March 29, 2005 Mr. Bryce L. Shriver President-PPL Generation and Chief Nuclear Officer PPL Susquehanna, LLC Two North Ninth Street, GENTW15 Allentown, PA 18101-1179

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) - REQUEST TO USE NON-NIOSH-APPROVED DELTA AIR SUPPLIED SUITS (TAC NOS. MC5634 AND MC5635)

Dear Mr. Shriver:

In reviewing your submittal of December 14, 2004, concerning a request to use non-NIOSH

[National Institute for Occupational Safety and Health]-approved delta air supplied suits, the Nuclear Regulatory Commission staff has determined that additional information contained in the enclosure to this letter is needed to complete its review. These questions were discussed with your staff during a teleconference on March 17, 2004. As agreed to by your staff, we request you respond within 30 days of the date of this letter.

If you have any questions, please contact me at 301-415-1030.

Sincerely,

/RA/

Richard V. Guzman, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

RAI cc w/encl: See next page

Mr. Bryce L. Shriver President-PPL Generation and Chief Nuclear Officer PPL Susquehanna, LLC Two North Ninth Street, GENTW15 Allentown, PA 18101-1179

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) - REQUEST TO USE NON-NIOSH-APPROVED DELTA AIR SUPPLIED SUITS (TAC NOS. MC5634 AND MC5635)

Dear Mr. Shriver:

In reviewing your submittal of December 14, 2004, concerning a request to use non-NIOSH

[National Institute for Occupational Safety and Health]-approved delta air supplied suits, the Nuclear Regulatory Commission staff has determined that additional information contained in the enclosure to this letter is needed to complete its review. These questions were discussed with your staff during a teleconference on March 17, 2004. As agreed to by your staff, we request you respond within 30 days of the date of this letter.

If you have any questions, please contact me at 301-415-1030.

Sincerely,

/RA/

Richard V. Guzman, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

RAI cc w/encl: See next page DISTRIBUTION:

Public OGC GMatakas, Rgn-1 RGuzman DLPM DPR PDI-1 R/F RLaufer MO'Brien RLPedersen SKlementowicz ACRS Accession Number: ML050870035 OFFICE PDI-1/PM PDI-2/LA IPSB/SC PDI-1/SC NAME RGuzman MO'Brien SKlementowicz RLaufer DATE 3/25/05 3/24/05 3/24/05 3/24/05 OFFICIAL RECORD COPY

Enclosure REQUEST FOR ADDITIONAL INFORMATION RELATING TO REQUEST TO USE NON-NIOSH [NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH]-APPROVED DELTA AIR SUPPLIED SUITS FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 PPL SUSQUEHANNA, LLC (PPL)

ALLEGHENY ELECTRIC COOPERATIVE, INC.

DOCKET NOS. 50-387 AND 50-388

1.

Based on a review of the attachments provided in PPLs submittal, the manufacturer states (and the European Certification Authority assumes) the V4 MTH2 suit is authorized for single-use only. Please confirm that the suit will be discarded after one use.

2.

Verify that PPL will not use the V4 MTH2 suit in environments that are immediate deleterious to life and health.

3.

Verify that PPL has committed to timely reporting of any defects experienced with these suits to the manufacturer and other U.S. users.

4.

While PPL committed to develop implementing procedures (and training lesson plans) for using the suits, please identify any of the manufacturer's technical information (i.e.,

instructions for use) and directions provided, that will not be required by procedures. For each instruction identified, explain the rationale for not including it in the program's procedures/training (and for any other compensating actions).

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Britt T. McKinney Vice President - Nuclear Site Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert A. Saccone General Manager - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Performance Improvement and Oversight PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Gregory F. Ruppert General Manager - Nuclear Engineering PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Dale F. Roth Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director - Bureau of Radiation Protection Pennsylvania Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Enclosure Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803