ML051010059
| ML051010059 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/21/2003 |
| From: | Schin B - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0277 | |
| Download: ML051010059 (3) | |
Text
Akudit Question Processin~g Form Centrol Number.
(Fcr Staff use
>A' AQ Question Initiated By: Schin, Bob Date: 7/21/2003 Regulatory Basis for Question:
Question:
Response
Until the pending NRC and industry guidance (NEI 00-01) are finalized and issued, SNC cannot determine whether a revision of the current licensing basis to consider multiple hot shorts is appropriate and warranted.
More importantly, without the pending guidance SNC cannot determine with confidence the appropriate.
criteria to use in notentially' revising the SSA i
Given the statemnts e
n isquestion-resulted from review of the SSAR sectii 2-CR 003 008165 has been written to document the issue and evaluate whether additional clarification ofth SSAR is required.
Copy of CR provided.
, !,p;.
- ,a.;. ;..
- ,,r1um, was deieted
.-i accordance with the Freedom of Information Act, exemptions 4 FOJA.
=)C8-;'
(For Staff use ory)
Staff init:
Response by: _TullJ Li Reviewed by: Lu~ker, Ira N~tC 1q~stnc In Pmrnress W.... -
I Number: 2003008165 Unit: C Print Date: 712312003
- ccver Date & Time
0712212003 14:00 covered By: Tom Metzler scrivtion of Condition:
Event Date & Time 07/2212003 14:00 Department/Team: NSAC-ETM Status: REGULATORY REVIEW Phone:
5867 uipmnent Numbers and Reference Documents (tags, procedures, drawings, WOs, etc.):
hiding:
Not Applicable
.at is affected by the condition?
iderstanding of the SSAR.
Location: N/A
)w was the condition discovered?
!sponding to questions asked by the NRC inspectors.
ant ModelCondition:
mediate Notification Required?
- O Required?
D Required?
)plicable TS Section:
Power:
If yes, lh, 4h, 24h:
N/A hour(s)
Type of LCO:
WO #:
Mode Restraint:
Reported date and time:
LCO #:
)mpensatory Actions:
I viewed By:
Hopkins,Eric C Date & Time:
07/2312003 7:26 I Number: 2003008165 te Received by NSAC:
Is this condition reportable?
Severity Level:
planation:
r%___ Is _9 n nrrlarrO at
a pcnsible Dept:
Impact to the plant:
iewed By:
Date:
)roved By:
Date:
PRB Review?
intenznce Rule Scope?
Functional Failure?
Is this an MPFF?
stification:
stification by:
Date:
spcsition:
spcsitioned By:
Date:
sposition Approved By:
Date:
ose By:
Date:
gnature:
Date:
vent
Description:
'I3.ll.:32A Pa.
2 of 2
.C.d2 MAMM 7:43:25AM Page 2 of 2 DCCard2.rpt