ML050840099

From kanterella
Jump to navigation Jump to search
E-Mail Individual to Allegations@Nrc.Gov Point Beach
ML050840099
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/27/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050840099 (1)


Text

i/

From:

To:

Date:

Subject:

[allegationinrc.gov>

5/27/04 12:51PM Point Beach

.2 Kc i76 PBNP has performed a temporary repair of penetration 26 in the Unit 1 RPV head.

The NRC is involved in approving this repair.

It again appears that neither the NRC nor the NMC is being assertive in ensuring the safety of the public. Thus, I am communicating the following concern.

Fracture mechanics analyses have been used to justify the acceptability of the repair.

The limiting analysis indicates that the repair is good for approximately 1.5 years of operation.

A PBNP operational cycle is approximately 1.3 years.

Obviously, there is little margin provided with the PBNP repair design.

The fracture mechanics analysis is based on assuming an existintg crack within the material. The assumed flaw size for PBNP is arbitrary and very

...small. In fact,.suspiciously small to allow achieving a calculated operational..

life greater than a plant operational cycle.

Please provide written justification that the assumed PBNP flaw size contained in the fracture mechanics analyses for the temporary repair is in fact bounding for any and all potential existing flaws.

£7 9 naormaabo wi s

Fredow on&qM InC aexdaie with Freed=2 of InfiormaSon EC Y7 1-