ML050830083
| ML050830083 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/08/2004 |
| From: | King D NRC/ADM/DC |
| To: | |
| References | |
| Job Code J3020, NRC-03-03-037 | |
| Download: ML050830083 (5) | |
Text
ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMPORTANT: Mark all packages and papers with contract andor order numnbers.
BPA NO.
1 DATE OF ORDER l Ic7 A
- 2. CONTRACT NO. (If ny)
. SHIP TO 1
h/
INRC-03-03-037SIPO RFC N
REO03O03037 Na.
NAME OF CONSIGNEE 3 ORDERNO.
MODIFICATIONNO.
4 REUISMONREFERENCENO.
U.S. Nuclear Regulatory Commission 043 NRR-03-037-043 Ofc. of Nuclear Reactor Requlation
- 5. ISSUING OFFICE (Address correspondence to)
- b. STREET ADDRESS U.S. Nuclear Regulatory Commission Attn:
Donald P.
Norkin Division of Contracts' Two White Flint North - MS T-7-I-2 CITY
- d. STATE a ZIP CODE Contract Management Branch No. 2 Washington, DC 20555 Washington DC 20555
- 7. TO
- f. SHIP VIA
- NAME OF CONTRACTOR BECKMAN AND ASSOCIATES INC E TYPEOFORDER
- b. COMPANY NAME
- a. PURCHASEORDER
- b. DELIVERYITASK ORDER Reference your Except for biting hnstructions on Iha reverse. this c STREET ADDRESS Please ftlsnh tIhe folloving on the terms and delveryttask order Is subjet to Instrijtions 1071 STATE ROUTE 136 conditoris specifed on both sides of this order contained on this side only of tris form and Is and on the attached sheet If any. krcluding Issued subject to tie terms and conditions
- d.
CITY a STATE
- f.
ZIP CODE delivery as Indicated, of the above-nuartered contract BELLE VERNON PA 150122926
- 9.
ACCOUNTING AND APPROPRIATION DATA
- 10. REQUISITIONINGOFFICE NRR B&R No.:
520-15-122-142 Job Code:
J-3020 BOC: 252A APPN NO.: 31X0200.520 FFSI: NRR03037043 Ofc. of Nuclear Reactor Regulation OBLIGATE:
$27,235.65 II.
BUSINESS CLASSIFICATION (Check appropriate box(es))
ED a SMALL
- b. OTHER THAN SMALL cr DISADVANTAGED
[ d. WOMEN-OWNED
- 12.
F.O.B. POINT
- 14.
GOVERNMENT BIL NO.
- 15.
DELIVER TO F.O.B.
POINT 1
- 1. DISCOUNT TERMS N/AON OR BEFORE I
N/A I
See Attached I
N/A
- 13. PLACE OF FOR INFORMATION CALL (No colect calls)
- a. INSPECTION b.ACCEPTANCE MONA SELDEN 301-415-7907
- 17. SCHEDULE (See reverse for Rejections)
QUANTITY UNIT QUANTITY ITEM NO.
SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED (A)
(B)
(C)
(D)
(E)
(F)
(G)
SEE ATTACHED PAGE 2 OF 2 FOR DESCRIPTION OF TASK ORDER NO. 043 UNDER NRC-03-03-037 NOTE:
CONTRACTOR IS REQUIRED TO SIGN PAGE 2 OF THIS DOCUMENT AND RETURN TWO COPIES TO THE ISSUING OFFICE.
- 18. SHIPPING POINT I19. GROSS SHIPPING WEIGHT l 20. INVOICE NO.
SUBTOTAL SEE BILLING INSTRUCTIONS ON REVERSE
- 21. MAIL INVOICE TO:
17(h)
TOTAL U.S. Nuclear Regulatory Commission pages)
Division of Contracts p
- b. STREET ADDRESS (or P.O. Box)
Contract Management Branch No. 2 17(i).
GRAND TOTAL 27, 235.65
- c. CITY
- d. STATE DC
- a. ZIP CODE 20555 S
.
4
- 23. NAME (Typed)
Donald A. King TITLE: CONTRACTINGIORDERING OFFICER Ti0MPIATE - ADPMA00 oPmecrif SU cP eAds avp1+ett
I NRC-03-03-037 TASK ORDER NO. 043 Page 2 of 2
SUBJECT:
ISSUANCE OF TASK ORDER NO. 043 "POINT BEACH TRIENNIAL FIRE PROTECTION INSPECTION" UNDER CONTRACT NO. NRC-03-03-037 This confirms the verbal authorization that was provided to Beckman and Associates, Inc.
(BAA), effective October 22, 2004, to begin work under the subject task order, with a temporary ceiling of $10,000.00.
In accordance with Section G.5, Task Order Procedures, of the subject contract, this definitizes the subject task order. The effort shall be performed in accordance with the enclosed Statement of Work.
Task Order No. 043 shall be in effect from October 22, 2004, through December 10, 2004, with a cost ceiling of $27,235.65. The amount of $26,346.03 represents the estimated reimbursable costs, and the amount of $889.62 represents the fixed fee.
The followi id nsidered to be essential to the successful performance of work hereunder:
l The Contractor agrees that such personnel shall not be removed from the effo e ask order without compliance with Contract Clause H.4, Key Personnel.
The issuance of this task order does not amend any terms or conditions of the subject contract.
Acceptance of Task Order No. 043 should be made by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Specialist. You should retain the third copy for your records.
Enclosure:
Statement of Work AC ET ask Od`No..043 NAME TITLE DATE
CONTRACT NRC-03-03-037 STATEMENT OF WORK Task Order No. 043 TITLE: Point Beach Triennial Fire Protection Inspection INSPECTION REPORT NUMBER: 50-266/2004-0?; 50-301/2004-0?
B&R NUMBER: 520-15-122-142 JOB CODE: J-3020 NRC PROJECT OFFICER: Donald Norkin, NRR, (301) 415-2954 TEAM LEADER:
George Hausman, Region III (630) 829-9743 PERIOD OF PERFORMANCE: 10/22104 - 12/10/04 BACKGROUND In accordance with the Baseline Inspection portion of the NRC Reactor Oversight Process, a Triennial Fire Protection (TFP) inspection will be conducted for the Point Beach nuclear plant, near Manitowoc, WI. The following inspection procedure will be used and provided by the Team Leader:
71111.05, "Fire Protection" OBJECTIVE The objective of this task order is to obtain expert technical assistance in the Fire Protection Engineer area to assist the NRC inspection team in the performance of the inspection. The specialist shall have experience/knowledge regarding Appendix R fire protection requirements:
WORK REQUIREMENTS AND SCHEDULE It shall be the responsibility of the contractor to assign qualified technical staff, employees, and subcontractors, who have the required educational background, experience, or combination thereof, to meet both the technical and regulatory objectives of the work specified in this Statement of Work (SOW). The NRC will rely on representation made by the contractor concerning the qualifications of the personnel proposed for assignment to this task order including assurance that all information contained in the technical and cost proposals, including resumes and conflict of interest disclosures, is accurate and truthful.
The Team Leader may issue technical direction from time to time during the duration of this task order. Technical direction must be within the general Statement of Work stated in this task order, and shall not constitute new assignments of work or changes of such nature as to justify an adjustment in cost or period of performance. The contractor shall refer to the basic contract for further information and guidance on any technical directions issued under this task order.
Attachment
Any modifications to the scope of work, cost, or period of performance of this task order must be issued by the Contracting Officer and will be coordinated with the Project Officer. Specific tasks under this task order are:
- 1. Inspection preparation on, or about, October 25-29, 2004 at the region office.
- a.
Obtain a thorough understanding of the selected system(s) by review of licensee provided documentation.
- b.
Develop a list of questions or areas of concern.
- c.
develop a risk informed inspection plan.
- 2. On-site inspection on, or about, November 1-5, 2004 and November 15-19, 2004. Review and document inspection activities in the contractor's office on, or about, November 8-12, 2004.
- a.
Perform the inspection in accordance with Inspection Procedure 71111.05, MFire Protection".
- b.
Discuss potential findings with the Team Leader.
- c.
Document items such as inspection scope and list of documents reviewed.
- 3. Inspection documentation on, or about, November 22-26, 2004 in the contractor's office.
Final inspection report input is due on or about, November 29, 2004.
- a.
Follow the guidelines of NRC Inspection Manual Chapter 0612, uPower Reactor Inspection Reports", as directed by Team Leader.
- b.
Twenty hours is normal for the documentation week. Dependent on risk significance of findings, actual hours could differ (at the discretion of the Team Leader).
REPORT REQUIREMENTS During Tasks 1 and 2, the contractor shall provide an inspection plan and inspection related documentation, as directed by the Team Leader.
At the end of Task 3, a feeder to the final inspection report shall be provided to the Team Leader in an electronic format acceptable to the Team Leader. A hard copy shall be provided to the Project Officer. The contractor shall not undertake any further efforts toward report finalization, such as management review of the feeder report.
TRAVEL (for estimating purposes only)
One 5 day trip to the region office.
Two 5 day trips to the plant site.
The contractor shall coordinate all travel arrangements in advance with the NRC Team Leader.
Attachment
I 11 NRC FURNISHED MATERIAL Documents required to prepare for the inspection will be provided by the NRC Team Leader.
OTHER APPLICABLE INFORMATION The work specified in this SOW is 100% licensee fee recoverable. The contractor shall provide fee recovery information in the monthly progress reports in accordance with the requirements of the basic contract.
Attachment