MONTHYEARPMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230637, Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Environmental2023-06-27027 June 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Environmental ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides PMNS20230723, Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Safety2023-06-0808 June 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Safety PMNS20230124, Meeting with Constellation Energy Generation, LLC (CEG) Regarding Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities)2023-02-24024 February 2023 Meeting with Constellation Energy Generation, LLC (CEG) Regarding Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities) PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20220116, Meeting with Constellation Energy Generation, LLC (CEG) Regarding a Proposed Alternative to Extend the Inservice Inspection Intervals at Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 22022-02-10010 February 2022 Meeting with Constellation Energy Generation, LLC (CEG) Regarding a Proposed Alternative to Extend the Inservice Inspection Intervals at Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210635, Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 22021-05-24024 May 2021 Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15182A4292015-07-0101 July 2015 Bra BYR Cli DRE Lasa Qua Operator License Workshop Invitation ML14324A1392014-11-20020 November 2014 Notice of Closed Meeting with Exelon Nuclear to Discuss Exelon Nuclear'S 12/19/2013, Application for Amendment of the Dresden and Quad Cities Nuclear Power Station'S Technical Specifications to Add Reference to Topical Report WCAP-16865-P-A ML14169A4542014-06-13013 June 2014 Ltr 6/13/14 Bra BYR Cli DRE LAS Qua Operator License Workshop ML13193A0482013-08-14014 August 2013 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (EGC) Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13123A3432013-05-0202 May 2013 Ltr 5/2/13 Bra BYR Cli Dres LAS Qua 2013 Operator Licensing Workshop ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1203301242012-02-0909 February 2012 Handout for Public Meeting on February 9, 2012 (Slides) ML1201103342012-01-19019 January 2012 2/9/2012 Notice of Meeting with Exelon Nuclear/Quad Cities Nuclear Power Station Re Netco Spent Fuel Pool Rack Insert ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1105407242011-02-23023 February 2011 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 ML1031601532010-11-0909 November 2010 Annual Offsite Agency Dinner Meeting for the Offsite Emergency Response Support Personnel/Letter ML1019000152010-07-0909 July 2010 Forthcoming Meeting with Exelon Generation Company, LLC to Discuss Revisions to the Cyber Security Plan Submittal for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0813303912008-05-12012 May 2008 Forthcoming Meeting with ESBWR DCWG Regarding Combined License (COL) Activities ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0714404642007-05-23023 May 2007 End-of-Cycle Meeting - NRC Slides ML0706405332007-03-0808 March 2007 Notice of Meeting with Exelon to Discuss the Results and Conclusions of Evaluations and Plant Modifications Performed to Support Extended Power Uprate (EPU) Operation of Quad Cities Nuclear Power Plant, Units 1 and 2 2024-01-29
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 ML23216A0692023-08-0404 August 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Nuclear Plant for Performance for 2022 Calendar Year ML23179A1802023-06-28028 June 2023 07122023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year PMNS20230637, Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Environmental2023-06-27027 June 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Environmental PMNS20230723, Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Safety2023-06-0808 June 2023 Pre-Submittal Meeting for Subsequent License Renewal Application for Dresden Nuclear Power Station, Units 2 and 3 - Safety ML23145A1272023-05-26026 May 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Power Station for Performance for 2022 Calendar Year ML23132A1912023-05-15015 May 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Dresden Nuclear Plant for Performance for 2022 Calendar Year PMNS20230124, Meeting with Constellation Energy Generation, LLC (CEG) Regarding Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities)2023-02-24024 February 2023 Meeting with Constellation Energy Generation, LLC (CEG) Regarding Planned License Amendment Request for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities) PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels ML22137A3192022-05-18018 May 2022 Notice of Significant Public Mtg to Discuss End-of-Cycle Performance Assessment of Dresden, Units 2 and 3, and Quad Cities, Units 1 and 2, for 2021 Calendar Year ML22138A1422022-05-18018 May 2022 Notice of Information Meeting (Public Webinar) with a Question-and-Answer Session to Discuss NRC 2021 End-of-Cycle Plant Performance Assessment of Dresden, Units 2 & 3, and Quad Cities, Units 1 & 2 PMNS20220116, Meeting with Constellation Energy Generation, LLC (CEG) Regarding a Proposed Alternative to Extend the Inservice Inspection Intervals at Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 22022-02-10010 February 2022 Meeting with Constellation Energy Generation, LLC (CEG) Regarding a Proposed Alternative to Extend the Inservice Inspection Intervals at Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals ML21166A1812021-06-15015 June 2021 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station Units 1 and 2 for Performance for 2020 Calendar Year PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210635, Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 22021-05-24024 May 2021 Public Meeting Regarding Pre-submittal for Proposed License Amendment Requests Associated with Transition to New Fuel Type and Vendor at LaSalle Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20191A0612020-07-0808 July 2020 7/29/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Dresden Nuclear Power Station and Quad Cities Nuclear Power Station Performance for the 2019 Calendar Year ML19151A4952019-05-30030 May 2019 6/22/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Dresden Nuclear Power Station Performance for the 2018 Calendar Year ML19108A3572019-04-17017 April 2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Quad Cities Nuclear Power Station Performance for the 2018 Calendar Year ML18191B2242018-07-10010 July 2018 7/25/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Dresden Nuclear Power Station Performance for the 2017 Calendar Year ML18121A3922018-05-0101 May 2018 5/31/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-Of-Cycle Assessment of the Quad Cities Nuclear Power Station Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17258A0222017-09-14014 September 2017 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Exelon Sites (CMS) ML17123A3942017-05-0303 May 2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Dresden Nuclear Power Station Performance for the 2016 Calendar Year ML17108A7212017-04-18018 April 2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Quad Cities Nuclear Power Station Performance for the 2016 Calendar Year ML16152A9932016-05-31031 May 2016 6/30/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Dresden Nuclear Power Station Performance for the 2015 Calendar Year ML16109A1922016-04-18018 April 2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Quad Cities Nuclear Power Station for the 2015 Calendar Year ML15182A4292015-07-0101 July 2015 Bra BYR Cli DRE Lasa Qua Operator License Workshop Invitation ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15118A8172015-04-28028 April 2015 Notice of Meeting with Exelon Generation Company, LLC to Discuss with the Licensee the 2014 Annual Assessment Results for Quad Cities Nuclear Power Station ML15092A8822015-03-30030 March 2015 Meeting Notice with Public to Discuss 2014 EOC Braidwood and Dresden Combined ML14324A1392014-11-20020 November 2014 Notice of Closed Meeting with Exelon Nuclear to Discuss Exelon Nuclear'S 12/19/2013, Application for Amendment of the Dresden and Quad Cities Nuclear Power Station'S Technical Specifications to Add Reference to Topical Report WCAP-16865-P-A ML14219A2822014-08-0707 August 2014 Notice of Forthcoming Meeting with Exelon Generation Company, LLC (EGC) Regarding Areva Xm Fuel Transition Request for Dresden and Quad Cities Nuclear Stations ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14169A4542014-06-13013 June 2014 Ltr 6/13/14 Bra BYR Cli DRE LAS Qua Operator License Workshop ML14139A3652014-05-19019 May 2014 Notice of Meeting with Exelon Generation Company, LLC to Discuss Dresden Performance for the 2013 Calendar Year with the Public ML14134A0192014-05-13013 May 2014 Notice of Meeting with Exelon Generation Company, LLC, Quad Cities to Discuss Performance for the 2013 Calendar Year ML14066A4252014-03-0606 March 2014 March 17, 2014, Notice of Significant Non-Public Closed Enforcement Conference to Discuss an Apparent Violation of NRC Requirements Occurred at Quad City 2024-01-29
[Table view] |
Text
April 14, 2005 MEMORANDUM TO: Gene Suh, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Lawrence Rossbach, Project Manager, Section 2 /RA/
Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH EXELON GENERATION COMPANY, LLC - QUAD CITIES AND DRESDEN NUCLEAR POWER STATIONS DATE & TIME: Monday, April 25, 2005, 1:00 p.m. to 4:00 p.m.
Tuesday, April 26, 2005, 8:00 a.m. to 4:00 p.m.
Wednesday, April 27, 2005, 8:00 a.m. to Noon LOCATION: Exelon Nuclear Cantera Cornerstone 2 4300 Winfield Road Warrenville, IL 60555 PURPOSE: Discuss Exelons fabrication drawings, ring test results, scale model test results, and fatigue analysis for new steam dryers for the Quad Cities Nuclear Power Station. Discuss Exelon's corrective actions for flow induced vibration effects on components other than steam dryers and extent of condition followup items.
CATEGORY:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the U.S. Nuclear Regulatory Commission (NRC) after the business portion, but before the meeting is adjourned.
Proprietary information may be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and Region III (RIII).
NRC Exelon Generation Co.
D. Terao, NRR J. Meister M. Ring, RIII A. Shahkarami T. Scarbrough, NRR R. Gesior J. Wu, NRR K. Moser L. Rossbach, NRR G. DeBoo et al. J. Nosko P. Simpson T. Roddey et al.
Docket Nos. 50-237, 50-249, 50-254, and 50-265
Attachment:
Agenda cc w/att: See next page MEETING CONTACT: Lawrence Rossbach 301-415-2863 lwr@nrc.gov
April 14, 2005 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and Region III (RIII).
NRC Exelon Generation Co.
D. Terao, NRR J. Meister M. Ring, RIII A. Shahkarami T. Scarbrough, NRR R. Gesior J. Wu, NRR K. Moser L. Rossbach, NRR G. DeBoo et al. J. Nosko P. Simpson T. Roddey et al.
Docket Nos.: 50-237, 50-249, 50-254, and 50-265
Attachment:
Agenda cc w/att: See next page MEETING CONTACT: Lawrence Rossbach 301-415-2863 lwr@nrc.gov DISTRIBUTION:
PUBLIC PDIII-2 R/F BSheron TMarsh/JLyons AMohseni GSuh LRossbach KGrimes PCoates OPA DTerao TScarbrough GImbro JWu MRing, RIII UShoop JStrasma, RIII PMNS TMensah OGC ACRS/ACNW DHills, RIII KManoly JStang KStoedter, RIII MBanerjee DHelton SMalik GThomas BElliot Receptionists (OWFN and TWFN)
ADAMS Accession Number: ML051030428 OFFICE PDIII-2/PM PDIII-2/LA PDIII-2/SC NAME LRossbach PCoates GSuh DATE 4/14/05 4/14/05 4/14/05 OFFICIAL RECORD COPY
AGENDA TECHNICAL MEETING BETWEEN NRC AND EXELON DESIGN AND ANALYSIS OF NEW QUAD CITIES STEAM DRYERS AND FLOW INDUCED VIBRATION EFFECTS ON COMPONENTS OTHER THAN STEAM DRYERS April 25, 2005, 1:00 p.m. - 4:00 p.m.
April 26, 2005, 8:00 a.m. - 4:00 p.m.
April 27, 2005, 8:00 a.m. - Noon
! Introduction and opening remarks.
! Licensee presentation and discussions on:
-Corrective actions for flow induced vibration effects on components other than steam dryers
-Extent of condition followup items.
! Licensee presentation and discussions on design and analysis of new steam dryers:
-Fabrication drawings
-Seismic load analysis
-New dryer 50.59
-Ring test results and comparison with Finite Element Analysis results
-Scale model test results
-Fatigue analysis
-Startup test plan and procedure
-Acoustic circuit analysis
! Discussion involving proprietary information (if necessary).
! Licensee presentation and discussions on operational strategy.
-Basis for returning Unit 2 to EPU power
-Plan and basis for returning Unit 1 to EPU power
! Discussion involving proprietary information (if necessary).
! Summary.
! Public comments for NRC.
! Adjournment.
ATTACHMENT
Dresden and Quad Cities Nuclear Power Stations cc:
Site Vice President - Dresden Nuclear Power Station Vice President of Operations - Mid-West Exelon Generation Company, LLC Boiling Water Reactors 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9765 4300 Winfield Road Warrenville, IL 60555 Dresden Nuclear Power Station Plant Manager Exelon Generation Company, LLC Vice President - Licensing and Regulatory 6500 N. Dresden Road Affairs Morris, IL 60450-9765 Exelon Generation Company, LLC 4300 Winfield Road Regulatory Assurance Manager - Dresden Warrenville, IL 60555 Exelon Generation Company, LLC 6500 N. Dresden Road Director - Licensing and Regulatory Morris, IL 60450-9765 Affairs Exelon Generation Company, LLC U.S. Nuclear Regulatory Commission 4300 Winfield Road Dresden Resident Inspectors Office Warrenville, IL 60555 6500 N. Dresden Road Morris, IL 60450-9766 Associate General Counsel Exelon Generation Company, LLC Chairman 4300 Winfield Road Grundy County Board Warrenville, IL 60555 Administration Building 1320 Union Street Manager Licensing - Dresden, Morris, IL 60450 Quad Cities and Clinton Exelon Generation Company, LLC Regional Administrator 4300 Winfield Road U.S. NRC, Region III Warrenville, IL 60555 801 Warrenville Road Lisle, IL 60532-4351 Site Vice President - Quad Cities Nuclear Power Station Illinois Emergency Management Exelon Generation Company, LLC Agency 22710 206th Avenue N.
Division of Disaster Assistance & Cordova, IL 61242-9740 Preparedness 110 East Adams Street Quad Cities Nuclear Power Station Springfield, IL 62701-1109 Plant Manager Exelon Generation Company, LLC Document Control Desk - Licensing 22710 206th Avenue N.
Exelon Generation Company, LLC Cordova, IL 61242-9740 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Dresden and Quad Cities Nuclear Power Stations cc:
Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.
Cordova, IL 61242 David C. Tubbs MidAmerican Energy Company One River Center Place 106 E. Second, P.O. Box 4350 Davenport, IA 52808-4350 Vice President - Law and Regulatory Affairs MidAmerican Energy Company One River Center Place 106 E. Second Street P.O. Box 4350 Davenport, IA 52808 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, IL 61201