ML050880054
| ML050880054 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/14/2004 |
| From: | Nuclear Management Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0282 CAP055704 | |
| Download: ML050880054 (1) | |
Text
TeamTrack Reports Page 19 of 49 NMC > Sites > Point Beach - Action Request > Corrective Actn Program (CAP) AR Section 1 Activity Request Id:
CAP055704
(
Activity Type:
th One Line
Description:
1 Detailed
Description:
CAP Submit Date:
4/14/2004 5:14:20 PM Worker Exposure Being Tracked on Outage Standing RWP vs Refueling RWP 4/14/2004 5:14:20 PM - LANGE, ED:
The radiation work permit for Operations outage activities,04-105, was use to support ORT-15 work. The intended radiation work permit was04-115, fuel movement activities, was use during the night shift but not on the dayshift. The content of the radiation work permits provide adequate controls to protect personnel during the ORT-15 trouble shooting, repair and performance, but the exposure would not be captured as part of the fuel movement activities.
LANGE, ED 2J Initiator Department:
PR Radiation Protection PB 4/14/2004 4:53:09 AM Date/Time of Occurrence:
4/14/2004 4:53:09 AM Site-identified System:
(None)
Initiator:
Date/Time of Discovery:
Identified By:
Equipment # (1 st):
Equipment # (2nd):
Equipment # (3rd):
Slte/Unit:
Why did this occur?:
(None)
Equipn (None)
Equipn (None)
Equipn Point Beach - Unit 1 4/1412004 5:14:20 PM - LANGE, ED:
Unknown.
nent Type (1st):
ient Type (2nd):
ient Type (3rd):
(None)
(None)
(None) 4/15/2004 7:54:15 AM - SHELEY, TOM:
Information:
Immediate Action Taken:
Recommendations:
6Q Notify Me During Eval?:
Section 2 Operability Status:
Basis for Operability:
'; Unplanned TSAC Entry:
Contacted Operations SRO that interfaced with the ORT 15 activity. He specifically asked PR what RWP applied to the task and was informed which one to sign onto. The PR briefing also use this RWP.
4/14/2004 5:14 20 PM - LANGE, ED:
Contacted Work Control Center to inform Operations Group that dayshift personnel needed to be briefed and signed in on RWP 04-115 and that ORT-15 support could not be performed on RWP 04-105.
Briefed OPS personnel Discussed item with RPM Wrote AR 4/14/2004 5:14:20 PM - LANGE, ED:
Brief RP personnel on this situation.
Include this in the job history file.
N 0 SRO Review Required?:
N NA I Compensatory Actions:
N 4/14/2004 5:20:44 PM - BOWE, STEVE:
This is an exposure tracking issue. All exposure was properly controlled per RP practices.
N I External Notification:
N
@ _/ 9 http:llenwsO2/tmtrack/tmtrack.dll?ReportPage&Template=reports%2Frptexec&ReportId=55 4/15/2004