ML050880086

From kanterella
Jump to navigation Jump to search
E-Mail from M. Holmberg, Riii, to M. Morris, Riii, Subj: Point Beach Head Inspection
ML050880086
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/29/2004
From: Mel Holmberg
NRC/RGN-III
To: Morris R
NRC/RGN-III
References
FOIA/PA-2004-0282
Download: ML050880086 (2)


Text

I Justine Burza - Re: Point Beach Head Insnection Page 1, 11 s

B Re P

B Ha s

t a

1

-I.

From:

Melvin Holmberg To:

R. Michael Morris

/

Date:

4/29/04 10:53AM

Subject:

Re: Point Beach Head Inspection Thanks! I will try and talk with Brian Kemp today.

>>> R. Michael Morris 04/28/04 06:49PM >>>

Mel, I was just informed by plant management that they believe that they have a sub-surface indication on a J-grove weld on nozzle number 26. The indication is being evaluated and they should have more information in the morning. This is one of the steeper nozzles. Brian Kemp is going to call you tomorrow with more information.

R. Michael Morris CC:

Duane Karjala; Hills, David; Patrick Louden g-'z6

3 CATEMP\\GW}Evt011.TMP

_ ___62 Mail Env elope Properties (409 125 14.7E9: 16: 244 12)

Page 1 1

Subject:

Creation Date:

From:

Created By:

Re: Point Beach Head Inspection 4/29/04 10:53AM Melvin Holmberg MSH@nrc.gov Recipients nrc.gov chpo.CHDO DAK2 CC (Duane Karjala)

DEH CC (David Hills)

PLL CC (Patrick Louden)

RMM3 (R. Michael Morris)

Post Office chjpo.CHDO Route nrc.gov Files MESSAGE Options Expiration Date:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

Size 1199 Date & Time 04/29/04 10:53AM None Standard No None No Standard