TS 6.6-2 resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial power operations),
supplementary reports shall be submitted at least every 3 months until all three events have been completed.
- 2. Annual Rep=tsI
- a. deleted I
Note: Footnotes 1 and 2 are located on page TS 6.6-11.
AmendmentNos. 240 and 239
TS 6.6-3
- b. The results of specific activity analysis in which the primary coolant exceeded the limits of Specification 3.1.D.4. In addition, the information itemized in Specification 3.1.D.4 shall be included in this report.
- 3. deleted l
AmendmentNos. 240 and 239