FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perry Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 March 11,2005 PY-CEI/NRR-2866L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440

Subject:

2004 Annual Report Ladies and Gentlemen:

Attached is the 2004 Annual Report for the Perry Nuclear Power Plant (PNPP), Unit 1.

This report is submitted in accordance with Technical Specification 5.6.1 and 10 CFR 50.46, and fulfills ongoing commitments associated with Licensing Commitment 17 contained in the PNPP Updated Safety Analysis Report, Appendix 1 B.

If you have questions or require additional information, please contact Mr. Jeffrey Lausberg, Manager-Regulatory Compliance at (440) 280-5940.

Very truly yours, Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region IlIl REIRS Project Manager, -

~

I

'., I

^, _.

I.

." I

Attachment PY-CEI/NRR-2866L Page 1 of 5 FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT January 1,2004to December-31, 2004, ANNUAL REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 Contents 10 CFR 50.46 Reporting of Emergency Core Cooling System (ECCS) Errors and Model Changes Silicone Sealant Inspections Occupational Radiation Exposure Summary Report

Attachment PY-CEI/NRR-2866L Page 2 of 5 10 CFR 50:46 Reporting of ECCS Errors and Model Changes New Errors and Changes:

Changes.

None Errors:

None A_

Note:

Global Nuclear Fuels (GNF) did issue one notice to site on May 14, 2004 - GNF Notification 2003-05, dated May 14"t, 2004. This notification documents correspondence to the Perry site in 2003 discussing an error in the SAFERIGESTR model. This issue was included in the 2003 NRC Annual Letter PY-CEI/NRR-2774L, dated March 1, 2004.

Attachment PY-CEI/NRR-2866L Page 3 of 5 Silicone Sealant Inspections No inspections were scheduled or performed this year. Inspection activities are currently scheduled to be performed in RFO10 (Feb-March, 2005).

~

Attachment PY-CEI/NRR-2866L Page 4 of 5 Occupational Radiation Exposure Summary Report Attached is the 2004 Annual Occupational Exposure Summary Report for the Perry Nuclear Power Plant as required by Technical Specification 5.6.1.

The Radiation Work Permit (RWP) under which an individual worked defines the Work Function. An individual may be counted in more than one category.

The Job Function and the Station/Utility/Contract Workers and Others are determined by record of individual signing onto an RWP.

The Number of Personnel >100 mrem are determined by the number of individuals with greater than 100 mrem in the corresponding Work and Job Function.

Both the Number of Personnel >100 mrem and the Total Man-rem are determined using Direct Reading Dosimeters (DRD).

No work activity for 2004 was categorized as Special Maintenance or In-Service Inspection.

2004 PERRY NUCLEAR POWER PLANT TECHNICAL SPECIFICATION 5.6.1 APPENDl A REPORT (REG GUIDE 1.16)

I Number of Personnel (>100 mrem) 1 Total Person-rem Work & Job Function Station Utility Contract Workers and Station Utility Contract Workers and Employees Employees Others Employees Employees Others Reactor Operations & Surveillance I

i Maintenance Personnel 0

0 0

0.130 1 0.005 0.302 Operating Personnel 0

0 0

0.002 i 0.000 0.000 Health Physcis Personnel 0

0 0.134 0.000 0.001 Supervisory Personnel 0

0 0

0.000 p 0.000 0.000 Engineering Personnel 0

0 0

0.029 1 0.000 0.000 I

_I_

Routine Maintenance

__I Maintenance Personnel 69 3

29 17.7201 1.542 12.583 Operating Personnel 47 2

1 13.9411 0.525 0.373 Health Physcis Personnel 31 0

8 12.635 V 0.021 2.147 Supervisory Personnel 0

0 0

0.007A 0.012 0.228 -

Enqineerinn Personnel

.0 0

0 0.508 0.137 0.054 Inservice Inspection Maintenance Personnel 0

0 0

0.000 1 0.000 0.000 Operating Personnel

.0 0

0 0.000 I 0.000 0.000 Health Physcis Personnel 0

0 0

0.000 I 0.000 0.000 Supervisory Personnel i0 0

0 0.000 V 0.000 0.000 Engineering Personnel 0

0 0

0.000 ;

0.000 0.000 Special Maintenance l

Maintenance Personnel 10 0

0 0.0001 0.000 0.000 Operating Personnel 0

0 0

0 0.000 I 0.000 0.000 Health Physcis Personnel 0

0 0

0.000 I 0.000 0.000 Supervisory Personnel 0

0 0

0.000'I 0.000 0.000 Engineering Personnel 0

0 0

0 0.000 0.000 0.000 Waste Processing Maintenance Personnel I 0 0

0 0.021 i 0.000 0.000 Operating Personnel

$ 2 0

0 0.797, 0.032 0.001.

Health Physcis Personnel i 0 0

0 0.4011 0.000 0.014 Supervisory Personnel I 0 0

0 0.0001 0.000 0.000 Engineering Personnel I0 0

0 0.000 I 0.000 0.000 Refueling Maintenance Personnel 1

1 2

20 0.472a 0.358 4.372 Operating Personnel t.1 0

0 0.387 i 0.028 0.074 Health Physcis Personnel 1

I 0

1 0.485 0.000 0.296 Supervisory Personnel 1 0 0

0 0.000 0.000 0.000 Engineering Personnel I 1 0

3 0.265 0.288 0.502 Total Maintenance Personnel 170 5

49 18.343 1.905 17.257 Operating Personnel 150 2

1 15.127 0.585 0.448 Health Physcis Personnel 132 0

7 13.655 0.021 2.458 Supervisory Personnel I 0 0

0 0.007, 0.012 0.228 Engineering Personnel i

0 3

0.802.

0.425 0.556 l____

Grand Total 1153 7

60 47.934 2.948 20.947

-0 )