Text
ENERGY
()NORTHWEST People. Vision* Solutions P.O. Box 968
- Richland, WA
- 99352-0968 March 28, 2005 G02-05-059 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 WITHDRAWAL OF EMERGENCY TECHNICAL SPECIFICATION CHANGE REQUEST FOR ONE-TIME EXTENSION OF COMPLETION TIME FOR LIMITING CONDITION FOR OPERATION CONDITION 3.5.1.B
Reference:
Letter dated March 23, 2005, G02-05-057, DK Atkinson (Energy Northwest) to NRC, "Emergency Technical Specification Change Request for One-Time Extension of Completion time for Limiting Condition for Operation Condition 3.5.1.B"
Dear Sir or Madam:
With the referenced letter, Energy Northwest transmitted a license amendment request for extension to the Completion Time for condition B of Technical Specification (TS)
Limiting Condition for Operation (LCO) 3.5.1, "ECCS - Operating." This request was made as a contingency measure to avoid an unnecessary plant shutdown resulting from an inoperable High Pressure Core Spray (HPCS) System. On March 27, 2005, with repairs and operability testing completed, the HPCS System was restored to operable status within the current 14-day Completion Time. Therefore, Energy Northwest hereby withdraws the referenced license amendment request.
Energy Northwest appreciates the prompt attention of your staff to the request and regrets any inconvenience this may have caused.
NODI
WITHDRAWAL OF EMERGENCY TECHNICAL SPECIFICATION CHANGE REQUEST FOR ONE-TIME EXTENSION OF COMPLETION TIME FOR LIMITING CONDITION FOR OPERATION ACTION 3.5.1.B Page 2 Energy Northwest is notifying the State of Washington of this withdrawal of request for license amendment by providing a copy of this letter.
Should you have any questions or desire additional information regarding this matter, please call Mr. GV Cullen at (509) 377-6105.
Respectfully, DK Atkinson Vice President, Nuclear Generation Mail Drop PE08 cc: BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector/988C RN Sherman - BPA1 399 WA Horin - Winston & Strawn JO Luce - EFSEC RR Cowley -WDO