MONTHYEARML24058A3562024-03-0707 March 2024 Examination Report No. 50-225/OL-24-01, Rensselaer Polytechnic Institute Critical Experiments Facility ML24058A3552024-03-0707 March 2024 Examination Results Letter No. 50-225/OL-24-01, Rensselaer Polytechnic Institute Critical Experiments Facility ML24002B0802024-01-0303 January 2024 – Change of Facility Project Manager IR 05000225/20232012023-12-12012 December 2023 Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2023201 - Cover Letter and Enclosure ML23164A0522023-06-13013 June 2023 Examination Report Letter No. 50-225/OL-23-01, Rensselaer Polytechnic University ML23031A2032023-03-0808 March 2023 Examination Confirmation Letter No. 50-225/OL-23-01, Rensselaer Polytechnic Institute IR 05000225/20222012023-02-0808 February 2023 – U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2022201 - Cover Letter and Enclosure IR 05000225/20222022023-02-0707 February 2023 U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000225/2022202 - Non-OUO-SRI Cover Letter ML22073A0782022-04-14014 April 2022 Examination Confirmation Letter No. 50-225/OL-22-01, Rensselaer Polytechnic Institute ML22005A3062022-01-0505 January 2022 Response Letter to NRC 2021 Inspection Report (Submission) ML21246A2742021-09-28028 September 2021 Issuance of Amendment No. 12 to Renewed Facility Operating License No. CX-22 ML21050A3862021-02-23023 February 2021 Rensselaer Polytech Institute - Request for RAI License Amendment Request for Modifications to the Restricted and Exclusion Area for the Renewed Facility Operating License (No≫ CX-22 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards IR 05000225/20202012020-10-20020 October 2020 U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2020201 ML20135H1592020-05-19019 May 2020 Additional Information Needed for the Application for a License Amendment Re Modification to the Restricted and Exclusion Areas for the Renewed Facility License No. CX-22 ML20099F9002020-04-10010 April 2020 Acceptance of the Application for a License Amendment New Definition of Facility'S Restricted and Exclusion Areas ML20076B8532020-03-30030 March 2020 Review of Revised Emergency Plan for the Renewed Facility License CX-22 ML19340C0762019-12-10010 December 2019 Supplemental Information Needed for Acceptance of the Application for a License Amendment Re Modification to the Restricted and Exclusion Areas for the Renewed Facility License No. CX-22 IR 05000225/20192012019-09-19019 September 2019 Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2019201 - August 2019 IR 05000225/20192022019-09-19019 September 2019 Nuclear Regulatory Commission Security Inspection Report No. 05000225/2019202 (Cover Letter) ML19037A2972019-02-0707 February 2019 Examination Report No. 50-225/OL-19-02, Rensselaer Polytechnic Institute ML19008A2472019-01-0909 January 2019 Examination Confirmation Letter No. 50-225/OL-19-02, Rensselaer Polytechnic Institute ML18365A3602019-01-0808 January 2019 Change of Facility Back-Up Project Manager ML18319A1072018-11-14014 November 2018 Examination Report No. 50-225/OL-19-01 IR 05000225/20182012018-10-12012 October 2018 U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2018201 ML18291A9232018-10-0202 October 2018 Submittal of Revised Emergency Plan ML18243A3172018-08-30030 August 2018 Examination Confirmation Letter No. 50-225/OL-19-01, Rensselaer Polytechnic Institute ML17348B2102017-12-26026 December 2017 Examination Report No. 50-225/OL-18-01, Rensselaer Polytechnic Institute IR 05000225/20172012017-12-0505 December 2017 Reactor Facility Routine Safety Inspection Report 05000225/2017201 ML17257A0692017-09-14014 September 2017 Examination Confirmation Letter No. 50-225/OL-18-01, Renssealer Polytechnic Institute ML17072A3712017-03-17017 March 2017 Examination Report No. 50-225/OL-17-01, Renssealer Polytechnic Institute ML16348A2972017-01-0505 January 2017 Rensselaer Polytechnic Institute - U.S. Nuclear Regulatory Commission Operations Inspection Report No. 50-225/2016-201 IR 05000225/20162022017-01-0404 January 2017 U.S. Nuclear Regulatory Commission Operations Inspection Report No. 50-225/2016-202. (Cover Letter Only) ML16257A0152016-09-14014 September 2016 Examination Confirmation Letter, No. 50/225-OL-17-01, Rensselaer Polytechnic Institute ML16252A4392016-09-0808 September 2016 Confirmation of Initial License Examination ML16179A2032016-06-0101 June 2016 Letter to Confirm Appointment as Chair of Rensselaer'S Nuclear Safety Review Board, Effective June 1, 2016 ML16050A2722016-02-24024 February 2016 Examination Report, No. 50-225/OL-16-01, Rensselaer Polytechnic Institute ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures IR 05000225/20142022015-02-0404 February 2015 IR 05000225/2014202, on 12/08-11/2014, Rensselaer Polytechnic Institute ML15020A5882015-02-0303 February 2015 Examination Report 50-225/OL-15-01, January 13, 2015, Rensselaer Polytechnic Institute ML15020A5972015-01-30030 January 2015 Examination Reults Letter No 50-225/OL-15-01 ML15041A1952015-01-23023 January 2015 Letter from Virginia C. Gregg Supporting Self-guarantee Financial Test to Demonstrate Financial Assurance, as Specified in 10 CFR Part 30 ML14336A1742014-12-0404 December 2014 Examination Notification Letter Initial Examination No. 50-225/OL-15-01 Rensselaer Polytechnic Institute ML14192A0152014-07-0101 July 2014 Change in Level 1 Personnel at RPI Reactor Critical Facility: License CX-22 ML14136A4772014-05-27027 May 2014 Change of Facility Backup Project Manager ML13346A0182013-12-0303 December 2013 Change Update in Level 2 Pesonnel at RPI Reactor Critical Facility ML13226A0702013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13233A3142013-08-0505 August 2013 Change in Level 1 Personnel at RPI Reactor Critical Facility: License Cx -22 ML13219A8432013-07-30030 July 2013 Change in Level 1 Personnel at RPI Reactor Critical Facility ML12324A0312012-11-19019 November 2012 Examination Results Letter 50-225/OL-13-01, Rensselaer Polytechnic Institute 2024-03-07
[Table view] |
Text
X ensselaer DEPARTMENT OF MECHANICAL, AEROSPACE, AND NUCLEAR ENGINEERING March 31, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555- - -
U.S. Department of Energy NE-30 John Gutteridge 1000 Independence Avenue, SW Washington, DC 20585 Re: Operations Report for the Rensselaer Polytechnic Institute (RPI) Reactor Critical Facility (RCF)
NRC License CX-22 Docket Number 50-225 To Whom It May Concern:
This document constitutes the calendar year 2004 Operations Report of the RPI RCF to the USNRC, USDOE, and to Rensselaer management.
The Reactor Critical Facility (RCF) operated successfully during calendar year 2004. The RCF was used for one laboratory course and two introductory courses in the Nuclear Engineering and Engineering Physics curricula. Eighteen credits of PhD thesis work were conducted at the facility. Two graduate students and the facility staff performed experiments and work toward submittal of a critical benchmark to the international benchmark project.
The facility staff trained two new Senior Reactor Operators who passed an NRC licensing exam in May 2004.
Work proceeded on critical experiments with the 0.640 pitch lattice plates. Critical measurements were performed with 332-pin and 333-pin configurations. Some subcritical measurements were conducted with fewer pins. The SPERT(F1) fuel is 4.81 w/o enriched high density U0 2 pellet fuel clad in stainless steel, so it is similar to power plant reactor fuel.
Rensselaer Polytechnic Institute 110 8th Street I Troy, NY 12180-3590 USA
The RCF is now the only facility in the U.S. carrying out reactor physics critical experiments in support of the power reactor function. These experiments are similar to power reactor startup measurements.
A PhD thesis experiment was completed to measure the penetration of fission gammas through fuel pin lattices without water; the application is to above-ground cask storage of spent fuel and to fuel handling devices.
Work continues on upgrading the reactor instruments, circuits, readouts, and facilities. A new rod position system was installed and replaces the original synchro transmitter-receiver system. A related Technical Specification change, approved by the Nuclear Regulatory Commission, eliminated the interlock associated with the 400 Hz motor-generator set that provided power to the synchros. The new system senses rod motion through an optical encoder mechanically coupled to the control rod. Position is determined by detecting the pulse train from the encoder in a digital counter. Position is displayed in inches withdrawn to the nearest 0.01 inch. A written test procedure was used to verify correct operation of all affected controls and indications.
A NRC inspection was performed in January 2004. NRC findings and the RPI response have been reported in other correspondence.
Funds were provided under the USDOE URI Program to complete additional upgrades. The funds are targetted for a replacement set of startup instrumentation (2 channels), control rod drive clutches, spare detectors and other instrumentation. The grant is a five year continuing program and a continuation request has been submitted.
Training and proficiency requirements for all licensed operators have been reviewed and are current.
The Technical Specifications, App. A to USNRC License CX-22, require reporting the following operational items:
- 1. Changes to facility design: The rod position system was replaced as explained above.
- 2. Significant maintenance, repairs or other work performed on RCF systems:
- a. The control panel layout was revised to accommodate the new rod position indicating devices and to consolidate other test controls.
- 3. Changes in operating procedures which relate to the safety of RCF operations: None
- 4. Surveillance checks, tests, and calibrations were conducted and logged as required.
The results were satisfactory. On November 18, 2004 an emergency preparedness drill was conducted at the RCF.
- 5. Changes, tests or experiments requiring authorization from the USNRC under 10CFR50.59 a orb: None
- 6. Glenn Winters and Jonathan Stephens have been Director and Operations Supervisor respectively through this period. Dr. Don Steiner was replaced as NSRB Chairman by Dr. Michael Podowski from the Nuclear Engineering faculty. Dr. Steiner remains as a member of the NSRB.
- 7. Calculated integrated thermal power: Approximately 5 x 10-3 kwhr for all of 2004, far less than the Technical Specification 3.1.10 limit of 200 kwhr/yr.
- 8. There were no unplanned scrams in the report interval.
- 9. Maintenance operations were carried out and logged with satisfactory results.
- 10. There were no discharges of radioactive effluents.
- 11. Environmental monitors (exclusion area and site boundary) recorded exposures less than 40 mrem per year above background. -
- 12. Facility personnel exposures were all less than 50 mRem for the report period.
Sincerely, Glenn Winters, Director RPI Reactor Critical Facility cc: Michael Podowski, Chairman, RPI NSRB Jonathan Stephens, RCF Operations Supervisor, RPI J. A. Tichy, Chair, Department of MANE, RPI Peter Caracappa, RPI Radiation Safety Officer Will Fahey, Acting Director, Environmental Health and Safety, RPI