ML050890405
| ML050890405 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/22/2004 |
| From: | NRC/NRR/DLPM/LPD4 |
| To: | |
| Honcharik M, NRR/DLPM, 301-415-1774 | |
| References | |
| TAC MC5209 | |
| Download: ML050890405 (2) | |
Text
...
Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.
5.6.1 (Deleted) 5.6.2 Annual Radiological Environmental Report The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Assessment Manual (ODAM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.
The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified in the table and figures in the ODAM, as well as summarized and tabulated results of these analyses and measurements in the format of the table in Regulatory Guide 4.8, December 1975. In the event that some individual results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.
(continued)
Cooper 5.0-1 8 Amendment No. 211 l
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.3 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the unit shall be sub-mitted in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODAM and the Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.
5.6.4 (Deleted) 5.6.5 CORE OPERATING LIMITS REPORT (COLR)
- a.
Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1.
The Average Planar Linear Heat Generation Rates for Specification 3.2.1.
- 2.
The Minimum Critical Power Ratio for Specifications 3.2.2 and 3.7.7.
- 3.
The three Rod Block Monitor Upscale Allowable Values for Specification 3.3.2.1.
- 4.
The power/flow map defining the Stability Exclusion Region for Specification 3.4.1.
- b.
The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1.
NEDE-2401 1-P-A, "General Electric Standard Application for Reactor Fuel" (Revision specified in the COLR).
(continued)
Cooper 5.0-1 9 Amendment No. 211 1