ML050880099
| ML050880099 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/08/2004 |
| From: | Mel Holmberg NRC/RGN-III/DRS/MEB |
| To: | Dave Hills, Anton Vegel NRC/RGN-III, NRC/RGN-III/DRS/OLB |
| References | |
| FOIA/PA-2004-0282 | |
| Download: ML050880099 (2) | |
Text
~J Burza -
e Point Beach IS From:
Melvin Holmbi r
To:
Anton Vege David Hills Date:
4/8/04 8:41AM
Subject:
Re: Point Beach ISI Will do.
>>> Anton Vegel 04107/04 08:50AM >>>
Mel and Dave
.1
=
.=
I Pagge 1 At the DRS morning meeting Cindy P. requested that I verify when the Point Beach Unit 1 ISI inspection will be conducted. She wants to attend this meeting. Currently she plans to go to Point Beach on April 22 to 23. Please let me know if there are any changes.
Thanks!
Tony V.
9-4/
I l:TEMP\\GW}00001.TMP Mail Envelope Properties (4075569F.739: 16: 24412)
Paae 1 a
]
Subject:
Creation Date:
From:
Created By:
Re: Point Beach ISI 4/8/04 8:41AM Melvin Holmberg MSH~nrc.gov Recipients nrc.gov chpo.CHDO AXV (Anton Vegel)
DEH (David Hills)
Post Office chpo.CHDO Route nrc.gov Files MESSAGE Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Size 1128 Date & Time 04/08/04 08:41AM
.None Standard No None No Standard