 and 2 ML1203400432012-02-0303 February 2012 Notice of Forthcoming Meeting Via Conference Call with STP Nuclear Operating Company ML1203003642012-02-0202 February 2012 3/8/12 Forthcoming Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, U ML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company ML1132104112011-11-0101 November 2011 Revised Notice of by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1127900992011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 an ML1127901512011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & ML1125101482011-09-15015 September 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Co. to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1121301822011-08-0202 August 2011 Meeting Notice with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 (TAC ME5358-ME5359 ML1118615292011-07-12012 July 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1116402112011-06-24024 June 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1114706522011-05-16016 May 2011 Correction 06/02/2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 ML1113302442011-05-16016 May 2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1111804402011-04-27027 April 2011 Notice of Public Meeting with South Texas Project Nuclear Operating Company Present and Discuss Performance Results for the Period of January 1 Through December 31, 2010 ML1104105052011-02-10010 February 2011 2/22/11 Notice of Forthcoming Public Meeting with STP Nuclear Operating Co., Units 1 & 2, to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Option Approach ML1035106972011-01-25025 January 2011 3/02/11 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for South Texas Project, Units 1 and 2 License Renewal Application Review ML1023004452010-08-27027 August 2010 Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 ML1008101622010-03-22022 March 2010 Design Acceptance Criteria (DAC) Working Group Category 2 Public Meeting ML0925703902009-09-17017 September 2009 Notice of Meeting with STP Nuclear Operating Company to Discuss Experience with Implementation of Risk Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0913801712009-05-18018 May 2009 Notice of Annual Assessment Meeting with South Texas Project Nuclear Operating Co. to Discuss Performance Results ML0811900722008-04-28028 April 2008 Notice of Meeting with South Texas Project Regarding End of Cycle Assessment ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co ML0724904812007-09-11011 September 2007 Notice of Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants ML0715701282007-06-0606 June 2007 Notice of Meeting with South Texas Project to Discuss the Review Process for South Texas Project Nuclear Operating Company'S Combined License (COL) Application for the South Texas Project Site 2023-07-11
[Table view] |
Text
April 14, 2005
SUBJECT:
MEETING WITH SOUTH TEXAS PROJECT NUCLEAR OPERATING COMPANY FACILITY: South Texas Project Electric Generating Station DOCKETS: 50-498, 50-499 DATE AND TIME: May 3, 2005 6 p.m.
LOCATION: Bay City Civic Center 201 Seventh Street Bay City, TX 77404-0768 PURPOSE: This is the end-of-cycle public meeting between the NRC and South Texas Project Nuclear Operating Company to present and discuss performance results of the South Texas Project Electric Generating Station for the period of January 1 through December 31, 2004. The annual assessment letter for South Texas Project can be found at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stp_2004q4.pdf CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
PARTICIPANTS: NRC W. Johnson, Chief, Project Branch A, Division of Reactor Projects (DRP)
J. Taylor, Acting Senior Resident Inspector, DRP G. Guerra, Resident Inspector, DRP UTILITY J. Sheppard, President and Chief Executive Officer G. Parkey, Vice President, Generation T. Jordan, Vice President, Engineering E. Halpin, Vice President, Oversight MEETING CONTACT: William D. Johnson, NRC, RIV 817/860-8148 wdj@nrc.gov
STP Nuclear Operating Company cc: Julie Parsley, Commissioner James J. Sheppard, President and Public Utility Commission Chief Executive Officer William B. Travis Bldg.
STP Nuclear Operating Company P.O. Box 13326 P.O. Box 289 Austin, TX 78711-3326 Wadsworth, TX 77483 William "Dub" Taylor The Honorable Richard Knapik State Energy Conservation Office Mayor, City of Bay City P.O. Box 13528 City Hall Austin, TX 78711 1901 Fifth Street Bay City, TX 77414 The Honorable Greg Westmoreland Matagorda County Judge The Honorable John Connor 1700 7th Street Mayor, City of Palacios Bay City, TX 77414-5094 P.O. Box 845 Palacios City Hall E. D. Halpin Palacios, TX 77465 Vice President, Oversight STP Nuclear Operating Company James Mitchell, Sheriff P.O. Box 289 Matagorda County Wadsworth, TX 77483 2323 Avenue E Bay City, TX 77414 S. M. Head, Manager, Licensing STP Nuclear Operating Company Federal Emergency Management Agency P.O. Box 289, Mail Code: N5014 ATTN: Gary Jones, Regional Director Wadsworth, TX 77483 Region VI, Federal Center 800 North Loop 288 C. Kirksey/C. M. Canady Denton, TX 76209-3698 City of Austin Electric Utility Department Roger Mulder 721 Barton Springs Road State Energy Conservation Office Austin, TX 78704 P.O. Box 13528 Austin, TX 78711 J. J. Nesrsta/R. K. Temple City Public Service Board Jack Colley, State Coordinator P.O. Box 1771 Division of Emergency Management San Antonio, TX 78296 Texas Department of Public Safety P.O. Box 4087 D. G. Tees/R. L. Balcom Austin, TX 78773-0220 Texas Genco, LP P.O. Box 1700 Richard A. Ratliff, Chief Houston, TX 77251 Bureau of Radiation Control Texas Department of Health Jon C. Wood 1100 W. 49th Street Cox Smith Matthews Austin, TX 78756-3189 112 E. Pecan, Suite 1800 San Antonio, TX 78205
STP Nuclear Operating Company A. H. Gutterman, Esq. Susan M. Jablonski Morgan, Lewis & Bockius Office of Permitting, Remediation and 1111 Pennsylvania Avenue NW Registration Washington, DC 20004 Texas Commission on Environmental Quality C. A. Johnson/R. P. Powers MC-122, P.O. Box 13087 AEP Texas Central Company Austin, TX 78711-3087 P.O. Box 289, Mail Code: N5022 Wadsworth, TX 77483 Ted Enos 4200 South Hulen INPO Suite 630 Records Center Fort Worth, TX 76109 700 Galleria Parkway Atlanta, GA 30339 Director, Division of Compliance &
Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Environmental and Natural Resources Policy Director P.O. Box 12428 Austin, TX 78711-3189 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711
STP Nuclear Operating Company E-Mail To:
( ) NRC Attendees PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE RLF2 R. Franovich, NRR Enforcement Coordinator EJB1 E. Benner JLD Jennifer Dixon-Herrity, RIV EDO Coordinator DHJ D. Jaffee, Project Manager, NRR JLT2 J. Taylor, Senior Resident Inspector VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES CJG, SLR RA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB, JLH2 DRS Secretaries CMS, JAK, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM Ann Mattila, Security Advisor SISP Review Completed: __WDJ___ ADAMS: / Yes G No Initials: __WDJ__
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive S:DRP\DRPDIR\EOC 04\Meeting Notice\STPEOC5-3-05MN.wpd RIV:C:DRP/A PAO RSLO C:DRP/A WDJohnson VDricks WMaier WDJohnson
/RA/ /RA/ CJGordon for /RA/
4/14/5 4/13/05 4/14/05 4/14/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax