Technical Specifications, Elimination of Hydrogen Monitor Requirements Using the Consolidated Line Item Improvement Process
ML050900345
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/22/2005
From: Stephen Monarque
NRC/NRR/DLPM/LPD2
To: Christian D
Virginia Electric & Power Co (VEPCO)
Monarque S, NRR/DLPM, 415-1544
Shared Package
ML050900123 List:
References
TAC MC4393, TAC MC4394
Download: ML050900345 (3)


Text

TS 3.7-2

2. With less than the minimum number of explosive gas monitoring instrumentation channels OPERABLE, take the action shown in Table 3.7-5(a). Exert best efforts to return the instruments to operable status within 30 days and, if unsuccessful, prepare and submit a Special Report to the Commission (Region II) to explain why the inoperability was not corrected in a timely manner.

E. The accident monitoring instrumentation listed in Table 3.7-6 shall be OPERABLE in accordance with the following:

1. With the number of OPERABLE accident monitoring instrumentation channels less than the Total Number of Channels shown in Table 3.7-6, items 1 through 9, either restore the inoperable channel(s) to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
2. With the number of OPERABLE accident monitoring instrumentation channels less than the Minimum OPERABLE Channels requirement of Table 3.7-6, items 1 through 9, either restore the inoperable channel(s) to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

AmendmentNos. 239 and 238

TS 3.7-3 Basis Instrument Operating Conditions During plant operations, the complete instrumentation system will normally be in service.

Reactor safety is provided by the Reactor Protection System, which automatically initiates appropriate action to prevent exceeding established limits. Safety is not compromised, however, by continuing operation with certain instrumentation channels out of service since provisions were made for this in the plant design. This specification outlines the limiting conditions for operation necessary to preserve the effectiveness of the Reactor Protection System when any one or more of the channels is out of service.

Almost all Reactor Protection System channels are supplied with sufficient redundancy to provide the capability for channel calibration and test at power. Exceptions are backup channels such as reactor coolant pump breakers. The removal of one trip channel on process control equipment is accomplished by placing that channel bistable in a tripped mode (e.g., a two-out-of-three circuit becomes a one-out-of-two circuit). The Nuclear Instrumentation System (NIS) channels are not intentionally placed in a tripped mode since the test signal is superimposed on the normal detector signal to test at power. Testing of the NIS power range channel requires: (a) bypassing the dropped-rod protection from NIS, for the channel being tested, (b) placing the AT/Tavg protection channel set that is being fed from the NIS channel in the trip mode, and (c) defeating the power mismatch section of Tavg control channels when the appropriate NIS channel is being tested.

However, the Rod Position System and remaining NIS channels still provide the dropped-rod protection. Testing does not trip the system unless a trip condition exists in a concurrent channel.

AmendmentNos. 239 and 238

TABLE 4.1-2A(CONTINUED)

MINIMUM FREQUENCY FOR EQUIPMENT TESTS UFSAR SECTION REFERENCE DESCRIPTION

19. Primary Coolant System
20. Containment Purge MOV Leakage
21. Deleted
22. RCS Flow
23. Deleted TEST Functional Functional FREQUENCY
1. Periodic leakage testing(a)(b) on each valve listed in Specification 3.1.C.7a shall be accomplished prior to entering POWER OPERATION after every time the plant is placed in COLD SHUTDOWN for refueling, after each time the plant is placed in COLD SHUTDOWN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if testing has not been accomplished in the preceding 9 months, and prior to returning the valve to service after maintenance, repair or replacement work is performed.

Semi-Annual (Unit at power or shutdown) if purge valves are operated during interval(c)

I Flow 2 273,000 gpm Once per 18 months 14 I

(a) To satisfy ALARA requirements, leakage may be measured indirectly (as from the performance of pressure indicators) if accomplished in accordance with approved procedures and supported by computations showing that the method is capable of demonstrating valve compliance with the leakage criteria.

(b) Minimum differential test pressure shall not be below 150 psid.

(c) Refer to Section 4.4 for acceptance criteria.

See Specification 4.l.D.