ML050900342

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendments 240 & 239 Regarding Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports
ML050900342
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/22/2005
From:
NRC/NRR/DLPM
To:
Monarque, S R, NRR/DLPM, 415-1544
Shared Package
ML050900175 List:
References
TAC MC5434, TAC MC5435
Download: ML050900342 (2)


Text

TS 6.6-2 resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operations),

supplementary reports shall be submitted at least every 3 months until all three events have been completed.

2. Annual Rep=tsI
a. deleted I

Note: Footnotes 1 and 2 are located on page TS 6.6-11.

AmendmentNos. 240 and 239

TS 6.6-3

b. The results of specific activity analysis in which the primary coolant exceeded the limits of Specification 3.1.D.4. In addition, the information itemized in Specification 3.1.D.4 shall be included in this report.
3. deleted l

AmendmentNos. 240 and 239