E-Mail L. Raghavan, NRR, to B. Bateman, NRR, Et Al., Update-Point Beach Vessel Head Inspection
ML050830365
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/14/2004
From: Raghavan L
NRC/NRR/DLPM
To: Bateman W
NRC/NRR/DE/EMCB
References
FOIA/PA-2004-0282
Download: ML050830365 (1)


Text

Harold Chernoff -.Upgte - Point Beach'Veisel head inspqtiqn I

 - --

i -fi- -- ---.

w v

w w

Page i 1 Harold Chernoff - Update-Point Beach Vessel head tpc!1/2 Page 1 From:

Lakshminaras Raghavanr To:

Bateman, Bill; Keim, Andrea; Koo, William; Steingass, Timothy /

Date:

Fri, May 14, 2004 8:42 AM

Subject:

Update - Point Beach Vessel head inspection latest update on Point Beach.

The licensee is going to perform manual ultrasonic testing (UT) below the J-weld on Nozzles #32 and #33.

This should eliminate the need for Order Relaxation for Nozzle #32. Nozzle #33 still needs Relaxation to address the 60 degree arc above the J-groove. The licensee will not request Relaxatiob for the 95%

visual head exam. The licensee will not set the Head back on the Vessel until all the technical issues are resolved.

rags 415-2429 CC:

Chernoff, Harold