Letter Sequence Other |
---|
TAC:MC4923, Removal of Monthly Operating Report and Occupational Radiation Exposure Report (Open) TAC:MC4924, Removal of Monthly Operating Report and Occupational Radiation Exposure Report (Open) |
|
MONTHYEARML0430102532004-10-14014 October 2004 Units 1 and 2 - Technical Specifications (TS) Change 04-08, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports. Project stage: Request ML0510203452005-04-0505 April 2005 Tech Spec Pages for Amendment No. 300 and 289, Elimination of Requirements for Monthly Operating & Occupational Radiation Exposure Reports (TS-04-08) Project stage: Other ML0504904862005-04-0505 April 2005 License Amendment No. 300 and 289, Elimination of Requirements for Monthly Operating & Occupational Radiation Exposure Reports (TS-04-08) Project stage: Other 2004-10-14
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15310A0422015-11-0404 November 2015 License Amendment Nos. 334 and 327, Improved Technical Specifications, Implementation CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4142015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 92015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 ML15205A4062015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 ML15205A4072015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 ML15205A4082015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 ML15205A4092015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 ML15205A4112015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 ML15205A4122015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 ML15205A4132015-07-24024 July 2015 Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 ML13330A9242013-11-22022 November 2013 Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems ML13330A9272013-11-22022 November 2013 Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems ML13329A7182013-11-22022 November 2013 Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10 ML13330A9282013-11-22022 November 2013 Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0 ML13329A7902013-11-22022 November 2013 Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 ML13330A9312013-11-22022 November 2013 Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems ML13330A9532013-11-22022 November 2013 Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On.. ML13330A9302013-11-22022 November 2013 Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations ML13330A9292013-11-22022 November 2013 Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0 ML13330A9252013-11-22022 November 2013 Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0 ML13330A9222013-11-22022 November 2013 Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0 ML13329A9162013-11-22022 November 2013 Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0 ML13329A8592013-11-22022 November 2013 Enclosure 2 - Volume 7 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits, Revision 0 ML13329A8582013-11-22022 November 2013 Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems, Revision 0 2024-01-29
[Table view] |
Text
ADMINISTRATIVE CONTROLS
- j. Technical Specification (TS) Bases Control Program This program provides a means for processing changes to the Bases of TSs.
- a. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
- b. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
- 1. A change in the TS incorporated In the license or
- 2. A change to the updated FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
- c. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.
- d. Proposed changes that meet the criteria of Specification 6.8.4.j.b above shall be reviewed and approved by the NRC prior to Implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).
6.9 REPORTING REQUIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted in accordance with 10 CFR 50.4.
STARTUP REPORT 6.9.1.1 DELETED 6.9.1.2 DELETED 6.9.1.3 DELETED ANNUAL REPORTSI-6.9.1.4 Annual reports covering the activities of the unit as described below for the previous calendar year shall be submitted prior to March 1 of each year. The initial report shall be submitted prior to March 1 of the year following initial criticality.
6.9.1.5 DELETED 1/ A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station.
SEQUOYAH - UNIT 1 6-11 Amendment No. 12, 32, 58, 72, 74, 148, 174, 233, 280,300
ADMINISTRATIVE CONTROLS ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT-/
6.9.1.6 The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted prior to May I of each year. The report shall Include summaries, interpretations, and analysis of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in (1) the ODCM and (2) Sections IV.B.2, IV.B.3, and IV.C of Appendix I to 10 CFR Part 50.
6.9.1.7 (Relocated to the ODCM.)
ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT- 1 /
6.9.1.8 The Annual Radioactive Effluent Release Report covering the operation of the unit during the previous calendar year shall be submitted prior to May I of each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be (1) consistent with the objectives outlined in the ODCM and PCP and (2) In conformance with 10 CFR 50.36a and Section IV.B.1 of Appendix I to 10 CFR Part 50.
6.9.1.9 (Relocated to the ODCM or PCP.)
1/ A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station; however, for units with separate radwaste systems, the submittal shall specify the releases of radioactive material from each unit.
SEQUOYAH - UNIT 1 6-12 Amendment No. 42, 58, 74, 117, 148, 169, 281,300
e ADMINISTRATIVE CONTROLS MONTHLY REACTOR OPERATING REPORT 6.9.1.10 DELETED CORE OPERATING LIMITS REPORT 6.9.1.14 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle for the following:
- 1. f1(Al) limits for Overtemperature Delta T Trip Setpoints and f2 (AI) limits for Overpower Delta T Trip Setpoints for Specification 2.2.1.
- 2. Moderator Temperature Coefficient BOL and EOL limits and 300 ppm surveillance limit for Specification 314.1.1.3,
- 3. Shutdown Bank Insertion Limit for Specification 314.1.3.5,
- 4. Control Bank Insertion Limits for Specification 3/4.1.3.6,
- 5. AXIAL FLUX DIFFERENCE Limits for Specification 3/4.2.1,
- 6. Heat Flux Hot Channel Factor and K(z) for Specification 3/4.2.2, and
- 7. Nuclear Enthalpy Rise Hot Channel Factor for Specification 3/4.2.3.
6.9.1.14.a The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC in:
- 1. BAW-10180P-A, Rev. 1, NEMO - NODAL EXPANSION METHOD OPTIMIZED", March 1993. (FCF Proprietary)
(Methodology for Specification 3.1.1.3-Moderator Temperature Coefficient)
- 2. BAW-1 01 69P-A, "RSG PLANT SAFETY ANALYSIS - B&W SAFETY ANALYSIS METHODOLOGY FOR RECIRCULATING STEAM GENERATOR PLANTS", October 1989.
(FCF Proprietary)
(Methodology for Specification 3.1.1.3-Moderator Temperature Coefficient)
- 3. BAW-10163P-A, Core Operating Limit Methodology for Westinghouse-Designed PWRs, June 1989. (FCF Proprietary)
(Methodology for Specification 2.2.1, - Limiting Safety System Settings f1(Al), f2(al) limits], 3.1.3.5 - Shutdown Bank Insertion Limits, 3.1.3.6 - Control Bank Insertion Limits, 3/4.2.1 - Axial Flux Difference, 3/4.2.2 - Heat Flux Hot Channel Factor, 3/4.2.3 -
Nuclear Enthalpy Rise Hot Channel Factor)
- 4. BAW-10168P-A, Rev.2, RSG LOCA - B&W Loss of Coolant Accident Evaluation Model for Recirculating Steam Generator Plants, (FCF Proprietary)
(Methodology for Specification 3/4.2.2 - Heat Flux Hot Channel Factor)
- 5. BAW-10168P-A, Rev 3, RSG LOCA - B&W Loss of Coolant Accident Evaluation Model for Recirculating Steam Generator Plants, (FCF Proprietary)
(Methodology for Specification 3/4.2.2 - Heat Flux Hot Channel Factor)
SEQUOYAH - UNIT 1 6-13 Amendment No. 52,58, 72, 74,117,152, 155,156,171, 216, 223,281,300
ADMINISTRATIVE CONTROLS ANNUAL REPORTS /
6.9.1.4 Annual reports covering the activities of the unit as described below for the previous calendar year shall be submitted prior to March 1 of each year. The initial report shall be submitted prior to March 1 of the year following Initial criticality.
6.9.1.5 DELETED 1/A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station.
I SEQUOYAH - UNIT 2 6-11 Amendment No. 34, 50, 66, 107,134, 165, 271, 272,289
r ADMINISTRATIVE CONTROLS MONTHLY REACTOR OPERATING REPORT 6.9.1.10 DELETED .
CORE OPERATING LIMITS REPORT 6.9.1.14 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle for the following:
- 1. f1(Al) limits for Overtemperature Delta T Trip Setpoints and f2(AI) limits for Overpower Delta T Trip Setpoints for Specification 2.2.1.
- 2. Moderator Temperature Coefficient BOL and EOL limits and 300 ppm surveillance limit for Specification 3/4.1.1.3,
- 3. Shutdown Bank Insertion Limit for Specification 3/4.1.3.5,
- 4. Control Bank Insertion Limits for Specification 3/4.1.3.6,
- 5. AXIAL FLUX DIFFERENCE Limits for Specification 3/4.2.1,
- 6. Heat Flux Hot Channel Factor and K(z) for Specification 314.2.2, and
- 7. Nuclear Enthalpy Rise Hot Channel Factor for Specification 3/4.2.3.
6.9.1.14.a The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC in:
- 1. BAW-10180P-A, Rev. 1, "NEMO - NODAL EXPANSION METHOD OPTIMIZED", March 1993. (FCF Proprietary)
(Methodology for Specification 3.1.1.3-Moderator Temperature Coefficient)
- 2. BAW-1 01 69P-A, "RSG PLANT SAFETY ANALYSIS - B&W SAFETY ANALYSIS METHODOLOGY FOR RECIRCULATING STEAM GENERATOR PLANTS", October 1989.
(FCF Proprietary)
(Methodology for Specification 3.1.1.3-Moderator Temperature Coefficient)
- 3. BAW-10163P-A, Core Operating Limit Methodology for Westinghouse-Designed PWRs, June 1989. (FCF Proprietary)
(Methodology for Specification 2.2.1, - Limiting Safety System Settings [fi(Al), f2(AI) limits], 3.1.3.5 - Shutdown Bank Insertion Limits, 3.1.3.6 - Control Bank Insertion Limits, 3/4.2.1 - Axial Flux Difference, 3/4.2.2 - Heat Flux Hot Channel Factor, 3/4.2.3
- Nuclear Enthalpy Rise Hot Channel Factor)
- 4. BAW-10168P-A, Rev. 2, RSG LOCA - B&W Loss of Coolant Accident Evaluation Model for Recirculating Steam Generator Plants, (FCF Proprietary)
(Methodology for Specification 3/4.2.2 - Heat Flux Hot Channel Factor)
- 5. BAW-1 01 68P-A, Rev 3, RSG LOCA - B&W Loss of Coolant Accident Evaluation Model for Recirculating Steam Generator Plants, (FCF Proprietary)
(Methodology for Specification 3/4.2.2 - Heat Flux Hot Channel Factor)
SEQUOYAH - UNIT 2 6-13 Amendment No. 44, 50, 64, 66,107, 134, 142,146,161, 206,214,223, 272, 289