ML050840533

From kanterella
Jump to navigation Jump to search
Activity Request RCE000254 Root Cause Evaluation Potential for No Hot Leg Vent Path During Unit 1 SG Nozzle Dam Installation
ML050840533
Person / Time
Site: Point Beach 
(DPR-024)
Issue date: 04/12/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050840533 (2)


Text

--- -- 7Nuclear Management Company PagelI of 2 E State Change History I'

RCE Initiate 0

by PFAFF, SCOTT 61 Assign Work 4/1212004 11:00:10 Owner

RUSSELL, PATRICK Assign 0

by RUSSELL, PATRICK Conduct Work 4/1212004 16:35:24 Owner

HETTICK, DENNIS Return 0

by HETTICK, DENNIS Assign Work 5/2412004 10:54:23 Owner

RUSSELL, PATRICK Assign 0

by RUSSELL, PATRICK Conduct Work 5126/2004 14:14:19 Owner

HETTICK, DENNIS

'ra El Section 1 Activity Request Id:

Activity Type:

Site/Unit:

@ One Line

Description:

Activity Requested:

RCE000254 Root Cause Evaluation Submit Date:

4/12/2004 11:00:10 Point Beach - Unit 1 Potential for No Hot Leg Vent Path during Unit I SG Nozzle Dam Installation.

Due date moved to 6/27 per discussion with Gary VanMiddlesworth on 5/27. Need outage completed, team re-formed and RC completed and presented to CARB. Second extension concurred by Gary VanMiddlesworth Perform a Root Cause Evaluation of CAP in accordance with NMC RCE Manual. 30 DAY DUE DATE.

Per Manager's Meeting of 4-12-04, Pat Russell, is the sponsor. This RCE requires CARB review once completed. Contact RCE Coordinator (SJNikolai) to schedule this review.

N 3 Mode Change Restraint:

(None)

HOLZMANN, MIKE 1i Initiator Department:

N Nuclear Oversight PB 0 CATPR:

Initiator:

Responsible Group Code: A Assessment PB Activity Supervisor:

RUSSELL, PATRICK 0 8 Section 2 Responsible Department:

Activity Performer:

Assessment HETTICK, DENNIS El Priority:

2 Due Date:

6/27/2004 Management Exception From PI?: N i QAINuclear Oversight?: N V Licensing Review?:

N NRC Commitment?:

N i NRC Commitment Date:

i Significance Level:

A E Section 3 Activity Completed:

Hot Buttons:

(None)

El Section 4 QA Supervisor:

(None)

Licensing Supervisor:

(None)

@ Root Causes & Contributing Causes:

0

@ Proposed Corrective Actions,CA Focus: 0

  • Compensatory or Interim Corrective Actions: 0 0 Previous Similar Events:

0

  • Safety Sign.,EOC,Maint. Rule Considerations: 0 0 Operating Experience:

0 0 Effectiveness Review Plan:

0 E Notes/Comments Due date change by HETTICK, DENNIS (5/12/2004 11:19:31)

Due date changed to 5/27/04. Extension form (attached) discussed and approved at screen team meetiong of 5/11/04.

Note created during 'Return' transition by HETTICK, DENNIS (5/24/2004 10:54:23) 0 Request extension of this item. This RCE should be completed as a multi-discipline team. Recommend that a team be assembled after the outage, and the charter changed accordingly.

Currently, there are no team members working on this RCE due to outage activities and unavailabil8ity.

http://enwsO2/tmtrack/tmtrack.dll?IssuePage&Template=viewbody&recordid=595 181 &tab... 5/27/2004

Nuclear Management Company Page 2 of 2 I have been involved in department activities during the PA manager's absence.

E Attachments and Parent/Child Links Subtask from CAP055538: Potential for No Hot Leg Vent Path during Unit I SG Nozzle Dam Installation. by PFAFF, SCOTT (4/12/2004 11:00:10)

C Linked from CA057033: Place Procedure on ADMIN HOLD & Fix - SG manway removal/installation RMP by KREIL, JULIE (4/13/2004 10:04:40)

ID Linked from CAP055585: Imp roveent to Hot Leg Vent Path Controls Required. by KREIL, JULIE (4113/2004 10:15:25)

RCE 254 Root Cause Evaluation Charter.pdf (118834 bytes) by NIKOLAI, STEPHEN (4/29/2004 9:56:52) 5 RCE254 Extension Request.pdf (87131 bytes) by KREIL, JULIE (5/11/2004 12:58:03) 8 Change History 512412004 10:54:23 by HETTICK, DENNIS Attachment Added: Note created during 'Retum' transition 512612004 14:14:19 by RUSSELL, PATRICK Activity Requested Changed From '[Original Text]' To '[Prepended:]Due date moved to 6/27 per discussion with Gary VanMiddlesworth on 5/27. Need outage completed, team re-formed and RC completed and presented to CARB. Second extension concurred by Gary VanMiddlesworth' Due Date Changed From 5127/2004 To 6/27/2004 Last Modifier Changed From *....... To........

Last State Change Date Changed From *"*... To......

Last State Changer Changed From ***-To.--

State Changed From.*.... To *......

Owner Changed From......

To Assigned Date Changed From `--To'*****-

Last Modified Date Changed From

  • To ***....

http://enwsO2/tmtrack/tmtrack.dll?IssuePage&Template=viewbody&recordid=595 181 &tab... 5/27/2004