APR 06-2004 17:04 FROM-POINT BEACH-DOSIMETRY 920-755-6260 T-633 P.001/005 F-626 POINT BEACH NUCLEAR PLANT 6610 Nuclear Road Two Rivers, WI 54241 PHONE:
(920)755-6-7,4!
FAX:
(920) 755-6118 FACSIMILE TRANSMITTAL TO:
fP~vA.)
A L xA r'jb1t2-FAX #:
, 1.5 u
3L Y1
- 4. 9% 49 C(OMPANY:
K)
FROM:
6PRIA )
DATF:
I R.Co.
CA&66O TOTAL. NYIMBF.R OF PAG.F.S SF.NT:
TIMF:
I-) 6<() -
REMARKS:
Cop'i oic ALAR-AYZ 2
RtC-'/1 i
L OQ& A/O OV-TA&-4 L
etrr v
F' iT (r-Ot bA Si.
-C
r\\-
If you do not receive all ofthepages, please contact its as soon as possible.
PBF.0)')O Revitsion 4 2t13/C1 (g /ca_
APR;06-2004 17:04 FROM-POINT BEACH-DOSIMTRY 920-755-6260 POINT 8FACH NUCLEAR PLANT ALARA Review Lor T-633 P.002/005 F-626 ALARA Controlling Review Work Est. Dose Actual Dose Date Number Document Job Description (rem)
(rem) 2004-0001 RMP-9096 Reactor Head Disassembly 1.90 rem 2004-0002 RMP-9312 Coposeal Removal, Port Cleaning and 1.30 rem Installation 2004-0003 RMP-9096 Replace Reactor Head 0-rings 0.60 rem 2004-0004 RMP-9096 Reactor Head Set on Vessel 1.00 rem 2004-0005 RMP-9096 Reactor Head Assembly 1.60 rem 2004-0006 Fuel Movement Evolutions 1.50 rem 2004-0007 RMP.9002 "B" RCP Seal and Motor Work 3.50 rem Series 2004-0008 Initial Surveys and Decon Under Reactor 1.00 rem
_Head 2004-009'
-UT-Inspection Under Reactor Held.
3309 rem, 2004-0010 Reactor Head Nozzle Repair N/A 2004-0011 Reactor Head Bare Metal Visual 0.675 rem Inspection 2004.0012 Reactor Vessel BMI Inspection 6.10 rem 2004-0013.
Install and Remove Scaffold jOOrem 2004-0014 Install and Remove Insulation 0.80 rem 2004-0015 ISI/NDE in Containment 1.00 rem 2004-0016 RMP-9007 Remove and Replace S/G Manway 1.50 rem Strongbach
_2004,0017v Install and RemovtS/G Nozzle Damns n4.20 remr 2004-0018 S/G Eddy Current Testing 5.50 rem
.2004:001 9 -Remove and Replace StG 1RH Covern, X.00 rems..
tSludge! ee'a-nsd VPOSM7*;ctiof5 2004-0020 Transfer Tri-nuke Filters to Pillbox 0.075 rem 2-17-04 2004-0021 Troubleshoot/Replace 2LT-939 1.00 rem 3-9-04 2004-0022 MR-04-010 2LT-939 modification installation 1.080 rem WO Workl plan
- 's 0406194 and 0406214 2004-0023 Regen Hx'er Cubicle Maintenance 0.600 rem 2004-0024 Under Rx Head Vent Line Penetration PT 0.650 rem Exam __-_.__
J.
I PBF-4195 Revisionl 03I21/03 HP 15.3 Rcmrcne: NP 4.2.1
Kewvay Enides - Inspecl & MaIntain Equipment 04 132 1
En 0.450 Keyway Entries - ORT-61 2 2 ODs 0.250 BMl Insp ction - Scaffold Install f Remove 04 133 1
CE 1.600 BMI Inspoction - Remove Old Insulation 2
CE 1.500 BMI Inspaction - Inslall New Insulation 3
CE 1.600 B1MI Inspection-Decon 4
RP 0.125 BMI Inspectlon - NDE 5
Eng 0.650 BMI Inspection-RP 6
RP 0.625 Regen Heat Exchanoer Cubicle Maintenance 04135 Min M
0.600 CTMT Walkdowvns and Inspection - Admin / Mgmt /QC/ NO 04 136 1
Admin 0.459 CTMT Walkdowns and Inspection - EnpIneerin_
2 Eno 0.752 GTMrVInsalVlRernoveScaolld CE
---3.00D CTMT InslalU Remove Insulation 04 138 CE 0.800 CTT NDE & ISI 04 139 Eng 1.000 SiG Manwav/Diaphragm RemovaVReplacement 04 140 Mln 1.500 Nozle Darns Install / Remove 04 141 Enq 4.320 Steam Generator Eddy Current Tesling 04 142 1
Eno 5.500 S'G Sludge Lance Activitles 04 143 Eng 2.500 SIG Handhola Covers, Removal/Replacemenl 04 144 Mtn 1.500 Maint. Activitles Inside Refuel Barrlers 04 145 Mtn 0.100 Containment Maint. LHRA Transit 04 146 fAtn 0.050 Eng.,NDE & ISI. LHRA Transit 04 147 Eng 0.050 N~s~
kS?-4>'Ž$+/-.-w s
¢
. - -~48 ;ff Cavity Filler Removal 04150 RP 0.075 Upper Internals Sot to Vessel 04 151 Mtn 0.100 Reaclor Head Set 04152 Mtn 1.001 Reactor Head MainUlPost Reaclor Head Set - Stud hole capa/Hole cloaniinaSeal riln removal 04 163 1
Mtn 0.200 Reactor Head MaintiPost Reaclor Head Set - I & C Cavity Restoration 2
Mtn 0.050 Reactor Head Dress & Slud Tonsioning 04 154 Mtn 1.350 gJppr CavitY Decon_
04155 RP 0.275 Lower Cavity - Decon 04 156 1
RP 0.200 Lower Cavity - Transfer Canal Flange/FME Insp./Misc work(incides Strainer) 2 Ops 0.500 Gontainment Radiography 04 157 Eno 0.300 PAB Mechanical Valve Maintenance 04 158 Mtn 2.206 PAB Electrical Valve MaIntenance 04 159 Mtn 0.620 PAB Install/ Remove insulation 04 160 CE 0.100 PAB NDE & ISI Activities 04 161 Ena 0.100 PAB Instal/ Remove Scaffold 04 162 CE 0.100 PAB Walkdowns and Inspeclions - Admin I Mqrti NO 04163 1
Admin 0.057 PAB Walkdowns and Inspecfons-Enpineering 2
Ena 0.063 PAB Maintenance - Outage Related Maint 04 164 I
Mtn 0.067 PAO Maintenance I & C Cals & Misc Work 2
Mtn 0.063 PAB Maintenance - Construclion Enginearing 3
CE 0.195 PAB Radiography 04 165 Eng 0.030 I.
r.,1.b
-I
'1
-,4
-E
--4 ao C)
-14 (31 I3 C) gn
--4
(.
C)
'1 C)
C" en ent
I.,
PO.)
-4=
0)
Polnt Beach Nuclear Plant U1R28 Estimated RWP Dose
-1 RWP Descriptlon Number rask GrOtUP Est. Dose Radiation Protection Outage Acfivities 04104 RP 6.00C Oporatfons Outaqe Activities 04 105 Ops 2.750 Laundry Decon Outage Activities 04 106 RP 1.400 Install/Remove TemporarY Shielding in Containment and PAB 04 107 RP 0.600 Site Waste Outage ActivitIes 04108 RP 0.100 Ctmt General Entry Opening Weekend - RP 04109 1
RP 0.349 Ctmt General Entry Opening Weekend - Operations 2
OpS 0.101 Ctrnt Genera EntrY Opentn_ Weekend - I & C3 Mitn 0.003 Ctmnt Gecneral Entry Opening Weekend - Mainlenanca (IIncludes Hatch Operator)
Mtn 0 05E Ctmt 13eneral Entry Openin Weekend - EnfInearln Eno 0.015 Ctrnt General EnlrY Opening Weekend - Construction Enginearing n CE 0.165 Ctrnt General En__y Opening Weskend - Laundrv Decon 7
RP 0.035 Shutdown Reactor Coolani Systern Leak Checks 04110 Eng 0.400 Reactor Head DIsassemblyffead Lit Preps - Head Stripping'Sandbox Covers 04 111 1
Mtn 1.800 Reactor Head Disasserbly/Head Litl Preps - I & C Preps for Floodup 2
Mtn 0.100 Seal Table AcWtilles 04112 Mtn 0.100 Reactor Head Lift 04113 Mtn 0.350 Upper Inlemals Lift (From RX Vessel to Stand) 04114 Mtn 0.100 Fuel Movement Activities 04115 Ops 1.500 Reactor Head Mainlenance In Reactor Head Lay Dovm Area 04116 Mtn 0.125 Replace Reactor Head O" Rings 04 117 Mtn 0.600 Conoseal Renoval 04 118 Mtn 0.250 Conoseal Cleaning 04119 Mtn 0.010 Conoseal Reactor Head Lay Down Area ActIvitles 04120 Mtn 0.190 Conoseal InstallatIon 04121 Mmt 0.850 Reactor Coolanl Pump MaintenaceVConlrolled Side Maintenance Shop 04 123 Mtn 0.005 Containment Mafntenance - I & C Cal6 & Misc. Work 2
Mtn 0.500I Qoxtalnmen1 Maintenanoee Constnuctlon Englneernlo
'-~
.;,r 0
~
sy~;v wv * -
3 G E
-r d 0C Contalnmenl Mechanical Valve Maintenance 4 125 Mtn 1.200 Containment Electrical Vale MaIntenance 04126
_Mtn 0.375 Framatone Set-up Equipment in Ctml 04 127 Eng 0.500 RX Head - InIlial under Head Surveys 04128 RP 4
1.000 Head Insoections in CalIIV & RH-tWA 04129 Eno 0..6751 h.S7S
'Head UTInspection- (under head) -ra
.M'_'-
- Eno R
1.000
'Hed U Inecton trderhea)
-RJ7
- j j.0 ELDTm-o~~?0~11
~I/. 3CO'I
-u 0) 0)b 0~
~1 0) en
CleansIda RCA'S 04166 l
l Mtn 0.005 Checkllst 20 Walkdowns 04167 Admin 0.400 Ctml General Enly Slatt-Up eal-Up-RP 04168 1
RP 0.269 Ctml General Enlry Slart-Up Heal-Up - Operations 2
Ops 0.095 Ctml General EnlrY Slart-UHeal-UD - I & C 3
Min 0.011 Ctml General Entr Start-UplHeal-Up - Maintenane (Includes Hatch Operator_
4 Mtn 0.146 Cum General Enlr Start-UpHeal-Up - Engineering 5
Eno 0.041 Ctmt General Entiy SlaTt-Up Heat-Up - Construction Enginearing 6
CE 0.187 Ctmt General Enlny SiI-Upeat-Up - Laundry Decon 7
RP 0.092 R
04 169 Eng 0.250 RV Head Roplacernent Pro~et Walkdowns & Inspections 04170 Eng 0.050 NRC Walkdowns & Inspections 04 171 NRC 0.10D fld1 zo!
la &
t ocatadd-es-;z
&t>
$.pa.;. c4A73F!:
S.
iTzi t s
n RY Head Venl Line Penetral!Dn PT
.0.650 CfXItir1W g
.__,s_
Total 72 213