TeamTrack Reports Page 58 of 60 NMC > Sites > Point Beach Section 1 Activity Request Id:

Activity Type:

Ia One Line

Description:

I Detailed

Description:

- Action Request > Corrective Actn Program (CAP) AR CAP055595 CAP Submit Date:

4/12/2004 6:02:40 Air supply to Bubble Hoods not within procedure limits 411212004 6:02:40 - PEROUTKA, MARK:

On 9-10 -04 0330 Nozzle Dam crew requested that they needed to have the air supply increased to their air supplied hoods; RP technicians adjust flow until the nozzle crew was satisfied. Pressure on the manifold was found to be approximately 60 PSI. Procedure HPIP 4.58 requires pressure to be 20-28 PSI for a 50' length of hose. RP tech's where using one 50' hose and three 25' hoses the night that the nozzle dam where installed.

PEROUTKA, MARK Initiator Department:

PRO Rad Protection Field 6:1 Ops PB t

4/12/2004 5:54:23 Date/Time of Occurrence:

4/10/2004 3:30:00 Site-identified System:

(None)

(None)

Equipment Type (1st):

(None)

(None)

Equipment Type (2nd):

(None)

(None)

Equipment Type (3rd):

(None)

Initiator:

Date/Time of Discovery:

Identified By:

Equipment # (1 st):

Equipment# (2nd):

Equipment # (3rd):

Site/Unit:

Why did this occur?:

Immediate Action Taken:

Recommendations:

s Notify Me During Eval?:

Point Beach - Unit 1 4/12/2004 6:02:40 - PEROUTKA, MARK:

RP technicians where not aware of the procedure guidance for supplied hoods.

4/12/2004 6:02:40 - PEROUTKA, MARK:

RP technicians where made aware of the procedure and to follow it's guidance.

4/12/2004 6:02:40 - PEROUTKA, MARK:

Need to contact manufacture about clearer guidance for what pressure to use on our supplied air system. It appears that the manufacture recommends a pressure range of 30-45 PSI for our set-up. May need to update procedure if this is true.

N 6 SRO Review Required?:

N Section 2 Operability Status:

Basis for Operability:

v& Unplanned TSAC Entry:

NA 6 Compensatory Actions:

N 4/12/2004 8:44:20 - FOUSE, JIMMY:

This is a personnel safety and procedure issue not related to eqipment operability.

N I External Notification:

N http://enwsO2/tmtrack/tmtrack.dll?ReportPage&Template=reports%2Frptexec&ReportId=55 4/12/2004