Davis-Besse Nuclear Power Station 5507 Norfh Stale Route 2 Oak Harbor. Ohio 434499760 Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1404 March 25. 2005 James L. Caldwell Regional Administrator, Region I11 U S. Nuclear Regulatory Commission 2443 Warrenville Rd, Suite 2 10 Lisle. IL 60532-4352
Subject:
Report of Personnel Exposures > 100mWyr
Dear Mr. Caldwell:
The attached report provides a tabulation of the number of personnel receiving exposures greater than 100 mRem during 2004 in accordance with Davis-Besse Technical Specification 6.9.1 S.a.
Should you have any questions or require additional information, please contact Mr. Clark A.
Price. Manager - Regulatory Compliance, at 419-321 -8585.
Sincerely yours, Lynn R. Harder Manager - Radiation Protection Davis-Besse Nuclear Power Station J L Slag Attachments cc: American Nuclear Insurers USNRC Resident Inspector (DBNPS)
USNRC Document Control Desk Utility Radiological Safety Board Offsite Safety Review Committee MAR 2 8 inn5
Serial Number 1 - 1404 Docket Number 50-346 License Number NPF-3 bcc: IM.
B. Bezilla, Vice President - Nuclear B. S. Allen. Director - Site Operations R. A. I-Iruby, Manager - Nuclear Oversight C. A. Price, Manager - Regulatory Compliance
Docket Numnber 50-346 License Number NPF-3 Serial Number 1 - 1404 Report of Personnel Exposures Greater than 100 &ern in 2004 (Regulatory Guide 1.16 Information)
OAVIS-BESSE NUCLEAR POWER STATION Elare.
9 1 MAR 2 0 0 5 0 8. O R LICENSE:
Work and Job Functiori PLANT OPERATIONS AND SURVEILLANCE MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING ROUTINE PLANT MAINTENANCE MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING INSERVICE INSPECTION MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING SPECIAL MAINTENANCE MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING WASTE PROCESSING MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING REFUELING MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING Totals MAINTENANCE AND CONSTRUCTION OPERATIONS HEALTH PHYSICS SUPERVISORY ENGINEERING Grand Totals RPgUlatory Guide 1 1 6 Information End of Year Report 2 0 C 4 Number of Personnel
> l o o mrem station 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 3
0 0
0 0
0 0
0 1
0 3
0 0
4 Utility 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 Contractor 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
1 Total man-rem
- Stat ion 0. 0 6 1 0.875 0.621 0.010 0.122 0.834 0. 1 0 0 0.124 0.000 0.043 0. 0 0 0 0.000 0. 0 0 0 0. 0 0 0 0. 0 0 0 0.651 0.532 0.582 0.172 0.531 0.018 0.032 0.942 0.001 0.004 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 1.564 1.539 2.269 0.183 0.700 6.255 Utility Contractor 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0.000 0.004 0.000 0.000 0.000 0. 0 0 0 0. 0 0 0 0. 0 0 0 0.000 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0.000 0.004 0.000 0.000 0.000 0.004 0, 0 1 0 0.123 0.087 0.023 0.021 0.438 0.011 0.032 0.000 0.033 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0.000 0.381 0.181 0.044 0.011 0.095 0.036 0.003 0.033 0.000 0.006 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 0 0 0 0. 8 6 5 0. 3 1 8 0.196 0.034 0.155 1.568
- The total radiation exposure of the above personnel constitutes 100% of the site's exposure for the year
Docket Number 50-346 License Number NPF-3 Serial Number 1 - 1404 Page 1 of 1 COMMITMENT LIST The follon.ing list identifies those actions committed to by the Davis-Besse Nuclear 1o~ el-Station i n this document. Any other actions discussed in the submittal represent intended or planned actions by Da\\is-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (41 9-32 1-8585) at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None NiA
txrremeiy urgent This envelope is for use with the following services:
ura Next way Hir UPS Worldwide Express" UPS 2nd Day Air" Call 1-800-PICK-UPSe (1-800-742-5877) or visit UPS.com?
For UPS Next Day Air services, there is no weight limit for I
than those listed above are rates for the applicable wei For UPS Worldwide Express, be used only for documents is no limit on the weight or Apply shipping documents on this side Do not use this envelope for:
UPS Ground envelopes containing correspondence, urgent documents, is selected, UPS Express Enycln-
-mQining items other and electronic media. When a UPS Next Day Air service llpC C t m A r d m l r -w-rn-
-U.
W +. a. l N 3'
-*.pur I *. y
- c c d n n. I. u
-w--- ---
- b u l l r m g n ). y 1
I WEIGHT DIMENSIONAL I
WEIGHT I
--MkUWP.lh
-lslm.*c.cul w t c d '
9 Do not use UPS 2nd Day Air over 13 ounces in this envei UPS Express Envelopes weig to the corresponding rates t
- Do not send cash or cash el 1 A92 6/00 1WZ BKK)
=
r SI I
I II I 8
1 I,623403 560600 3221498 1
TELEPHONE I \\FIRST ENERGY CO 4 19-321 -7481 IDAVIS-BESSE NUCLEAR POWER PIAN
ELJMENTS WRDAY DELIVERY 0 12 400 556 22 1007 773 0 12 488 556 22 1007 773 0 I
I i I
Mr. James Caldwell j
Regional Administrator 1
1 U. S. NRC, Region I l l m
2443 Warrenville Rd., Suite 21 0 1 I
Lisle. IL 60532-4352 i z 488 556 22 1007 773 a I
I