ML051040344

From kanterella
Jump to navigation Jump to search
Agenda for Meeting with BWROG to Discuss Reactor Recirculation Pump Issues, Potential plant-specific Strategies for Vibration Monitoring, and the BWROGs Intended Scope of Work on This Issue
ML051040344
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 04/10/2005
From: Bo Pham
NRC/NRR/DLPM/LPD4
To: Gramm R
NRC/NRR/DLPM/LPD4
pham b m, nrr dlpm lpdiv-2, 301-415-8450
Shared Package
ML051050192 List:
References
Download: ML051040344 (1)


Text

AGENDA MEETING WITH THE BOILING WATER REACTOR OWNERS GROUP (BWROG)

MAY 10, 2005 8:00 am

Introductions

(GE)

Meeting Purpose Meeting Agenda Preview 8:15 am BWROG Organization / Ad Hoc Process (GE) 8:45 am Sulzer Pumps Vibration Monitoring, Inspection, (Sulzer)

Maintenance, and Replacement Recommendations Product improvements PUBLIC COMMENT 9:45 am BREAK 10:15 am Flowserve Pumps Vibration Monitoring, Inspection, (Flowserve)

Maintenance, and Replacement Recommendations Product improvements 11:15 am Review of Applicable GE SILs (GE) 12:00 noon LUNCH 1:00 pm NRC Perspectives (NRC)

PUBLIC COMMENT 1:30 pm Background Information and Potential BWROG Workscope (GE)

Previously Identified Presentation made at February 2-3, 2005, BWROG General Meeting January 2005 survey summary 2:30 pm MEETING ADJOURN