ML050980105
| ML050980105 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/08/2005 |
| From: | Lanksbury R Division of Reactor Safety III |
| To: | Richard Anderson FirstEnergy Nuclear Operating Co |
| References | |
| Download: ML050980105 (4) | |
Text
April 8, 2005 Mr. R. Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, A290 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT 1 LICENSE CLASS 2003-01 RETAKE EXAM REQUEST
Dear Mr. Anderson:
In a letter dated February 17, 2005, (PY-CEI/OIE-0639L) your staff requested the NRC schedule and prepare a retake written examination for initial license operator examination applicants that failed the December 2004 initial license written examination. Because of recent changes in personnel assignments in Region III, we find that we do not have the resources available to prepare the requested examination.
Please contact Mr. Dell McNeil, Reactor Engineer, at (630) 829-9737 or Mr. Hironori Peterson at (630) 829-9707 if you have questions or require additional information concerning this response. Mr. Peterson will be assuming Operations Branch Chief duties and responsibilities effective April 17, 2005.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Roger Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 See Attached Distribution
April 8, 2005 Mr. R. Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, A290 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT 1 LICENSE CLASS 2003-01 RETAKE EXAM REQUEST
Dear Mr. Anderson:
In a letter dated February 17, 2005, (PY-CEI/OIE-0639L) your staff requested the NRC schedule and prepare a retake written examination for initial license operator examination applicants that failed the December 2004 initial license written examination. Because of recent changes in personnel assignments in Region III, we find that we do not have the resources available to prepare the requested examination.
Please contact Mr. Dell McNeil, Reactor Engineer, at (630) 829-9737 or Mr. Hironori Peterson at (630) 829-9707 if you have questions or require additional information concerning this response. Mr. Peterson will be assuming Operations Branch Chief duties and responsibilities effective April 17, 2005.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Roger Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 See Attached Distribution DOCUMENT NAME: ML050980105.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DMcNeil:tr RLanksbury DATE 04/06/05 04/08/05 OFFICIAL RECORD COPY
R. Anderson cc:
G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs W. OMalley, Manager, Maintenance Department Manager, Regulatory Compliance J. Messina, Director, Performance Improvement T. Lentz, Director, Nuclear Engineering Department F. Von Ahn, Plant Manager, Nuclear Power Plant Department D. Jenkins, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
R. Anderson cc:
G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs W. OMalley, Manager, Maintenance Department Manager, Regulatory Compliance J. Messina, Director, Performance Improvement T. Lentz, Director, Nuclear Engineering Department F. Von Ahn, Plant Manager, Nuclear Power Plant Department D. Jenkins, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health ADAMS Distribution:
AJM SPS1 RidsNrrDipmIipb GEG KGO RJP DRPIII DRSIII PLB1 JRK1 DCT MAB1