ML050880372

From kanterella
Jump to navigation Jump to search
Report on On-Site Property Damage Insurance
ML050880372
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/21/2005
From: Lambert C
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-05-031
Download: ML050880372 (1)


Text

SJ Committed toO Nuclearunee Nuclear Power Plant oOperated by Nuclear Management Company, LLC March 21, 2005 NRC-05-031 10 CFR 50.54(w)(3)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 Report On On-Site Propertv Damage Insurance This letter is sent in accordance with the requirements of 10 CFR 50.54(w)(3) which requires that all licensees report on April 1 of each year to the Commission their present levels of on-site property damage insurance or financial protection.

The amount of on-site primary property damage insurance, which joint owners currently maintain with Nuclear Electric Insurance Limited (NEIL) on the Kewaunee Nuclear Power Plant, is $500,000,000.

In addition, we also have NEIL II excess property insurance in the amount of

$1,300,000,000.

To our knowledge, this amount of insurance coverage complies with the requirements of 10 CFR 50.54(w)(1).

Craig W.

ert Site Vice-President, Kewaunee Plant Nuclear Management Company, LLC cc:

Resident Inspector, Kewaunee, USNRC Administrator, Region III, USNRC Mr. Ira Dinitz, USNRC Mr. David Nalepka, WPSC - D2 Risk Management N490 Highway 42

  • Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560 H dl