E-Mail H. Chernoff, NRR, to L. Raghavan, NRR, Upender
ML050830317
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/03/2004
From: Chernoff H
NRC/NRR/DLPM/LPD3
To: Raghavan L
NRC/NRR/DLPM
References
FOIA/PA-2004-0282
Download: ML050830317 (1)


Text

Harold Chernoff - upender Page 1 From:

Harold Chernoff To:

Lakshminaras Raghavan Date:

Mon, May 3, 2004 7:48 AM

Subject:

upender Preliminary Information On 4/30/04, with a fuel assembly in the spent fuel pool upender, the upender could not be fully raised.

The upender/assembly were mannually raised and the assembly movedto the SFP rack. It was estimated that a 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> delay in critical path time would occur to repair the upender.

hkc Harold Chernoff, Project Manager - Point Beach Project Directorate ll-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Office: (301) 415-4018 Fax: (301) 415-1222