TeamTrack Reports Page 58 of 60 NMC > Sites > Point Beach Section 1 Activity Request Id:
Activity Type:
Ia One Line
Description:
I Detailed
Description:
- Action Request > Corrective Actn Program (CAP) AR CAP055595 CAP Submit Date:
4/12/2004 6:02:40 Air supply to Bubble Hoods not within procedure limits 411212004 6:02:40 - PEROUTKA, MARK:
On 9-10 -04 0330 Nozzle Dam crew requested that they needed to have the air supply increased to their air supplied hoods; RP technicians adjust flow until the nozzle crew was satisfied. Pressure on the manifold was found to be approximately 60 PSI. Procedure HPIP 4.58 requires pressure to be 20-28 PSI for a 50' length of hose. RP tech's where using one 50' hose and three 25' hoses the night that the nozzle dam where installed.
PEROUTKA, MARK Initiator Department:
PRO Rad Protection Field 6:1 Ops PB t
4/12/2004 5:54:23 Date/Time of Occurrence:
4/10/2004 3:30:00 Site-identified System:
(None)
(None)
Equipment Type (1st):
(None)
(None)
Equipment Type (2nd):
(None)
(None)
Equipment Type (3rd):
(None)
Initiator:
Date/Time of Discovery:
Identified By:
Equipment # (1 st):
Equipment# (2nd):
Equipment # (3rd):
Site/Unit:
Why did this occur?:
Immediate Action Taken:
Recommendations:
s Notify Me During Eval?:
Point Beach - Unit 1 4/12/2004 6:02:40 - PEROUTKA, MARK:
RP technicians where not aware of the procedure guidance for supplied hoods.
4/12/2004 6:02:40 - PEROUTKA, MARK:
RP technicians where made aware of the procedure and to follow it's guidance.
4/12/2004 6:02:40 - PEROUTKA, MARK:
Need to contact manufacture about clearer guidance for what pressure to use on our supplied air system. It appears that the manufacture recommends a pressure range of 30-45 PSI for our set-up. May need to update procedure if this is true.
N 6 SRO Review Required?:
N Section 2 Operability Status:
Basis for Operability:
v& Unplanned TSAC Entry:
NA 6 Compensatory Actions:
N 4/12/2004 8:44:20 - FOUSE, JIMMY:
This is a personnel safety and procedure issue not related to eqipment operability.
N I External Notification: