March 24, 2005 Mr. R. Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, A290 10 Center Road Perry, OH 44081
Dear Mr. Anderson:
We have received the enclosed Federal Emergency Management Agency (FEMA)
Region V final exercise report, dated February 14, 2005, for the October 5, 2004, Plume Exposure Pathway Exercise at the Perry Nuclear Power Plant (ADAMS Accession No. ML050810184).
One Area Requiring Corrective Action (ARCA) was identified by FEMA Region V staff regarding the performance of Ashtabula County and then corrected. No ARCAs were identified regarding performance of the State of Ohio.
We fully recognize that any corrective actions to be implemented may involve parties and political institutions which are not under your direct control. Nonetheless, we expect that assistance, if appropriate, will be extended.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www/nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Security and Preparedness Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosure:
As stated See Attached Distribution
March 24, 2005 Mr. R. Anderson Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, A290 10 Center Road Perry, OH 44081
Dear Mr. Anderson:
We have received the enclosed Federal Emergency Management Agency (FEMA)
Region V final exercise report, dated February 14, 2005, for the October 5, 2004, Plume Exposure Pathway Exercise at the Perry Nuclear Power Plant (ADAMS Accession No. ML050810184).
One Area Requiring Corrective Action (ARCA) was identified by FEMA Region V staff regarding the performance of Ashtabula County and then corrected. No ARCAs were identified regarding performance of the State of Ohio.
We fully recognize that any corrective actions to be implemented may involve parties and political institutions which are not under your direct control. Nonetheless, we expect that assistance, if appropriate, will be extended.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www/nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Security and Preparedness Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosure:
As stated See Attached Distribution DOCUMENT NAME: G:DRS\\ML050840335.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME RJickling:tr KRiemer DATE 03/24/05 03/24/05 OFFICIAL RECORD COPY
Mr. Anderson cc w/out encl: G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs W. OMalley, Manager, Maintenance Department Manager, Regulatory Compliance J. Messina, Director, Performance Improvement T. Lentz, Director, Nuclear Engineering Department F. Von Ahn, Plant Manager, Nuclear Power Plant Department D. Jenkins, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health W. King, FEMA Region V
Mr. Anderson cc w/out encl: G. Leidich, President - FENOC L. Myers, Chief Operating Officer, FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs W. OMalley, Manager, Maintenance Department Manager, Regulatory Compliance J. Messina, Director, Performance Improvement T. Lentz, Director, Nuclear Engineering Department F. Von Ahn, Plant Manager, Nuclear Power Plant Department D. Jenkins, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health W. King, FEMA Region V ADAMS Distribution:
AJM SPS1 RidsNrrDipmIipb GEG KGO RJP DRPIII DRSIII PLB1 JRK1