jJustine Burza-EDOBuletStatus PB Unit i Head Page 1 From:
Melvin Holmbergrg1 To:
Louden, Patrick -
Date:
5/20/04 4:18PM
Subject:
EDO Bullet Status PB Unit 1 Head
- Pat, Attached is my summary EDO bullet on the status of the Point Beach Unit 1 head inspection.
CC:
Caniano, Roy; Harold Chernoff; Hills, David; Morris, R. Michael; Pederson, Cynthia Gal3?
I I C:\\TEMP\\GW)00001.TMP Page 1 H CATEMP\\------01
.TMP-Page 1 I-Mail Envelope Properties (40AD20A2.726: 16: 24412)
Subject:
Creation Date:
From:
Created By:
EDO Bullet Status PB Unit I Head 5/20/04 4:18PM Melvin Holmberg MSH~nrc.gov Recipients nrc.gov ch po.CHDO CDPI CC (Cynthia Pederson)
PLL (Patrick Louden)
RJCI CC (Roy Caniano)
RMM3 CC (R. Michael Morris) nrc.gov owxf4_po.OWFNDO HKC CC (Harold Chernoff)
Post Office chpo.CHDO owf4_po.OWFNDO Route nrc.gov nrc.gov Files pbEDObullet.wpd MESSAGE Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Size 4365 603 Date & Time 05/20/04 04:14PM 05/20/04 04:18PM None Standard No None No Standard
Ultrasonic and visual examination of the 49 Unit 1 upper vessel head penetration nozzles and head vent line penetration are completed. Due to limitations in ultrasonic examination coverage at the bottom end of 17 penetration nozzle locations, the licensee has requested relaxation (currently under staff review) from examination coverage requirements in Order EA-03-009. No leaking nozzles or evidence of vessel head wastage have been identified. However, linear indications in nozzle No. 26 J-groove weld were identified which required repair. A temper bead weld repair for this nozzle has been completed and the licensee's Code relief request to approve this repair methodology is currently under review by NRR staff.